A mid-century whole house cabinetry package only holds together when the shop drawings and the actual walls, floors and services agree. Here is the sequence we follow on villa and apartment projects, from site survey to handover, so built-in storage lands flush the first time.

Whole-house joinery fails in two places: at the junction between drawing and building, and at the junction between one trade and another. A wardrobe elevation that looks correct on paper can meet a out-of-plumb wall, a skirting that has already been tiled, or an air-conditioning drain that runs through the drawer zone. Coordinating those conflicts before panels are cut is where the budget is saved, not after.

SANTERSON has manufactured furniture and building materials in China since 2008, and we supply custom cabinetry to villa, apartment and hospitality projects overseas. On a mid-century whole house custom cabinetry and built-in storage project, that scope covers the bay window desk with drawer storage, the open staircase bookshelf, vertical slat partitions and wood-grain kitchen cabinets as one coordinated package rather than separate orders.

What a Mid-century Whole House Cabinetry Package Covers

"Whole house" means the joinery is designed as one system, with a shared language of wood tone, panel profile and reveal. On the projects we produce in this style, the package typically includes:

  • Entrance storage — full-height cabinets with open display niches, seating recess and hardware for coats and shoes.
  • Living room wall — full height storage walls, floating shelves and a media wall with provision for cable routes and heat dissipation.
  • Kitchen — custom built-in cabinets, tall units for appliances, and matching pantry runs.
  • Bedrooms — custom minimalist bedroom wardrobes, integrated bay window seating or desks, and bed platforms where the plan calls for them.
  • Circulation — staircase shelving, slat partitions, and flush wall aligned doors that sit in the same plane as the panelling.
  • Specialist details — niche paneling, integrated cabinet lighting and concealed handles that keep the facades uninterrupted.

Mid-century work is unforgiving about proportion. Warm wood grain, travertine or stone accents, arched openings and soft curves all read as intended or they do not, and a 10 mm error in a reveal is visible from across the room. That is why we treat drawings and site data as one document set, not two.

Step 1: Lock the Design Intent Before Any Measurement

Before anyone measures, agree on the elements that will not change later:

  • The palette and materials — wood species or veneer tone, stone or travertine surfaces, paint colour of adjacent walls.
  • The panel language — flat slab, shaker profile, arched niche, handleless minimalist kitchen cabinets with touch-to-open fronts.
  • The open-to-closed ratio per room, based on how the space is actually used: display for objects you want visible, concealed storage for everything else.
  • Fixed constraints — ceiling heights, window and door positions, existing beams, radiators, sockets and switch lines.

A single reference image per room is worth more than a long written brief, because it fixes the reveal widths and shadow gaps that text tends to leave open.

Step 2: Site Survey Against the Drawings

This is the step most projects skip and most projects pay for. We ask for, or carry out, a survey that records what the building actually is:

Survey itemWhy it matters for cabinetry
Wall straightness, plumb and square at each cabinet runDetermines scribing allowance, filler widths and whether doors will hang true
Floor levels across the run, plus finished floor heightSets toe-kick heights, drawer lower limits and door swing clearance
Ceiling heights and soffits at each wallDecides whether full-height units need a soffit box or a stepped scribe
Positions of sockets, switches, data points and light outletsCut-outs must sit inside carcass zones, never on a shelf line
Plumbing, drainage falls and air-conditioning ducts or drainsPrevents drawers, shelves and back panels colliding with services
Window reveals, sills and radiatorsDrives the design of bay window desks and integrated seating
Door openings, arch shapes and skirting detailsNeeded for concealed doors and continuous panelling
Access route, lift size and stair width at the propertySets maximum panel and carcass module sizes for delivery

Where survey data contradicts the architectural drawings, we raise it as a query with the designer or contractor before production, with a marked-up drawing showing the deviation and the option we recommend. Resolving it on paper costs an email; resolving it on site costs a re-made unit.

