A wall mounted cabinet looks finished the day it is installed. The real test comes two years later, when hands touch the doors daily, a bathroom fills with steam after every shower, and cleaning crews wipe the same surfaces weekly. Two cabinets built to the same drawing can age very differently if their finish schedule was left vague on the purchase order.

Our Wall Mounted Cabinets are made to measure for each project, with material and finish options selected per space. That flexibility is an advantage only when the specification is written down and signed off. Below is the checklist we ask buyers, contractors and designers to confirm before production starts.

1. Surface Material and How It Is Built Up

"Matte white" or "oak look" describes an appearance, not a construction. The same colour can be produced as laminate, lacquer, acrylic or wood veneer, and each behaves differently in service.

  • Laminate / melamine: factory-pressed sheet with a consistent wear layer; straightforward to specify by reference code, and edges must be matched on all four sides.
  • Lacquer (matte or high gloss): sprayed and cured in layers. Our Matte Lacquer Cabinets sit in this group, where the number of coats and the sheen level are agreed as part of the order.
  • Acrylic: a film-faced panel with a very reflective surface on gloss versions; direction of grain-free sheen and panel size limits should be checked against your elevation.
  • Wood veneer: a real wood layer over a stable substrate. Veneer carries natural colour variation between panels, so agree in writing how much variation is acceptable before the batch is cut.

Confirm three things on every line of your schedule: the face material, the substrate behind it, and the carrier board grade for a humid room. A bathroom unit and a hallway unit can share a colour code and still need different constructions.

2. Sheen Level, Grain Direction and Panel Matching

Sheen is measured, not guessed. Ask for the target gloss range for each surface and keep one physical sample as the reference for the whole order; a "matte" door and a "matte" carcass from different batches are frequently not the same product.

For veneered and wood-effect finishes, specify grain direction on every door and shelf. On a wall mounted run of three or four doors, mixed grain direction is visible immediately once light falls across the face. The same applies to panels that continue onto adjacent Wood Veneer Panels or concealed doors: the cabinet, the wall and the door must be ordered as one finish package, with matching batch references.

3. Edge Treatment and Hardware Interface

Edges are where a finish either holds or fails first. Confirm the edge material, its colour match, the radius of the edge profile, and whether all four edges of each panel are treated or only the visible two. On handleless fronts, confirm the profile that forms the grip and how it is finished at the corners.

Hardware affects the finish as much as the hinge affects the door. Confirm concealed hinge type and opening angle, whether an integrated opening mechanism is used instead of a protruding handle, load rating for drawers, and the fixing system behind the unit. A wall mounted cabinet carries its weight on the wall, so the hanging method and the wall substrate are part of the finish conversation, not a separate site detail.

4. Lighting and Accessories Specified With the Front

Integrated lighting changes both the appearance and the build of a cabinet. If shelves or a lit display niche are part of the design, confirm Integrated Cabinet Lighting at specification stage: cable route, driver location for service access, switching, and the electrical ratings that apply to a bathroom zone. Retrofitting a light into a finished front usually means cutting into it.

Mirror-fronted units deserve the same treatment. An LED Mirror Cabinet combines glass, lighting and a cabinet body in one assembly, so mirror tint, framing, light placement and the electrical supply all have to agree before the carcass is built.

5. Moisture, Cleaning and Wear Expectations

State the room, not just the colour. A bathroom wall unit sits near showers and washbasins; a storage unit in a corridor does not. Ask what the finish is expected to resist — steam and splashes, cleaning agents with detergent, fingerprints, or abrasion from high-frequency use — and confirm which product family suits that exposure.

Then ask for the cleaning instruction in writing. High gloss fronts and matte fronts are cleaned differently, and the wrong product can leave a film that changes the look of the surface. For hotel and villa handovers, this note belongs in the maintenance manual alongside the other fixtures.

6. Samples, Approval Records and What Ships

Before production, request a physical sample of the exact combination you specified: face material, colour code, edge profile and hardware. Sign it, date it, and keep one approved sample at each end of the supply chain. This single document settles most finish disputes.

  • Confirm the made-to-measure dimensions against site survey, including out-of-plumb walls.
  • Confirm panel sizes and any seams on long wall runs.
  • Confirm what is included in the delivery: carcass, fronts, hardware, lighting, mirror glass.
  • Confirm packing and labelling by room or unit number for site installation.
Finish names on a drawing are not a specification. The version that protects your project states material, substrate, sheen range, edge profile, hardware model, lighting details and the approved sample reference — one line per surface.

Confirming Your Schedule With Us

Send us the elevation drawing with the finish codes you intend to use. We will mark up what each code means in our production, flag surfaces where your chosen construction is not suitable for the room, and return a written schedule covering dimensions, material, finish, hardware and lighting for approval. Open storage runs such as Wall Mounted Open Wardrobes follow the same process, with shelf spans and load noted on the drawing.

Start With Your Finish Schedule

Browse the range at Products, or send us your drawings and finish codes. We will confirm feasibility, price and a production schedule for each unit before anything is cut.