A swim spa is one of the few items on a villa or resort schedule that combines structural, mechanical and electrical decisions in a single line item. If the procurement brief only carries a model number and a quantity, the quotation you receive back will not be comparable with anyone else's, and site works will stall waiting for answers. The following walk-through uses Outdoor Swim Spa WS-P001 from our outdoor swim and hydrotherapy range as the worked example, so you can see exactly which fields belong in a brief before it goes out to suppliers.
Start with the model reference, not a category name
"One swim spa, outdoor, 3.5 m" is not a specification. Two projects asking for that will mean very different things: one may want a lap current for training, another may want jet positions for seated hydrotherapy. Name the model and its configuration code in the brief, then state the intended use in plain language underneath. That way the supplier can confirm whether the standard configuration already meets the programme or whether options need to be added.
WS-P001 sits in a configurable range rather than a fixed catalogue item. The catalog dimensions are 3500 x 950 mm, and the features shown on the product page are water jets, LED lighting and ozone. Treat those as the starting point of a conversation about the delivered configuration, not as a promise of what arrives on site.
What the catalog sheet for WS-P001 already answers
Before writing your own questions into the brief, check what the published data covers. For this model, the product page lists:
| Item shown on the product page | Catalog entry |
|---|---|
| Model | WS-P001 |
| Catalog dimensions | 3500 x 950 mm |
| Control system | 1 set |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 81 pcs |
| LED lights | 2 pcs |
| Total power | 8.35 kW |
| Swim training system | Not listed in the catalog entry |
That table settles footprint, pump count and an indicative electrical load. It does not settle the questions that actually drive cost and site programme: what is included in the quoted price, what has to be supplied locally, and what the client expects the spa to do on a daily basis.
The jet count, pump quantities and power figure above are transcribed from the catalog entry for this model. They describe a configuration, not a guarantee of what will be delivered under your order. Ask for the specification sheet of the exact build you are being quoted, and put that sheet in the contract as the reference document.
Fields to write into the brief
1. Duty and user profile
- Who uses it: residents, hotel guests, gym members, or a spa treatment room.
- Hours of use per day, and whether the water is held at a constant temperature year-round.
- Whether hydrotherapy seating, a standing jet zone or a training current is the priority. The catalog entry for WS-P001 does not list a swim training system, so if training is in the programme, raise it as an open item rather than assuming it is fitted.
2. Location and civil interface
- Above ground, semi-recessed or fully recessed into a deck, and whether the plinth, surround and drainage are in your scope or the contractor's.
- Access route for delivery and crane or forklift needs, including gate widths and overhead clearance.
- Drain points, overflow route and waterproofing responsibility at the recess.
3. Services and electrical
- Available supply: single or three phase, breaker capacity and the run length from the distribution board. Use the catalog power figure as a starting point for the electrical engineer's sizing, then confirm the final load against the quoted build.
- Dedicated isolator and consumer unit location, plus who supplies the final connection.
- Water fill source, and whether a heat pump is being added to the configuration.
4. Options that change the price
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list each option you want as a priced line in the quotation request instead of writing "options to be advised". Insulation and a heat pump in particular change both the capital cost and the running profile, and they are the items most often dropped from a comparison because one bidder quoted them and another did not.
5. Commercial terms
- Delivery term and destination port or site address, so freight is compared on the same basis.
- Packaging method for a spa shell in transit, and who carries risk to site.
- What after-sales support covers, which spare parts are stocked, and how a service visit is arranged in your country.
Buying the spa as part of a wider package
On villa and hospitality projects the swim spa rarely stands alone. It sits next to poolside loungers, an outdoor dining set and a shaded structure, and all of those need to agree on finishes, delivery windows and site access. Coordinating them through one turnkey scope removes the argument about whose job it is to protect the shell before the deck is poured.
As a furniture and building materials manufacturer working on villa, hotel and office projects, we handle this kind of mixed package routinely: product specification, custom and OEM work where finishes need to match the joinery schedule, then freight and door-to-door delivery. Our project services run from design coordination through production, logistics and installation support, so the swim spa is scheduled against the same programme as the rest of the fit-out rather than arriving on its own timeline.
If you are assembling a brief for a project in Australia or elsewhere, send us the model reference, the site condition drawings and the option list you want priced. We will come back with the configuration sheet for that specific build, including what is included, what is optional and what your local contractor still has to provide.
Send your swim spa requirement, along with the model reference and site conditions, to our project team at SANTERSON. We will confirm the configuration and return a comparable quotation for the exact build you are specifying.