A lacquered door can arrive on site in perfect condition and still end up in a snag list because the wall it hangs against was never levelled, or because two cabinets were built to the same tolerance drawing but measured from different datums. Metallic lacquer cabinets sit at the top of the Lacquer Kitchen Cabinet collection for exactly this reason: the finish shows its quality through light reflection, so every millimetre of alignment and every joint line becomes visible once the doors are hung. An installation plan is what keeps that finish looking as it did in the sample room. Below is the checklist we work to on residential kitchen projects, whether the cabinetry comes from our own production line or has to be coordinated with other trades on site.

1. Site conditions and the tolerance sheet

Before any panel is cut, the room needs to be surveyed against the design drawings rather than assumed to match them. Floor level, wall plumb, ceiling height variation, and the position of waste, water and power outlets all belong in writing, with a signed record of what differs from the drawing.

  • Floor flatness across the run, plus the finished floor level relative to the cabinet base.
  • Wall plumb and corner angles — out-of-square corners change scribe widths on both ends of a run.
  • Locations of water inlet, waste, switchboards and any ducting that clips the cabinet zone.
  • A clear statement of who is responsible for making good: the builder, the tiler or the joinery contractor.

This survey produces a tolerance sheet. It fixes the acceptable deviation per linear metre and across the whole run, and it is the document that prevents an argument on site three weeks later.

2. Confirmed dimensions, finish and hardware schedule

Our metallic lacquer cabinets are made to measure: sizing, layout, substrate and finish are all specified per project, and the same applies across the wider lacquer range. That flexibility is an advantage in production and a risk on site if the schedule is not frozen before manufacture begins.

Item to confirmWhy it belongs in the plan
Made-to-measure dimensions for every carcase, door and panelRe-cutting a lacquered door after delivery costs a full refinishing cycle, not a trim.
Finish reference and sheen levelMetallic lacquer shifts in tone with light angle; approve a physical sample under the room's actual lighting.
Substrate and construction typeDetermines fixings, edge treatment and how the carcase tolerates site moisture.
Hinges, runners, handles and integrated appliancesCutting and drilling for hardware happens in the factory; late changes mean openings in the wrong place.
Appliance datasheets — oven, fridge, dishwasherNiche sizes, ventilation gaps and door swing clearances must match the datasheet, not the concept render.

If the kitchen mixes finishes — for example a run of matte lacquer cabinets against the metallic doors, or an island in a different material — record where each finish starts and ends. Transition details are a common source of site disputes.

3. Sequencing with the other trades

Cabinets rarely fail on their own; they fail at the interface. The plan should fix, by date and by name, which trade completes what before the cabinets land.

  • First fix: plumbing, electrical and gas routes set and tested, with outlet positions confirmed against the cabinet drawing.
  • Wet areas: waterproofing completed and signed off before any carcase sits in a splash zone.
  • Floor and wall finishes: tiling, plaster and paint completed to the finished levels stated on the tolerance sheet, so scribes are cut once.
  • Countertop survey: templating after the carcases are set and levelled, never before.
  • Air quality and dust: sanding and painting trades finished and the room cleaned before lacquered doors are unpacked.

For projects where cabinets, worktops, lighting and other fit-out items come from more than one supplier, someone has to own the interface dates. Our installation and after-sales support service covers on-site installation, inspection and snag resolution, so those handover points get written into the programme rather than negotiated on the day.

4. Delivery, packaging and storage on site

A lacquered panel is vulnerable between the container and the wall. The plan should name the delivery window, the access route, and where the goods sit overnight.

  • Delivery booked for a dry, enclosed day with a clear path from vehicle to the install room.
  • Packaging kept closed until the panel is needed; labels matched to the drawing reference at unloading.
  • Storage indoors, off the floor, upright or flat as the packaging directs, away from wet trades.
  • A condition check against the packing list on arrival, with any damage photographed and reported the same day.

When cabinetry ships internationally, this is also where logistics and door-to-door delivery planning pays for itself: container loading plans, packing lists and customs documents prepared in advance keep the goods moving straight through to site instead of sitting in a damp depot.

5. Protection during installation

Metallic and high-sheen surfaces mark easily, so protection is part of the method, not an afterthought.

  • Cotton gloves for anyone handling a finished door; bare hands leave oil that shows under raking light.
  • Protective film left on horizontal surfaces until the final clean.
  • Doors hung last and kept closed while adjacent work continues.
  • No solvent or abrasive cleaner on site — only the cleaning method confirmed with the manufacturer.

6. Snag inspection and handover

The last page of the plan is the sign-off sheet. Inspect with the room's own lighting on, plus a work light held along the plane of the doors, which reveals misalignment that daylight hides.

  • Door gaps even along the full height; no rubbing at the top or bottom of a swing.
  • All carcases level and fixed solid — no flex when a drawer is pulled hard open.
  • Drawers and doors running smoothly, with soft-close engaged correctly.
  • Finish continuous at corners, returns and reveals; scribe cuts clean with no visible gap line.
  • Appliance niches clear of obstruction, with ventilation as specified.
  • Cleaning method and care instructions handed to the owner in writing.

Anything outstanding goes on a dated snag list with an owner against each item and a fixed close-out date. That list is what the handover meeting is about.

A practical note on scope. When cabinets are part of a wider fit-out — turnkey villa or hospitality work, for instance — the installation plan should be written once for the whole package, with cabinetry as one section inside it. Separate plans for separate trades is how interface gaps appear.

Related lacquer finishes in the same collection

If you are specifying across a project and want the metallic look balanced elsewhere, these sit in the same Lacquer Kitchen Cabinet family and share the made-to-measure approach:

Confirm dimensions and selected specifications for each project before manufacture; the schedule in section 2 is the practical place to do that.

FAQ

When should the site survey happen? After the builder has set finished floor levels and completed first fix, but before the cabinet drawings are released for manufacture. Surveying later means re-making panels instead of adjusting them.

Can cabinets be installed before the worktop is templated? Yes — carcases should be set and levelled first, then the worktop templated on site so the template reflects what was actually built.

What if a damaged lacquered door is found after unpacking? Photograph it against the packing list reference and report it the same day. Refinishing or replacement gets arranged far more cleanly when the damage is recorded at delivery rather than at handover.

Talk to us about your kitchen package

SANTERSON manufactures custom cabinetry and coordinates the surrounding fit-out — design, production, delivery and on-site installation — for residential and project work. Send us your drawings or a room measurement and we will come back with a specification you can check against the six sections above.