A swim spa is one of the few wellness amenities that works on a villa terrace, a resort pool deck or a hotel rooftop podium without the footprint of a full swimming pool. The Outdoor Swim Spa WS-PC08ST-L is the longest shell in our configurable swim and hydrotherapy range, and that extra length is exactly what makes it useful for hospitality and private-residence work. Below we set out where this model fits, what has to be confirmed before an order, and how it slots into a wider furniture and building-materials package.

What the WS-PC08ST-L actually is

The unit is an acrylic-shell swim spa with a reinforced cabinet, delivered as a self-contained water appliance rather than a built pool. The catalogue lists the shell at 8490 × 2400 × 1470 mm, with one control system, one swim training system, one filter pump, six jets and four LED lights, and a total power figure of 6.55 kW. Ozone is shown as a listed feature.

Two points matter for specifiers. First, the water pump entry on our product page reads "Not listed pcs", so pump quantity belongs in the quotation conversation, not in a datasheet you copy into a schedule. Second, the options list — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — is catalogue-wide; availability and compatibility change with the configuration you choose. We confirm the exact equipment set and the electrical requirement for that configuration before production.

ModelWS-PC08ST-L
Catalogue dimensions8490 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW
Water pumpNot listed on the product page — confirm in quotation
Features shownWater jets, LED lighting, Ozone, Swim training system

Hotel and resort projects: guest rooms first, then the wellness floor

In a hotel or resort, the strongest case for this size of swim spa is privacy. A single unit on a private terrace or in an enclosed courtyard suite turns a standard room into a bookable premium category, and it does so with a factory-built appliance instead of concrete, tankproofing and tiling trades running on your programme. The 8490 mm length gives the guest enough water column for a genuine swim against the current, which is the difference between "a big jacuzzi" and a facility a fitness-minded guest will pay for.

The second use is shared wellness space: a spa deck, an executive floor, or a members' area where a full lap pool cannot be justified on construction cost or structural load. Here the swim spa serves morning exercise and hydrotherapy in one footprint, and the LED lighting and jet package let the same room run evening ambience without extra fixtures. Where several units are specified, we group them with the rest of the wet-area procurement — bathroom ceramics, showers and vanities — so one supplier handles the wet-area package rather than splitting it across several vendors.

Villa projects: terraces, garden edges and basements

For a private villa, the WS-PC08ST-L suits three positions. On a terrace or podium deck, it replaces a pool where the plot or the structure will not carry one. Along a garden edge or beside an existing swimming pool, it becomes the heated, year-round option while the main pool sits idle in cooler months. Below ground, in a basement or garden pavilion, the same shell works as an indoor training lane, and that is where the insulation and heat-pump options on our accessory list earn their cost.

The length also solves a practical layout problem. Owners rarely want 8.5 m of water appliance in the middle of a patio, but they will accept it along a boundary wall, in a courtyard run, or under a pergola. Paired with the outdoor furniture we supply for the same site — lounge sets, dining sets and cabana daybeds — the swim spa anchors an outdoor room instead of sitting in it as an isolated piece of equipment.

What to confirm before you specify it

  • Access and rigging. The shell travels as a complete unit. Check the route from the delivery vehicle to the final position: gate widths, turning radii, crane or lift access on an upper terrace, and whether planting or paving has to come up and be relaid.
  • Structural support. A fully filled unit is a heavy point load. On a deck, podium or balcony this needs the structural engineer's sign-off before the layout is fixed; on ground, a properly prepared base is required.
  • Power and protection. The catalogue total power figure is 6.55 kW. Confirm supply capacity, circuit sizing and protective devices with the project electrician for the configuration actually ordered, not the brochure version.
  • Equipment scope. Pumps, filtration choice, heat pump, UV or ozone, insulation and steps all change the quotation and the plant space needed beside the unit.
  • Local approval and installation responsibility. Permits, electrical inspection and any pool or barrier requirements are set by the local authority. We work with your team on site conditions; we do not decide what your jurisdiction requires.
Specifications above are transcribed from our published product page for this model. Where an entry reads "Not listed", treat it as an open item to close in the quotation, not as a zero. Confirm included equipment and electrical requirements for the selected configuration before ordering.

How it comes with the rest of the project

As a furniture and building materials manufacturer, we rarely ship a swim spa alone. On Australian villa and hospitality work, the same order typically carries outdoor lounge and dining sets, bathroom ceramics and shower systems, lighting, cabinetry, wall panelling and flooring. Buying those together means one production schedule, one container plan and one point of contact for snags — which is where most project budgets quietly leak when a dozen separate suppliers each deliver on their own timeline.

Our project services cover design consultation and space planning, material selection and product specification, manufacturing and quality control, freight and door-to-door delivery, then installation support and after-sales. Freight is arranged by sea, air or rail with the paperwork handled on our side; transit time, duties and Incoterms are agreed case by case for the destination, and we do not publish a guaranteed lead time that depends on your port and site readiness.

Specifying a swim spa for a hotel, resort or villa? Send us the floor plan, the intended position of the unit and the access route, and we will come back with the configuration, the equipment list and the plant space required. Browse the full range at Swimming Pools and Swim Spas, or contact us directly to start a quotation.

Common questions

Is the WS-PC08ST-L different from the WS-PC08ST?

Both sit in the same configurable range with the same listed feature set — jets, LED lighting, ozone and a swim training system. The catalogue dimensions differ: 8490 mm against 8000 mm in length, with width and depth shared at 2400 × 1470 mm. Choose on the space you have and how much swimming lane you want; confirm each model's equipment list separately.

Can it be used outdoors all year?

The shell is an outdoor product, and heating, insulation and filtration options exist precisely so the water can be held at a usable temperature outside warm months. What "all year" means on your site depends on climate, heat-pump sizing and running-cost expectations — we size that with you rather than assume it.

Do you install it?

We provide installation support and after-sales service as part of a project package, working alongside your local contractors for base preparation, electrical connection and any inspections. Tell us the country and site condition early so the scope is written correctly into the contract.