A glass-front cabinet looks simple on a rendering and complicated on site. Frame profile, door opening direction, glass type, interior lighting and the wall it sits against all have to agree before production starts. This guide uses our Santerson Glass Front Pvc Cabinet to show how we read a set of design drawings, what we send back to the designer or contractor, and which site conditions must be settled before an order for this cabinet type is released.

What the product actually is

The Glass Front Pvc Cabinet is one design within our PVC kitchen cabinet collection. Like the rest of that range, it is supplied made to measure: dimensions, material and finish are set per project, and the layout follows the drawings rather than a fixed catalogue size. That single sentence carries most of the coordination work, because nothing about this cabinet can be locked from a product photo alone.

Two rules follow from it. First, we quote and produce from dimensioned drawings, not from a nominal "900 mm unit". Second, every specification is confirmed in writing for the specific order - the same design can be built with different substrates, film finishes, glass and hardware depending on where it is installed.

Reading the drawings: the six items we check first

When a project pack reaches us - layout plan, elevations, sections, finish schedule and any joinery detail - we review it in a fixed order. Any gap in these six items becomes a request for information before pricing is finalised.

Drawing itemWhat we confirm from itCommon problem if it is missing
Cabinet setout and overall dimensionsWidth, height and depth of each unit, run lengths, and how units abut walls, returns and appliancesUnits ordered to nominal sizes that do not fit the finished room
Elevation of glazed doorsDoor count per bay, mullion positions, handle side and opening directionGlass fronts that clash with a door swing, window reveal or appliance handle
Finish schedulePVC film colour and texture - high gloss, matte or wood grain - and whether the glazed bays match adjacent solid doorsA sample approved on one door type being assumed to read the same through glass
Shelving and interior layoutShelf heights, adjustable or fixed, drawer stacks below the glazed bays, integrated bins or traysGlass cabinets delivered with an interior that does not suit what will be stored in them
Lighting and servicesInternal LED strips or puck lights, driver position, switch or sensor location, cable routeNo power or no driver access behind a lit display cabinet after the wall is closed up
Adjacent finishesFloor build-up, wall lining, skirting, benchtop thickness and splashback setoutCabinet carcass dimensioned before the floor level is fixed, leaving an unlevel run

Send us drawings, or send us a room: two ways to start

Projects reach us in two states, and both work as long as the information is complete.

1. Designer-issued drawings

If an interior designer or architect has already set the joinery, we work from their pack. We return a shop-drawing set for approval: unit-by-unit dimensions, door and drawer elevation, glass and finish callouts, lighting positions, and interface details at walls, ceiling and floor. Production starts only after that set is signed off. Where the design intent sits with our team instead, our interior design service covers space layout planning, concept and mood boards, furniture layouts and 3D visual renderings, plus drawing and production coordination with on-site guidance.

2. Site measurements without full joinery drawings

For renovations and villa fit-outs there is often a floor plan but no cabinet elevation. In that case we ask for measured site data - run lengths, room height at several points, the position of outlets, switches, waste pipes, windows and doors, and finished floor levels - and we draft the elevations from it for your review. Site data should be taken after wall linings and the finished floor level are fixed, or the numbers will move.

Site requirements that decide the specification

The same glass-front design is specified differently depending on where it stands. These are the site conditions we ask about before confirming materials:

  • Humidity and splash exposure. Kitchens, laundry areas and wet pantries need a moisture-resistant substrate and sealed edges. For external or semi-external settings such as an outdoor kitchen, we point buyers to Santerson Outdoor Ready PVC Cabinets instead of assuming an indoor specification will hold up outdoors.
  • Level of the slab or screed. Long runs of base units need a known floor level and shim allowance; adjustable feet have limits, and a fall across the run shows up in the door lines once glass is fitted.
  • Wall construction behind wall-hung units. Solid masonry, steel stud with ply backing or a lined timber frame each need a different fixing detail. Tell us the wall type before we size a wall cabinet with glazed doors.
  • Traffic and wear. A private kitchen and a serviced-apartment or hotel suite take different handling frequencies. Fingerprints, edge wear and cleaning products all push the choice between High Gloss PVC Cabinets and matte pvc cabinets. In contract work, specify the film with a cleaning schedule agreed with the operator and check the sample against repeated wiping before sign-off.
  • Glass type and safety requirement. Toughened glass is what we normally fit to glazed cabinet doors; thickness, tint and any frosted or reeded pattern are confirmed per project, together with the safety glazing requirements that apply to the building. We need those requirements stated by the specifier - they are set locally, not by us.
  • Access route to the room. Assembled tall units need a lift, stairwell, doorway or crane path. Where the access is tight we advise on knock-down construction and on-site assembly early, not at delivery.
Where a project needs cabinetry beyond one kitchen - wardrobes, vanity units, media walls, pantry and laundry joinery from the same finish schedule - we coordinate those items as one package so that film colour, edge treatment and hardware match across the whole floor.

How our custom and OEM service fits a specified cabinet

The PVC kitchen cabinet is not sold as a fixed SKU, so the specification can move in several directions: made-to-measure sizing to the millimetre of the site; substrate and core selection for the environment; PVC film colour and texture matched to a sample; door profile, including shaker fronts if the project calls for Santerson Shaker Style PVC Cabinets; glass type, thickness and pattern; hardware brand, soft-close specification and handle style; internal fittings and lighting. Our custom and OEM service also covers bespoke finishes and textures, prototyping, flexible minimum order quantities and brand marking for repeat developments and builders who want their own label on the joinery package.

For a multi-unit development we hold one approved reference - a sample door with glass, lighting driver and hardware fitted - and produce to it. That single step removes most of the arguments about gloss level, film grain direction and glass tint during handover.

Delivery, installation and handover

Glass-front units need more planning in transit than solid-door ones. We handle logistics and door-to-door delivery, including packaging and container loading, freight forwarding by sea, air or rail, customs documentation such as commercial invoices, packing lists and certificates of origin, and shipment tracking. Glazed doors travel protected and, on many projects, glazed and carcass components are packed so that glass is fitted on site after the building is closed in and dry.

On the ground we provide installation and after-sales support: setting out and levelling the carcass run, hanging and aligning glazed doors, fitting lighting, and walking a snag list with the site team before handover. Alignment on glass-front doors is unforgiving - a carcass that is 2 mm out of level reads clearly through the glazing line - which is why we would rather see the floor levels and wall setouts on a drawing than discover them on the day.

A short checklist before you order

  • Dimensioned elevations for every glazed bay, with opening directions marked.
  • Finished floor levels and finished wall faces confirmed, not assumed.
  • Wall type noted for all wall-hung units.
  • Approved finish sample identified by the door it was made on.
  • Glass type, thickness and pattern agreed, with safety requirements stated.
  • Power, driver position and switching shown for any lit cabinet.
  • Access route to the room checked for assembled or knock-down units.
  • One named approver for the shop drawings, so sign-off is not split between parties.

If you have drawings for a kitchen or joinery run and want them reviewed against these points, send the pack with the site conditions noted and we will come back with a priced specification, a shop-drawing set and any queries that need answering before production.

SANTERSON - furniture and building materials manufacturer and one-stop project supplier, working from China with offices in Vietnam, Singapore and South Africa. Send drawings or measured site data for a made-to-measure glass-front PVC cabinet package through our contact page, or reach PHILLIP directly on phone/WhatsApp +86-13928214007, email santerson@qq.com.