A swim spa decision rarely starts with a model number. It starts as a drawing, a mood board and a line on a budget sheet: an outdoor pool for a villa terrace, a plunge-and-swim pool beside a resort suite, or a hydrotherapy pool in a garden courtyard. The hard part is turning that brief into something a factory can price and build. This guide walks through the enquiry process using one catalogue item from our range as the worked example, Outdoor Swim Spa WS-PC05CH, so you can see exactly what information moves a conversation from "we are interested" to a firm quotation.
Start with the space, not the shell
Before anyone asks about jets or lighting, fix the physical envelope. For an outdoor swim spa that means the clear footprint on site, the access route from the delivery vehicle to that footprint, and the finished floor level around the installation. A unit set into a deck needs the deck dimension resolved before the shell is made, not after; a unit sitting on a plinth needs the plinth built to the shell's base.
Send us a plan drawing with three numbers marked: the maximum length and width you can accommodate, and the height restriction if the spa sits under a pergola, canopy or overhang. If the site is in an apartment terrace, rooftop or courtyard, tell us at the same time whether a crane, hoist or manual carry is available. That single sentence changes both the configuration options and the freight plan.
Match the brief to a catalogue size
Most briefs fall into one of three uses: lap swimming against a current, hydrotherapy and massage seating, or a mixed pool that has to do both for a family or a small group of hotel guests. That choice drives depth, seat layout and pump arrangement far more than it drives aesthetics.
The catalogue entry for WS-PC05CH shows an external size of 5000 x 3000 x 900 mm. Treat that as a starting envelope to test against your plan, and confirm the water depth and seat positions with us before you draw the surrounding deck. Where a deeper or shallower pool suits the users better, we have other sizes in the same configurable swim and hydrotherapy range, including Outdoor Swim Spa WS-PC05 at 5000 x 3000 x 1100 mm with four water columns. If the space is irregular, a bespoke form is possible: our Customizable Shape Outdoor Spa covers square, round, oval and curved shells on an acrylic body with structural reinforcement, for gardens, terraces and leisure areas where a rectangular pool simply will not sit.
What the catalogue sheet already answers
For WS-PC05CH the published specification gives you a defensible starting point for an enquiry. It is not a promise of what ships on your order, and we will not quote from it alone; it tells us which questions still need closing.
| Catalogue item | Shown value | What to confirm in the enquiry |
|---|---|---|
| Model | WS-PC05CH | Exact model code and any suffix for your market or configuration |
| Catalogue dimensions | 5000 x 3000 x 900 mm | Shell size against your deck, plinth and access route |
| Jet total | 30 pcs | Jet count, type and position versus the massage zones in your brief |
| Water pump / filter pump | 1 pc each | Pump duty for your water volume and expected daily use |
| Control system | 1 set | Control location, user access and whether a second control point is needed |
| LED lights | 1 pc | Fitting count and colour scheme against the landscape lighting design |
| Total power | 2.45 kW | Whether this figure covers only the standard equipment listed, before heating |
| Features shown | Water jets, LED lighting, ozone | Which of these are included in your quotation and which are options |
Note the last two rows carefully. A published power figure on a catalogue page reflects the standard equipment list for that entry; it does not include a heat pump, and it is not an electrical supply specification. If your brief calls for year-round outdoor use in a cool climate, heating changes the load materially, so we size it with you rather than assuming it from the sheet.
Options to name in the enquiry
The options that most often get left out of a first request are the ones that cause change orders later. For this range, the catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as selectable accessories. Availability and compatibility vary by model, so name what you want and we will tell you what fits.
- Heating and insulation. State the coldest month at the site and whether the pool is used in winter. That decides heat pump sizing and how much insulation goes into the cabinet.
- Water treatment. Ozone appears on the catalogue entry; UV sterilisation and sand filtration are separate selections. For a shared or hospitality pool, say who will maintain the water and how often.
- Steps and access. Internal or external steps change the effective swimming length. Tell us who uses the pool: children, older guests, or hotel staff cleaning it.
- Finish and surround. Send the cabinet finish you want against your decking, stone or cladding schedule. Where the spa sits inside a wider fit-out, we coordinate it with the rest of the package under our Turnkey Solutions service.
- Swim training. The catalogue entry does not list a swim training system for this model. If your brief is built around lap swimming against a current, say so in the first message and we will point you to the configurations that carry one.
Send the documents that make pricing accurate
A quotation costs the same to produce whether or not you attach drawings, and drawings are what stop an order from stalling. For a project enquiry we would like to see:
- A site plan or terrace layout with the spa position, dimensions and finished levels marked;
- The electrical location and available supply, including phase and breaker details where known;
- Photos of the access route and the installation area;
- Your target completion date, so production and freight can be planned backwards from it;
- For hospitality and multi-unit projects, the room or unit count and whether the same specification repeats.
If you do not have drawings yet, our Interior Design Services team works from space planning and layout through to 3D renderings, so the pool can be placed in a visual scheme before anything is manufactured. For branded developments and private-label programmes, our Custom & OEM Service covers bespoke material, finish and texture choices alongside prototyping.
Freight, installation and handover
Swim spas are heavy, awkward freight, and the delivery plan belongs in the enquiry rather than after production. We arrange forwarding by sea, air or rail with customs paperwork, packaging and container loading plans, shipment tracking and door-to-door delivery through our Logistics & Door-to-Door Delivery service. Tell us the port of entry and who handles local clearance if you already have a forwarder.
On site, our Installation & After-sales Support covers setting, inspection with a snag list, spare parts and ongoing maintenance. Confirm the local electrical contractor, plumbing connections and any permits your council or building authority requires: those are site-side works and vary by location, so we will not tell you what your local rules say.
Before you send: check that your enquiry names the model code, states which features are wanted rather than assumed, gives the site's cold-season temperature if heating matters, and attaches at least one plan or photo. Those four points turn a general question into a priced proposal.
Send us your brief
Tell us the site, the users and the date you need it in. We will confirm which configuration fits, what is included and what needs to be added, then quote against that list. Browse the wider range in Swimming Pools and Swim Spas, or go straight to our Contact Us page.
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with offices in China, Vietnam, Singapore and South Africa. Contact: PHILLIP, phone / WhatsApp +86-13928214007, email santerson@qq.com.