A request for quote is where a wall panel project either starts to move or stalls in email traffic. For Santerson Matte Lacquer Panels, the difference between a quotation you can compare and a number you cannot trust usually comes down to how much of the job you describe up front. This guide sets out what a buyer should send, and why each item changes the price.

Why the Same Panel Line Produces Very Different Quotes

Matte lacquer wall panels are made to order. Our product page for this collection describes finish, layout and dimensions as configurable, with made-to-measure sizing and material and finish options, and it asks buyers to confirm dimensions and selected specifications for each project. That is the honest reason two enquiries for "the same panels" can come back at different rates: they are not the same panel. One buyer wants a feature wall behind a bed; another wants a full-height run wrapping a corridor with an integrated door reveal.

A quote request that already carries the room information lets us return a specification, not a guess. A quote request that says only "matte lacquer panels, 40 square metres" forces us to price on assumptions, and assumptions are what get revised later.

The Project Information Block

Start with the basics of who is buying and where the panels land. This block also tells us whether the enquiry is a single residence or a repeated fit-out, which affects how we build the pricing.

  • Company name, contact person, and the role you play — developer, builder, interior designer, procurement agent or homeowner.
  • Project name, delivery city and site address, plus whether the building is occupied during the works.
  • Scope type: new build, renovation or replacement of an existing installation.
  • Target date for panels on site, and any earlier date you need drawings approved.
  • Incoterms you want quoted — EXW, FOB, CIF or delivered to site — and the nearest discharge port if you are taking delivery yourself.

Dimensions and Wall Conditions, Not Just Area

Square metres alone cannot produce a working price. What we need is geometry per wall, because panel size, cutting loss and fixing detail all follow from it.

Item to stateWhy it changes the quote
Width and height of each wall run, in millimetresSets panel module sizes and how many joints appear; tall runs may need different support detailing.
Total area plus number of separate runsSeveral short runs cost more per square metre than one long run because of extra edges and trims.
Corners, returns and external anglesEach return needs a finished edge treatment that flat area does not cover.
Openings, niches and revealsCut-outs for lighting, doors or shelving are fabrication work, not deduction of area.
Existing substrate conditionFlat, sound walls install faster; uneven or damp backgrounds need preparation before panels go up.
Whether site measurements have been takenMade-to-measure work is priced from measured dimensions, not drawing dimensions.

Finish and Material Selection

"Matte" is a direction, not a specification. Tell us the surface you are trying to match or avoid, and we can confirm what the selected configuration offers rather than assuming it.

  • Colour or reference sample. If you have a physical sample or a colour code, say so and state where it is.
  • Sheen expectation — soft low-sheen, deep flat, or a surface with metallic or textured character. Our lacquer range also includes Metallic Lacquer Cabinets and Textured Lacquer Cabinets, which helps when a whole interior uses the same finish language across walls and joinery.
  • Substrate and core choice, if you have one specified; otherwise state the performance priority you are working to.
  • Edge and joint preference: shadow gap, tight butt joint, or a cover trim.
  • Whether panels must coordinate with other joinery in the same project, such as wardrobes or kitchen cabinetry in a matching lacquer.

Quantities, Splitting and Phasing

State quantities by wall or room rather than as one lump figure. If the project is phased, say which areas are confirmed now and which are likely later, so the quote reflects what we are actually committing to produce.

  • Number of panels or square metres per area, with a drawing reference for each area.
  • Spare stock, if you want any held for future maintenance or matching batches.
  • Whether later phases must match the first batch in colour and sheen, since this affects how production is scheduled.

Drawings, Renderings and Reference Images

Attach whatever exists, even if it is rough. A marked-up floor plan with wall letters, a section detail, or photographs of the site wall all reduce the number of questions before pricing. Where no drawings exist yet, our Interior Design Services cover space layout planning, concept design and 3D visual renderings, plus production coordination and on-site guidance — useful when the panel design still needs resolving before anyone can sign off a number.

Delivery Terms and Site Access

Panel work goes wrong at handover more often than in the factory, so put the delivery reality in the request. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Confirm the import terms, duties and transit arrangement for your country case by case rather than relying on a general statement.

  • Delivery address, floor level, lift dimensions and any restriction on vehicle or delivery hours.
  • Who receives the goods, and whether crating and protection to site are required.
  • Storage conditions at site — panels should not sit in a damp or unsealed building before installation.

Installation and After-sales Expectations

Say plainly who is installing. If you want us involved, our Installation & After-sales Support covers on-site installation, inspection and snag resolution, warranty coverage, spare parts and ongoing maintenance; ask us to confirm in writing what applies to your site, including installer availability in your region and the exact warranty terms. If a local contractor is installing, request fixing details, panel weights and any recommended substrate preparation so their tender matches our product.

Commercial Questions Worth Asking in the Same Email

A quote request is also the moment to test the supplier's process. Ask for these items explicitly and compare how completely each supplier answers:

  • A line-item breakdown: panels, trims and edges, fabrication for openings, fixings, packaging, freight.
  • The specification sheet for the configuration you selected, with the dimensions we will build to.
  • Payment stages and what is released at each stage.
  • How colour and sheen are approved before production starts, and what sample or proof you receive.
  • What happens if site dimensions differ from the drawings supplied.
  • The validity period of the quotation and what triggers a re-quote.

A Quote Request You Can Copy

Subject: RFQ — matte lacquer wall panels, [project name], [city]

1. We are [company], acting as [role] on [project]. Site address: [address]. Delivery target: [date].
2. Scope: [new build / renovation]. Areas covered by panels: [list with drawing references].
3. Wall dimensions per run, including heights, corners and openings: [table or marked plan].
4. Finish required: [colour reference / sheen expectation / sample location]. Coordination needed with [wardrobes / cabinetry / other joinery]: yes or no.
5. Quantities per area, plus spare stock requirement: [figures]. Phasing: [confirmed now / later phases].
6. Drawings and site photographs attached: [list]. Site measurements taken: yes or no.
7. Delivery terms requested: [EXW / FOB / CIF / delivered to site], discharge port [port], site access notes: [floor, lift, restrictions].
8. Installation: by us, by your team, or by your contractor with our fixing details.
9. Please return a line-item breakdown, the specification sheet for the proposed configuration, payment stages, colour approval method and quotation validity.

What to Compare Before You Accept

Read quotes side by side on scope, not on headline total. The common gaps are missing edge treatments at corners, no allowance for fabrication around openings, freight quoted without crating to site, and installation left undefined. If one number looks far lower than the rest, check what has been left out of it rather than assuming a better deal. Buyers coordinating panels alongside cabinetry, flooring and other finishes often find it simpler to place them with a one-stop furniture and building materials supplier, since one production schedule and one shipment remove the coordination work that otherwise sits with you on site.

Panel dimensions, substrate preparation and installation responsibility should be confirmed for each project before production begins. Finish availability and configuration details are confirmed against the specification you select.