A single vanity looks like the simplest item on a bathroom schedule: one basin, one unit, one mirror above it. In practice it is where several trades meet, and where a buyer's specification either holds together or falls apart on site. Santerson makes these units to measure for each project, so the customisation decisions below are worth settling in writing before an order is placed.

1. Dimensions: what actually has to be agreed

Standard catalogue widths rarely match a real bathroom wall. Santerson single vanity units are made to measure, so the dimension conversation should start with the finished wall face, not the structural one. That means the floor and wall finishes, any tiled rebate, and the position of the waste and water connections all get fixed before the carcass is cut.

  • Total width and height of the unit, plus projection from the finished wall face.
  • Bowl centre line measured from a fixed reference point on site.
  • Waste outlet position and trap type, checked against the soil pipe or wall inlet.
  • Clearance for drawer fronts and doors when they swing or pull out next to a shower screen, WC or doorway.

For wall-hung units, also confirm the fixing method and the load path in the wall. A made-to-measure unit only works if the supporting structure is designed for it.

2. Basin type: this drives everything else

The basin you choose determines the countertop, the cut-out, the tap hole positions and often the height of the whole unit. Decide it before the carcass is drawn:

Basin typeWhat the buyer has to specify
Integrated basinCountertop material and thickness, basin depth, overflow provision. See integrated basin.
Undermount basinCut-out shape and dimensions, rim detail, countertop compatibility. See undermount basin.
Vessel basin (above counter)Counter height set to suit the raised rim, tap reach and spout height, cleaning access behind the bowl. See vessel basin.
Countertop with integrated vanityA single specification for top and unit together, so the joint and fall are handled in production. See integrated countertop vanity.

Surfaces can be matched from the Santerson stone and marble surfaces range, which is cut to the dimensions of the project rather than supplied in fixed sizes.

3. Layout and storage: decide what goes inside first

Two units of identical size can behave very differently once the interior is set out. Tell us how the bathroom is used, and the layout is proposed around that use rather than taken from a standard plan:

  • Drawers or doors, and which combination. Drawers suit low, deep units; doors suit tall narrow ones.
  • Internal fitments: shallow top drawers for daily items, deeper storage below, divided compartments for toiletries.
  • Whether a matching drawer unit continues the same finish alongside the vanity.
  • Open display where towels are stored, and closed storage where clutter shows.
  • Whether pipework is concealed in the carcass or left accessible for maintenance.

4. Materials and finishes: what to specify, not just choose

A finish sample number alone is not a specification. For bathroom joinery, buyers are asked to confirm the following alongside it:

  • Board and substrate for wet areas, and how edges are sealed.
  • Finish type and sheen, matched against other joinery in the same project so cabinet doors and vanity fronts read as one set.
  • Hardware: hinge brand and opening angle, drawer runner type and load rating, handles or an integrated pull.
  • Tapware hole count and configuration, and whether taps are supplied with the unit or by others.
  • Sealing detail at the wall junction, particularly for tiled walls with a movement joint.

Because these are custom-made units rather than stocked items, finishes can be matched to cabinetry and wall panelling elsewhere in the project, which matters most in villa and hospitality work where the bathroom is visible from a bedroom or corridor.

5. Mirror, lighting and electrics

The mirror is part of the specification, not an accessory added later. Mirror cabinets come in made-to-measure sizes too, so their width and depth should relate to the vanity below and to the door swing:

Decide early where the power supply sits, whether a shaver socket is required, and what switching arrangement controls the light. Vanity lighting can be specified to match, and interior integrated cabinet lighting can be added inside display niches. Electrical ratings and installation requirements are confirmed for the final configuration with your electrician.

6. Tolerances, delivery and installation

The last items to agree are the ones most often left out of a purchase order:

  • Who takes the final site survey, and when it happens relative to tiling.
  • Which dimensions are fixed at production and which are adjusted on site.
  • Delivery point and packaging for fragile tops and mirrors.
  • Who carries out installation, and who is responsible for making good around the wall junction.
  • Spares and hardware availability for repeat units across a multi-bathroom project.

As part of the turnkey interior project solutions, production, door-to-door delivery and installation support for bathroom joinery are handled alongside the other fixtures in the same package, so a single specification covers several rooms instead of one.

Send the bathroom layout drawing, the preferred basin type and the finish being worked to. A made-to-measure proposal follows with dimensions, countertop detail and hardware listed, for confirmation before production starts.

Planning several bathrooms or a full fit-out? Talk to the Santerson project team about bathroom sanitary fixtures supplied as part of one coordinated package.