Step 3: Shop Drawings That Answer Site Questions

We issue working drawings for approval that go beyond appearance elevations. For each room they show:

  • Elevations with overall and module dimensions, plus material and finish call-offs.
  • Carcass sections showing drawer stack heights, shelf spans and load-bearing shelf positions.
  • Appliance integration details — oven, refrigerator, wine cooler and laundry appliance cut-outs with ventilation gaps, confirmed against the exact models chosen.
  • Electrical coordination for integrated cabinet lighting: driver location, cable routes and switch or sensor positions.
  • Junction details for stone worktops, niche paneling, slat partitions and skirting interfaces.
  • Panel and module split marked with delivery sequence, so the largest piece still fits through the entrance and lift.

Approval at this stage is what makes the quotation firm. Anything changed after sign-off — a drawer bank moved, a niche added, a different handle specification — is re-drawn and re-costed, and it resets the production slot.

Step 4: Trade Interfaces to Settle in Writing

Built-in storage touches every other trade. These are the decisions we ask the site team to confirm before manufacture:

InterfaceDecision needed
Electrical contractorFinal outlet positions inside cabinet zones, and who supplies power for internal lighting and appliances
PlumberWaste and supply locations for laundry and wet areas, plus trap access that must stay reachable
HVAC contractorReturn air grilles, drain routes and clearance around integrated units
Flooring and tilingFinished floor levels, and whether flooring runs under cabinets or butts up to them
Painter and plastererWhether wall preparation finishes before or after scribing, and paint colour of adjacent reveals
Door and joinery supplierReveal widths and thresholds where concealed doors meet the panelling

A short interface schedule signed by each trade prevents the classic failure: a wardrobe delivered to a wall that is still to be packed out by 25 mm.

Step 5: Manufacturing, Packing and Delivery Sequence

Once drawings are approved, we manufacture in our China facility, with dimensions taken from the survey rather than the design stage. For overseas projects the coordination continues into logistics:

  • Packing lists keyed to room and unit number, so site teams can identify each crate against the drawing set.
  • Container loading planned by installation sequence — kitchen and bedroom carcasses that go in first are loaded last.
  • Documentation for import: commercial invoices, packing lists and certificates of origin prepared with the shipment.
  • Door-to-door delivery arranged by sea, air or rail freight, with tracking through to the property.

Site teams should confirm storage space and access dates before arrival. Joinery sitting in a damp garage or a ground-floor hallway for three weeks is how flat-pack damage appears before installation starts.

Step 6: Installation, Snag List and Handover

On site we support installation with our own installers and on-site guidance. The order of work matters:

  • Dry lay and levelling of carcasses first, checked with a laser line across the whole run.
  • Doors and drawers hung after all heavy units are fixed, so alignment is not disturbed by later work.
  • Worktops, niche paneling and stone elements fitted once cabinet alignment is signed off.
  • Lighting commissioned and tested with the electrical contractor before covers and trims are closed up.
  • Snag inspection with the client or contractor, with punch-list items photographed and closed out on site.

At handover we walk through operation of soft-close and touch-to-open hardware, cleaning recommendations for each finish, and what to do if a panel needs replacing later. Spare parts and replacement panels can be ordered against the project reference.

Common Coordination Failures and How to Avoid Them

  • Measuring before finishes are set out. Wait until finished floor levels and wall build-ups are confirmed, or design with an explicit allowance agreed on paper.
  • Appliance models chosen late. Tall units and cut-outs depend on exact dimensions and ventilation; fix the model before drawings are signed.
  • Lighting left to the electrician. Drivers, sensors and cable routes need a home inside the carcass design, not behind it.
  • Inconsistent reveals between rooms. One detail sheet for shadow gaps, scribes and edge profiles keeps the whole house reading as one package.
  • No delivery access check. Panel sizes must be set by the lift, stair and doorway dimensions recorded at survey.

A note on specifications. Materials, board types, finish systems, hardware brands, lead times, freight terms and warranty scope are confirmed project by project in the drawing set and quotation. We do not publish fixed figures for them, because they change with the configuration you select and the destination country.

Send Us Your Drawings and Site Data

If you are planning whole-house custom cabinetry, send the architectural drawings together with any survey information you already hold. We will review them against the joinery scope, flag interface conflicts, and come back with a build-up proposal and quotation for the full package — design coordination, production, delivery and installation support.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com