A set of dark tone shaker cabinets rarely arrives on site as a flat-pack surprise. It arrives as casings, wall units, base units, tall units, islands, doors, worktops and hardware, often across two or three container loads, weeks before the trades who will fix them in place. The cabinets are not the hard part of the schedule. The coordination around them is. Below is how we sequence delivery and installation on custom cabinetry projects, stage by stage, so that the joinery lands when the site can actually receive it.

Why dark shaker cabinetry needs its own slot in the programme

Shaker doors are a five-piece construction: a flat centre panel inside a square frame of four rails and stiles. That profile is what gives the style its quiet, traditional read, and it is also what makes the schedule matter. A slab door that is chipped on arrival can often be sanded out. A chipped shaker stile or rail usually means remaking the part, because the moulded profile cannot be patched without the joint line showing.

Dark finishes add a second constraint. On a deep espresso, charcoal or dark wood-grain surface, every scratch, glue bloom and edge chip catches the light. Dark panels also show dust and adhesive residue far more readily than a white or light-wood equivalent, which is why the room needs to be clean and dry before the doors come out of the cartons.

Because these are made-to-measure units — size, layout, material and finish are set per project — there is no shelf replacement. If a dimension is wrong or a load arrives late, the fix runs back through production and then back through freight. Every decision below exists to keep that loop from opening.

Stage 1: Lock the openings before anything is cut

Custom cabinetry is only as good as the dimensions it is built against, and a kitchen is one of the least forgiving rooms in a building. Before production starts, we ask for final site dimensions taken after the floor finishes, plaster or wall linings, and the services rough-in are all complete.

  • Floor level. Record finished floor levels across the whole run. A fall of a few millimetres over four metres shows up as an uneven scribe line at the ceiling or a gap at the toe kick.
  • Wall plumb and square. Note which walls are out of plumb, so casings can be scribed on site rather than assumed square in the factory.
  • Services positions. Waste outlets, water feed, isolators, extractor ducting and power points, each marked with a measured position from two faces.
  • Appliance schedule. Models and dimensions for built-in ovens, fridge, dishwasher and hob, confirmed before the tall and base units are sized around them.
  • Window reveal and door swing. Confirm heights of reveals and which way doors open, so end panels do not foul the opening.

We then issue shop drawings for sign-off rather than working from the architect's concept elevation. Anyone approving the layout should be someone who will be on site at handover — a builder, site supervisor or project manager — because the drawing is what the installation crew works to.

Stage 2: Sequence production against the site programme

Once drawings are signed, the order enters production. What matters commercially here is not just how long manufacturing takes, but when it finishes relative to the wet trades in the room.

Cabinet elementSite condition needed before installation
Casings and wall unitsPlaster or lining complete and dry; floor finishes laid; room enclosed and weathertight
Base units and islandServices rough-in tested and pressure-tested; floor protected
Tall units and pantryCeiling set-out confirmed; access route clear for full-height panels
Doors, drawers and hardwareUnits fixed, levelled and aligned; room free of cutting dust
WorktopsBase run fully installed and signed off, so templating or final sizing is against the real run

The most common sequencing error on residential kitchens is having the cabinets ready while painting, tiling or screeding is still wet. Painted and lacquered components should not be opened in a room that is still drying, because moisture and dust settle into the finish. Where the site programme slips, it is usually better to hold the shipment at the port or in bonded storage than to force an early delivery into an unready building.

Stage 3: Plan freight around the receiving point, not the factory gate

Our logistics and door-to-door delivery service covers freight forwarding by sea, air or rail, packaging and container loading, customs documentation such as commercial invoices, packing lists and certificates of origin, shipment tracking, and delivery to the project address. Terms, duties, insurance and transit time are confirmed per project rather than assumed, since those depend on the destination and the order.

For a cabinetry order specifically, three freight decisions do most of the damage when they are left late:

1. Consolidation versus separate shipments

Cabinets shipped with flooring, doors or lighting from the same supplier save handling cost, but a mixed container means the whole consignment waits on the slowest item. Where the kitchen programme is tight, we split the cabinetry onto its own loading so it can move as soon as it passes inspection.

2. Packaging that suits the actual access route

A crate sized for a factory dock is not automatically right for a terrace kitchen or an apartment floor. We confirm the delivery path — lift dimensions, stair widths, turning landings, gate heights — before crates are dimensioned, and mark each crate with the room and run it belongs to so the crew can sort at the kerb rather than in the hallway.

