Textured wall panels look simple on a mood board and complicated on site. The difference is almost always the specification document. This guide walks through the fields a purchasing team should lock down before a panel order is released, using Santerson Textured Panels as the reference product.
Why textured panels need a written specification
A flat laminated sheet can be ordered from a colour code and a drawing. A textured panel carries depth, direction, joint detail and light behaviour, so two orders that read as identical on a schedule can arrive looking quite different once they are on the wall. In our experience supplying villa and hospitality projects in Australia and the Middle East, the disputes that reach after-sales almost never concern the texture itself. They concern what was never written down: which face is visible, how the edge is finished, where the panel stops.
Santerson Textured Panels sit within our Paneling Systems collection and are made to measure for each space. Finish, layout and dimensions are specified per project rather than chosen from a fixed size grid. That flexibility is the point of the product, and it is also the reason a blank specification sheet is risky: there is no default order to fall back on.
What the Santerson Textured Panels line actually covers
The listing describes configurable textured wall panels for residential wall system projects, with made-to-measure sizing and a choice of material and finish. Three things follow from that description, and each one should appear in your document:
- Sizing is project-specific. There is no standard module to assume. Every opening, return and ceiling height has to be stated or drawn.
- Material and finish are options, not constants. The same panel geometry can be produced in different substrates and surface treatments, and they behave differently around moisture, impact and cleaning.
- Scope is confirmed per project. Fixing method, edge trim and any sub-frame are agreed with the factory for the specific job, not inherited from a previous one.
The six fields to complete before you request a quotation
Work through these in order. The first two decide the product; the rest decide whether it fits on site.
1. Substrate and service condition
State where the panel is going and what it will be exposed to: a dry bedroom wall, a corridor with luggage traffic, a bathroom outside the direct shower zone. Surface treatments such as lacquer, laminate, veneer or stone respond differently to humidity and abrasion, and the manufacturer needs the condition to recommend a build. Where a wet area is involved, say so explicitly rather than leaving it to be inferred from a floor plan.
2. Texture direction and light
A ribbed or relief surface reads one way under ceiling wash-light and quite another under a grazing light at the skirting. Record the intended direction of the texture on the elevation drawing, note whether panels run floor-to-ceiling or are cut by a rail, and mark which faces receive grazing light. If you want joints to disappear, that has consequences for both panel width and the flatness tolerance of the wall behind.
3. Panel layout and joint detail
Send a dimensioned elevation, not just a floor plan. Mark each panel width, the position of every joint, and how corners and returns are handled — mitred, trimmed or closed with a shadow gap. A layout drawing settles in one email what would otherwise take three rounds of questions.
4. Fixing method and sub-frame
Confirm how the panels attach: direct adhesive to a prepared substrate, or onto a battened sub-frame that creates a service cavity behind. A sub-frame changes the finished wall line by several centimetres, which affects door reveals, skirting junctions and where built-in furniture lands. Decide it before the joinery drawings are issued, not during installation.
5. Interface with adjacent trades
List what the panel meets at each edge: flooring, ceiling, architrave, a niche, an integrated light line. Textured panels are frequently ordered without the reveal that closes them, and the site then improvises. If you want a concealed cove or a shadow gap, draw it.
6. Sample approval before release
Approve a physical sample of the exact finish, at a size that shows the texture at the intended viewing distance, and keep the signed sample as part of the contract record. Photograph it against the wall finish you plan to use alongside it. This single step prevents most colour and depth complaints.
Specification sheet: fields we ask buyers to fill in
| Field | What to record |
|---|---|
| Room and exposure | Room name, moisture level, traffic level, cleaning regime |
| Total panelled area | Square metres per wall, with the elevation drawing attached |
| Panel size and run | Width, height, floor-to-ceiling or cut, orientation of texture |
| Substrate | Board type and grade as confirmed with the factory |
| Surface finish | Finish name or sample reference, sheen level, grain direction |
| Edge and joint detail | Mitred, trimmed, shadow gap; joint spacing |
| Fixing | Adhesive or sub-frame; substrate preparation required |
| Interfaces | Floor, ceiling, architrave, reveal, integrated lighting |
| Sample status | Sample reference, date approved, who signed it off |
| Delivery and packing | Ship-to address, container or consolidated shipment, labelling by room |
Panels are usually packed and labelled by room or elevation. Ask for that labelling in writing; it is the difference between a two-person installation and a week of sorting crates.
