An outdoor swim spa is not a shelf item. Before production starts, the shell size, the equipment set and the site conditions all have to agree with each other, or the unit arrives on a slab it does not fit and a power supply it cannot run on. Outdoor Swim Spa WS-PC07A-T is one of the longer configurations in our configurable swim and hydrotherapy range, and it is exactly the kind of model where the pre-production checklist decides whether installation goes smoothly. Below is what we ask buyers and project teams to settle with us before we open a production order.

1. Shell size and how the unit reaches its position

The catalogue lists WS-PC07A-T at 7000 x 3000 x 1470 mm. Those three numbers drive everything downstream: the footprint of the slab or deck, the width of the gate or hoist route needed to move the shell into a garden or terrace, and whether the unit sits above grade, partly recessed or fully in-ground.

Send us the plan drawing with the access route marked, not just the finished location. A 7 m shell that fits the terrace on paper still fails if the side passage is 900 mm wide. Tell us the delivery address type as well: villa garden, rooftop terrace, resort podium or hotel courtyard each changes the lifting method and the packaging we prepare.

2. Equipment set included in your configuration

The published specification for this model shows one control system, one swim training system, one water pump, one filter pump, 56 jets in total and four LED lights. Treat that as the reference build, not an automatic inclusion list. Options such as UV sterilisation, an additional water pump, a heat pump, sand filtration, extra insulation and entry steps are quoted separately, and availability varies by model.

Before production we ask you to sign off an itemised configuration sheet: which pumps, which sanitisation method, whether a heat pump is included, and what type of steps or seating arrangement you want. Two orders for the same model number can end up with different electrical loads once heating and extra pumps are added.

Item on the reference buildWhat to confirm before production
Control system, 1 setMounting position and whether it sits inside or outside the plant space
Swim training system, 1 setWhether you want continuous swim current or adjustable speed control
Water pump and filter pumpFiltration cycle, run-time schedule and filter type (cartridge or sand)
Jets, 56 in totalJet layout by seating zone; hydrotherapy zones are rearranged on request
LED lights, 4Colour mode and control from the main panel or a separate switch
OzoneWhether ozone alone is enough for your usage level or UV is added

3. Power supply and total load

The catalogue figure for this configuration is 11.55 kW total power. That number moves once a heat pump, an extra pump or upgraded lighting is added, so we confirm the electrical requirement of the selected configuration rather than quoting from the catalogue sheet.

Please provide, before production: supply voltage and phase (single or three phase), available breaker capacity at the plant room, cable run length from the distribution board, and local earthing and RCD requirements. Our electrical detail is then matched to what your electrician can actually install, which avoids a finished spa sitting idle waiting for a panel upgrade.

4. Foundation, drainage and plant access

A full-size swim spa needs a level, adequately bearing slab or a properly engineered deck. We ask for the foundation detail you intend to build, including whether the shell is fully supported on its base or has an unsupported perimeter. Where the unit will be recessed, tell us the inspection opening size and location, because the pumps, filter and control system all need reach for routine servicing.

Drainage matters at two points: overflow and backwash discharge, and the emptying route for maintenance. If your site has no gravity drain near the spa, we should know before production so the plumbing arrangement and any pump-out provision are planned in rather than improvised on site.

5. Insulation, heating and year-round use

For cooler or seasonal climates, insulation and heat pump options decide running cost more than any other choice on the list. Tell us the installation city and whether the spa will be used all year or only in warm months. We then propose shell and lid insulation with a heat pump sized for that duty instead of defaulting to the standard build.

Where the site experiences frost, wind exposure or strong sun on the cabinet finish, mention it at the quotation stage. Cabinet material, colour and insulation package are all adjustable before production starts, and much harder to change afterwards.

6. Customisation beyond the standard model

WS-PC07A-T sits in a configurable range, and several buyers combine it with other requirements: an automatic cover, a different jet arrangement for physiotherapy use, or a shape built around an awkward terrace. Our Customizable Shape Outdoor Spa line covers square, round, oval and curved shells for spaces the standard rectangular formats do not suit.

If your project needs swim spa dimensions outside the published catalogue, send the space constraint and the intended use, and we will confirm feasibility before you commit to an order. For hospitality and resort schemes that also need poolside furniture, sun loungers and cabanas coordinated with the water feature, the same design and production coordination covers both scopes.

7. Delivery, import and site handover

Because a swim spa ships as an oversized item, we confirm the container type and loading plan with you before production closes, then share packing dimensions so your freight forwarder can quote inland transport and lifting.

Our logistics and door-to-door delivery service covers sea, air and rail freight with the customs paperwork handled on our side. For project buyers we also arrange installation support and after-sales cover, so commissioning of the pumps, filtration and control system is checked together with your contractor rather than left to the site team alone.

Documents to send before production starts

  • Site plan with spa position, access route and gate or passage widths
  • Foundation or deck detail, including support method and inspection opening
  • Electrical data: voltage, phase, breaker capacity, cable run length
  • Signed configuration sheet listing pumps, jets, sanitisation, heating and cover options
  • Delivery address with lifting constraints and preferred Incoterms

Specification figures quoted above are the catalogue reference values for WS-PC07A-T. Included equipment, total power and dimensions should be reconfirmed against your selected configuration on the signed order sheet.

If you are specifying a custom outdoor swim spa for a villa, resort or wellness facility, send us the site plan and intended use and we will return a configuration sheet with confirmed dimensions, equipment list and electrical requirement before production begins. Enquire through our contact page to start that review.