A quotation for classic French double doors is only as accurate as the information behind it. Because these doors are made to measure, with material and finish selected per project, two buyers asking for "a pair of French doors to the terrace" can receive very different prices. If your drawings already answer the questions below, you get a comparable quote the first time; if they do not, expect a round of clarifying questions and a revised number after site measurement.

1. Openings, not door sizes

Send the structural opening for each location: width and height clear of the finished wall, plus the wall build-up and total thickness. Note the floor finish level on both sides, because a tiled terrace and a timber-floored interior rarely sit at the same height, and that difference decides threshold detail, frame profile and how much clearance the leaves need to swing free.

  • Width and height of every opening, measured at several points rather than one.
  • Finished floor level on each side, and the thickness of the wall or partition.
  • Headroom above the opening if arch heads, pelmets or curtains are involved.
  • Whether lining, architraves and thresholds should be included in the supply.

For a pair of doors, state whether you want the leaves equal or one fixed panel and one working leaf. A room that only ever needs to breathe halfway is often better served by an unequal arrangement, and it changes both hardware count and cost.

2. The style you actually want

"Classic" covers a wide field. Send a reference image or a drawing of the panel arrangement, glazing bar layout and moulding profile you have in mind, together with the architrave detail used elsewhere in the property so new doors match existing joinery. A Santerson Arched French Doors elevation, for instance, needs the radius and the springing level confirmed before tooling can be priced, while a Santerson Modern Slim Frame French Doors profile is quoted on sightline and frame width instead. Where the same elevation has to open fully but the wall offers no swing clearance, ask about glass sliding doors as the alternative before committing to hinged leaves.

If the doors sit opposite windows, say so. Reflection and glare change what a glazed leaf reads like in daily use, and it is cheaper to adjust the glazing bar spacing at quotation stage than to live with it.

3. Material and finish

State the substrate and the surface you expect, and whether the two faces of the door may differ. Villas frequently carry a painted interior face against a more weather-exposed exterior face, and that decision belongs in the enquiry, not in a change order.

DecisionWhat to specify
SubstrateSolid timber, engineered core or timber-aluminium composite; and whether an exterior aluminium cladding layer is wanted.
Colour and finishPaint code or stain sample, sheen level, and which face gets which treatment.
Grain and detailingPanel moulding profile, glazing bar width and spacing, whether bars sit inside or outside the glass.
Matching existing joineryArchitrave and skirting profiles already on site, plus a photograph of them.

4. Glazing

Glazing is usually the largest single variable after size. Confirm the unit build, the glass type and any decorative treatment. Where doors open onto a pool deck, terrace or stair landing, say so plainly, because that affects what the specifier should be proposing in the first place.

  • Single glazed, double glazed or laminated, and the target thickness of the sealed unit.
  • Clear, low-iron, tinted, frosted or patterned glass; decorative or wired interlayers if design requires them.
  • Whether glazing bars are true divided lights or simulated bars between panes.
  • Air and water performance expectations for the exposure the doors face, along with the local requirement your certifier or inspector will apply.

Do not leave glass type to be "decided later". It is fixed at the same time as the frame, and changing it after production starts restarts lead time.

5. Hardware and operation

Hardware can swing a quote by a wide margin, so specify it rather than assume it is included. Send the lever or knob design you want, the finish, and whether the doors need an astragal, keep, flush bolt and top bolt on the inactive leaf.

  • Lock type: passive pair, mortice sash lock with a key, or a night latch for an entrance door.
  • Hinge style and load, based on leaf weight and glass build; state if hinges must be a particular brand to match other ironmongery on the project.
  • Handles, escutcheons, door closers and door stops — and whether you are supplying them or asking the supplier to.
  • Threshold detail, drainage expectation and any sill or cill section to be supplied with the frame.

If children, guests or a commercial use are involved, mention it. It changes lock specification and pinch-protection decisions in ordinary conversation rather than as an afterthought.

6. Quantity, schedule and site conditions

Give the full count of openings and group them by type, so identical doors are produced as one batch. A short door schedule — a tag per opening, size, hand, swing direction and finish — is enough for an indicative price.

  • Quantity per door type, with left-hand or right-hand and inward or outward swing marked on the plan.
  • Required delivery date to site, and the phase of the build the doors are needed for.
  • Delivery address, access constraints, floor level and whether a crane or hoist is available for large leaves.
  • Storage conditions on site between delivery and installation; frames and glazed leaves need dry, upright space.

7. Commercial terms and scope of supply

State clearly what you expect the price to cover: frames and linings only, or doors with hardware, glazing, architraves and sealants included. Ask for the quote broken into unit rates per door type plus packing and freight, so you can compare like for like between suppliers.

For an overseas order, confirm who arranges freight and customs clearance, the Incoterm being quoted, packaging standard and container loading plan. SANTERSON's logistics and door-to-door delivery service covers freight forwarding, documentation and delivery coordination, but duties, local taxes and on-site handling remain yours to budget, and the terms should be agreed in writing before production begins.

Before you send the enquiry: confirm who measures the openings — your builder or the supplier's team — and who signs off the final dimensions. Made-to-measure doors cannot be adjusted much on site, so a measured and countersigned opening list protects both sides.

8. What a complete enquiry looks like

A good enquiry packs into one message: annotated opening measurements, a plan with door tags and swing directions, a reference image or elevation for the style, the finish schedule by face, glazing build, hardware list with finishes, quantity schedule, required site date and delivery address. With those items in hand, a supplier can move straight to a priced proposal instead of a questionnaire.

SANTERSON produces these doors as made-to-measure work under its custom and OEM service, so dimensions, panel layout, substrate and finish are set per project rather than chosen from a fixed catalogue. Send the details above with your drawings and ask for unit rates by door type, plus freight to your site.

Send us your door schedule. Email santerson@qq.com or contact PHILLIP on WhatsApp +86 13928214007 with your drawings, opening measurements and finish requirements. We will confirm the specification with you before quoting production and delivery to site. Enquiries are answered through our contact page as well.