Choosing between fixed and sliding textured panels
The same surface treatment is available in our Textured Sliding Panels, which move on hardware instead of being fixed to the wall. Choose the sliding version when the panel has a second job: closing a wardrobe bay, screening a niche, re-dividing a room. The specification then gains a second set of decisions — track type, load rating, panel weight, overlap and stop position — and those have to be agreed with the factory for the selected configuration, since hardware depends on the size and finish you have chosen.
If the wall is purely decorative and never opens, fixed panels are the simpler order. If the panel hides something you need to reach, specify the sliding version from the start; retrofitting a fixed installation into an opening one is not a clean conversion.
How specification fits into a one-stop supply order
Wall panels rarely arrive alone on a project. On a villa fit-out they travel alongside wall panel systems for the bathrooms, cabinetry, flooring and lighting, and it is worth specifying them against one coordinated set of drawings so finishes match across trades.
SANTERSON works as a single supplier across furniture and building materials, from design consultation and material selection through manufacturing, quality control and door-to-door delivery. The workflow we run is consultation, design and planning, production, logistics, installation and after-sales. A complete panel specification shortens that path: the quotation comes back accurate at the first attempt, production starts without a query cycle, and the panels arrive labelled for the walls they belong to.
A good panel specification answers every question the factory would otherwise ask you, before it asks.
Common specification failures we see on project sites
- A colour code with no sample. Two finishes can share a name and still differ in sheen; the texture changes how sheen reads.
- Elevations missing from the enquiry. Area in square metres tells the factory nothing about joint positions or panel widths.
- Fixing left open. Deciding on site usually means an improvised sub-frame and a shifted wall line.
- No reveal ordered with the panels. The closing trim is small, easy to omit from a schedule, and impossible to match afterwards.
- Sliding hardware specified by look rather than load. Panel weight and height determine the track; a good-looking system that carries the wrong load fails early.
A short worked example
Consider a villa bedroom where the textured panel runs behind the bed head, three metres wide and full height, with a concealed light line at the top edge. A usable specification for that wall records: the room and its dry, low-traffic condition; 3.0 m by floor-to-ceiling height taken from site survey; four equal panels with slim joints, texture running vertically; the substrate and finish confirmed from an approved sample; a shadow gap at the ceiling where the light line sits; direct fixing to a prepared wall with a battened zone for the lighting channel; and a labelled crate marked for the master bedroom. Sent as one email with an elevation drawing, that enquiry can be quoted without a query round.
Questions buyers ask us
Can panel sizes be changed after production starts?
Not practically. Panels are cut to the approved layout, so changes have to be raised before release. Any revision should come with a re-issued elevation drawing.
Do you supply the panels only, or the whole wall build?
The panel scope covers the panels and the details agreed for that project. Sub-frame, substrate preparation and on-site trades can be coordinated as part of a turnkey fit-out, which is where our installation and after-sales support normally comes in.
Can the same finish be used across wall panels and joinery?
Yes, matching finishes across cabinetry and wall cladding is one of the reasons buyers consolidate with a single supplier. Specify the finish once and reference it on every schedule.
Send us your panel schedule
Share the elevation drawings, room list and finish references for your project and we will confirm material, build-up and sizing for each wall — then quote against the drawing rather than an estimate.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
- Elevation drawings attached to the enquiry
- Room conditions and exposure stated
- Substrate and finish confirmed from an approved sample
- Joint, edge and reveal details drawn
- Fixing method and sub-frame decided
- Sliding hardware specified by load where panels move
- Packing and room labelling requested