Open-and-closed media walls work because they do two jobs at once: the closed sections hide consoles, games, cables and clutter, while the open sections carry books, ceramics and lighting. That balance is exactly why Santerson Open & Closed Combo Units appear on villa and apartment drawings so often — and why the quotation stage decides whether the finished wall matches the drawing or fights it.

These units sit in the TV Cabinets / Media Units collection. Each one is specified per project: dimensions, material, finish and the split between open shelving and closed cabinets are all chosen to suit the room. A quote request therefore needs more than a length and a colour. The checklist below covers what our estimators actually use when they price a combo unit.

What this product family is

A combo unit is one run of joinery that mixes open bays with closed storage — carcasses with doors, drawers or flaps, plus open shelves for display. Because the layout is made to measure, the same elevation can be quoted as a low media cabinet under a wall-mounted screen, a full-height feature wall, or a floating unit with a niche left clear for a fireplace. Related layouts in the same collection include freestanding TV cabinets and media units with integrated LED lighting, so we can hold finish and carcass detail consistent when a project mixes the two.

As a one-stop furniture and building materials supplier, SANTERSON manufactures these units alongside the kitchen cabinetry, wardrobes, wall panelling, flooring and lighting that surround them in the same room. For interior fit-out projects, that means one production schedule and one shipment instead of several trades reconciling different tolerances on site.

Before you send the enquiry: three decisions to settle

1. The open-to-closed ratio

Decide what the unit has to hide and what it has to show. A media wall over a fireplace usually carries shallow open niches for display and deep closed cabinets below for hardware and games. A living room used by children often inverts that: closed storage at eye level, open shelves kept low. Send us your preferred ratio even as a rough sketch — "half open, half closed" or "mostly closed with two lit niches" changes the panel count, hardware count and price materially.

2. Fixing method and wall build

Tell us whether the unit is freestanding, wall-mounted or recessed into a niche, and what the wall behind it is — masonry, stud partition, timber frame or an existing finished surface. Floating and full-height units need substrate detail before we can specify brackets, cleats and fixings; that information also determines whether the wall needs packing or a bearer frame during installation.

3. Services, appliances and lighting

List everything that has to pass through or sit inside the unit: TV brackets and screen size, soundbar position, speaker runs, power outlets, USB points, low-voltage cable trays, LED strip in niches, transformers and where they must be reachable for maintenance. Cut-outs are cheaper specified at quotation stage than corrected after the carcass is machined.

Information to include in your quote request

Send the following and we can usually return a priced proposal with a specification sheet rather than a ballpark figure:

ItemWhat to provide
DrawingsPlans and elevations, PDF or DWG. A hand-dimensioned sketch works if drawings are not ready.
Overall sizeWidth, height and depth of the run, plus floor-to-ceiling height and any obstructions such as skirting, cornices, switches or flues.
LayoutOpen bays versus closed sections, shelf spacing, drawer count, and which sections you want lit.
Screen and equipmentTV size and mounting type, soundbar, consoles, receiver, safe position of ventilation gaps.
Materials and finishBoard or substrate preference if you have one, plus finish family — matte, high gloss, wood veneer, textured melamine — and any samples or reference images. Send RAL or manufacturer colour codes where they exist.
HardwareHandles or handleless, soft-close doors, push-to-open, drawer runners, hinges, integrated lighting.
Project contextRoom type and quantity of units, project location, delivery address and your target programme date.
If you are specifying several rooms at once, send the media wall together with your kitchen, wardrobe and pantry enquiries. Sharing carcass material, edge detail and finish across them keeps the joinery consistent and simplifies production coordination.

How the quotation is prepared

Enquiries follow the same route as our other custom work: a design consultation covering space planning and product specification, then material selection and a written quotation with confirmed details, then production and quality control. For combo units this stage produces shop drawings showing elevations, shelf positions, cut-outs and hardware schedules for your sign-off before any panel is cut.

Where a project needs it, we handle prototyping and bespoke finishes through our custom and OEM service, and coordinate the surrounding finishes — panelling, flooring, lighting — under the same project management. Freight is arranged by sea, air or rail with export paperwork and door-to-door delivery to the site; installation and after-sales support are available as separate stages in the programme.

Because our service pages carry response-time and warranty claims that vary by scope and destination, we confirm lead times, delivery terms and warranty coverage for your specific project in writing at quotation stage. We do not publish those figures as fixed guarantees.

Questions buyers ask us before they commit

  • Can the unit be built to non-standard depth? Yes — depth is set per project, and we will confirm what the room allows once you send elevations and equipment details.
  • Can finishes match my kitchen cabinetry? Send the finish reference or a sample. Veneer, lacquer, acrylic and textured melamine families are all specified by code where one exists.
  • Is lighting wired and tested before shipping? LED positions, transformers and access points are shown on the shop drawings; electrical connection on site follows your local arrangement and is confirmed with you in advance.
  • What if site dimensions move? Send a final measured survey before release to production. Where site works are still open, we note the tolerance band on the drawing so the fix can be priced rather than improvised.

Send your enquiry

Email drawings and the details above to santerson@qq.com, or reach us on WhatsApp at +86-13928214007 (attention: PHILLIP). Tell us the room, the quantity of units and your programme date; we will come back with a specification and quotation, and flag anything that needs a decision before production.

Specifications, finishes, hardware and delivery arrangements for each unit are confirmed project by project on the drawings and quotation. The details in this article describe how to request a quote, not fixed performance or compliance guarantees.