A swim spa that arrives on a pallet is not the same thing as a swim spa you can actually swim in. For project buyers, contractors and villa owners, the difference between those two states is an installation plan, and for the Outdoor Swim Spa WS-S06B-T that plan has to cover a five-and-a-half metre shell, an integrated swim training system and a control cabinet that needs proper power. Below is the checklist we work through with clients before the spa ships, ordered roughly by when each decision has to be made.

1. Site access and the delivery route

The catalog dimensions for this model are 5800 × 2200 × 1420 mm, so the shell has to clear whatever it passes through on the way to position. Measure gate widths, turning radii at corners, overhead lines and any porch or pergola beams before you commit to a location. A spa that cannot reach the pad has to be craned over the roofline, which is a cost nobody planned for.

  • Confirm the widest and highest points along the route from the kerb to the final position.
  • Check whether a crane or a spa dolly and enough crew are realistic on your site.
  • Note surface protection needs — turf, pavers and timber decking take damage differently under tracked equipment.

2. Foundation and drainage

A filled swim spa is heavy, and the load is spread over the footprint of the shell rather than a few legs. The slab or pad has to be level, structurally adequate for that mass, and finished so that splash-out and backwash water drain away from the cabinet and the access side.

  • Specify the pad size with working clearance around all four sides, not just the shell outline.
  • Keep the surface level in both directions; a spa set out of level puts stress on the shell and makes the water line look wrong.
  • Plan where filter backwash and drained water go. Local rules on discharge vary, so confirm what your site permits before the pour.

3. Electrical supply and isolation

The catalog lists a total power figure of 8.75 kW for this configuration, which is the number your electrician designs around — circuit size, protective device, cable run and voltage all follow from it. Do not let anyone improvise an extension cord or share a circuit with pool lighting.

  • Confirm supply voltage and phase against the configuration you have ordered before the electrician first fixes.
  • Provide a dedicated circuit with the correct overcurrent protection and an isolator within reach of the cabinet, as required locally.
  • Route cable away from foot traffic and standing water, and leave slack at the cabinet end for servicing.

Equipment included and electrical requirements depend on the configuration selected. Confirm both against your order documentation before any site work begins.

4. Equipment scope: what is in the box versus what you add

The WS-S06B-T specification on our product page lists one control system, one swim training system, one water pump, one filter pump and a total of 40 jets, plus three LED lights and 26 small LED lights. That is the base configuration. Options listed in the catalog include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps — each of which changes both the electrical load and the space needed around the shell.

Catalog itemListed quantityPlanning implication
Control system1 setNeeds a dry, reachable position and an isolator nearby
Swim training system1 setDefines the swim lane; keep the length clear of steps and seating
Water pump / filter pump1 pc eachService access required, not buried behind cladding
Jet total40 pcsDetermines seating and hydrotherapy zones
Total power8.75 kWStarting point for the electrical design

Quantities and options vary by model and configuration, so treat this table as a planning reference and check it against your own quotation.

5. Access for maintenance, not just for swimming

Every pump, filter and control board eventually needs someone in front of it. If the spa is sunk into a deck or boxed in with cladding, build removable panels and leave enough room to pull a filter cartridge out without draining anything.

  • Mark on the drawings which side the cabinet opens on, and keep that side clear permanently.
  • Provide steps or a graded entry — an option in the catalog — so users are not climbing over the shell edge.
  • Keep spare parts for jets, seals and lighting identified at handover, so a fault does not become a long wait.

6. Water treatment and commissioning sequence

The model lists ozone as a fitted feature, with UV sterilisation available as an option. Either way the plan should include a first fill, a chemical balance before anyone enters the water, and a short run of the filter pump to purge air from the jets. Commissioning is also the moment to record the settings: temperature setpoint, jet modes and lighting scenes.

  • Fill, balance and circulate before handover — do not hand over a spa that has only been filled.
  • Record the commissioning readings and the configuration actually installed, and give that record to the building owner.
  • Set a maintenance routine for filter cleaning and water testing that matches how often the spa is used.

7. Coordination with the rest of the outdoor build

A swim spa rarely sits alone. It shares a terrace with poolside dining and lounger furniture, hardtop pergolas, screening and paving, and all of those have to agree on levels, sightlines and drainage. When the spa, the decking and the furniture come from a single supplier, one set of drawings covers them and there is one party accountable for coordination.

That coordination is where our one-stop furniture and building materials approach earns its keep. We handle the spa shell, the surrounding outdoor furniture and the fit-out products around it, then arrange freight by sea, air or rail with door-to-door delivery and finish with installation and after-sales support. Where a project needs a different footprint, our customizable shape outdoor spa covers square, round, oval and curved configurations instead of the standard catalog shell.

The plan in one page

  • Delivery route measured and a lifting method agreed
  • Level, adequately loaded pad with drainage away from the cabinet
  • Dedicated circuit sized for the installed configuration, with an accessible isolator
  • Equipment scope confirmed against the order, including options and their power draw
  • Service access to pumps, filter and control system, plus steps or graded entry
  • First fill, water balance, jet purge and recorded commissioning settings
  • Levels and finishes coordinated with pergolas, paving and poolside furniture

Send us the site drawings and the configuration you are considering, and we will return an installation checklist matched to it — including what has to be fixed before the spa arrives.

Talk to us about your swim spa project

Contact PHILLIP by phone or WhatsApp on +86 13928214007, email santerson@qq.com, or use the contact page. Enquiries receive a response within 24 hours.