3. A named receiving contact

Container deliveries need someone on site to sign, count crates against the packing list and note any damage on the delivery paperwork before the carrier leaves. A missed crate noted three weeks later is a much harder claim than one recorded at the gate.

Practical rule: book the delivery slot only after the builder confirms the room is enclosed, dry and clean, and after the access route has been physically checked by whoever will carry the crates in.

Stage 4: Receiving and inspection on the day

  • Crate count matches the packing list, crate by crate.
  • External damage photographed before the crate is opened.
  • Doors and panels checked for edge chips and finish damage, with the part number from the drawing recorded for any replacement.
  • Hardware, hinges, runners and integrated lighting counted against the schedule.
  • Crates stored flat, indoors and dry — never leaning against a wall, never on a bare screed.
  • Any shortage or damage reported the same day, with photographs and the drawing reference.

Stage 5: Installation sequence and the handover record

Our installation and after-sales support service covers on-site installation, inspection and snag resolution, warranty coverage, spare parts and replacement, and ongoing maintenance. On a dark shaker kitchen the crew sequence runs in a fixed order, because each step depends on the one before it being signed off.

  1. Lay out and dry-stack. Units placed loosely against the drawing so gaps and scribe widths can be seen before fixing.
  2. Fix casings first. Levelled along the run and scribed to the wall; the whole kitchen hangs off this line.
  3. Join and level base units. Carcasses linked, levelled front-to-back and side-to-side, then anchored.
  4. Fit tall units and pantry. Full-height panels placed with the ceiling interface confirmed.
  5. Hang doors and fit drawers. Hinges adjusted for consistent gaps across the whole run — on dark shaker fronts, an uneven gap is far more visible than on a pale finish.
  6. Fit hardware and integrated lighting. Handles, runners, internal bins and any in-cabinet lighting connected and tested.
  7. Clean and protect. Surfaces wiped down, protective covering reapplied, and the room closed off until other trades have finished.

Handover should produce a short written record: the signed drawing as installed, a list of any site-trimmed or scribed items, the finish reference used, and the snag list with what was resolved on the day. That document is what makes later service requests — a replacement door panel, a spare runner — quick to action, because the part can be identified from the drawing instead of measured off the wall.

Stage 6: Coordination that keeps the whole package aligned

Kitchens rarely sit alone in an order. A villa or apartment fit-out usually pairs cabinetry with furniture and building materials from the same programme: flooring that has to be laid before the base units go in, doors and wall panelling whose reveal lines have to match the cabinet run, lighting and switch plates positioned against the shop drawing.

Treating those as one coordinated package rather than separate purchases removes a familiar set of failures: worktops templated before the floor is laid, tiles that clash with the scribe line, or power points left behind a tall unit because nobody read the joinery drawing. Where the specification calls for a whole-house run — cabinetry, doors, panelling and joinery in one finish family — we produce those together so the tones and grain match across the job.

A short pre-delivery checklist

  • Shop drawings signed by the person who will be on site at handover.
  • Final dimensions taken after finishes and services rough-in, not from design-stage drawings.
  • Appliance models confirmed and given to production.
  • Delivery date set against a room that is enclosed, dry and clean.
  • Access route checked: lift, stairs, gates, turning space.
  • Named site contact available on the delivery day to receive and inspect.
  • Storage identified indoors, flat and dry, away from wet trades.
  • Snag and replacement process agreed in writing before the first crate is opened.

Common questions

Should cabinets be delivered before or after the floor is laid?

After, in almost every case. Base units sit on the finished floor, and delivering early means crates standing in an active working room. The exception is a full-height run that cannot pass through the finished doorway — worth checking at the access-route stage.

What happens if a dark door panel is damaged in transit?

The part is identified from the signed drawing by its reference and remade to that specification, then shipped on the next consignment or as a single-piece air shipment where the programme demands it. This is why the drawing reference must be recorded at inspection, not reconstructed later.

Can the installation crew work alongside other trades in the same room?

Not for the door-hanging and finishing stages. Cutting, sanding and painting generate dust that settles into a dark finish and into hinge mechanisms. The clean order is: wet trades complete, room cleaned, cabinets installed, then soft furnishing and final dressing.

If you are specifying a kitchen for a villa or apartment project and want the delivery window and installation sequence planned alongside production rather than bolted on afterwards, send us the drawings and the site programme. We will confirm what the room needs at each stage before anything is cut.