A wall panel quotation almost never arrives on the first email. Not because the panel is complicated, but because two buyers asking for the same decorative wall panel can be buying completely different things: one needs 30 m² of a stock size fixed to a bedroom feature wall, the other needs 400 m² cut to non-standard heights, matched across three batch runs and shipped to a villa site. The information below is what we ask for on enquiry, in the order our team actually uses it. Send it together and the specification, quantity and delivered price normally come back in one reply rather than a chain of follow-up emails.
1. The wall area, not the room count
"Four bedrooms" tells us nothing. We need the net panelled area in square metres or square feet, measured on the finished wall face, plus how that area breaks down by room.
- Net area per wall run — length × height of each surface to be covered, with openings (doors, windows, wardrobes) deducted. Rough figures are fine at the enquiry stage; a floor plan with dimensions is better.
- Total plus wastage — tell us whether your figure already includes cutting allowance. Off-cuts on patterned or 3D surfaces are rarely reusable, so order quantity and net area are not the same number.
- Wall height and any full-height requirement — a 2.7 m ceiling with a floor-to-ceiling panel needs either a custom panel height or an approved horizontal joint. Which of those you accept changes both price and lead time.
- Substrate condition — plasterboard, brick, render, cement board or an existing tiled wall. Panels are fixed to a flat, dry substrate; where the wall is uneven or tiled, say so, because it may need preparation work before installation.
2. Surface look, texture and colour reference
Panels are specified by appearance far more often than by material code. The fastest route is a reference image of the effect you want: our modern decorative wall panel range simulates stone, wood grain, fabric and similar finishes, so one photograph can narrow the choice to a handful of options.
- A photo or mood board for each space — even a Pinterest-style reference from another project works as a starting point.
- The finish you want in words: matte or gloss, warm or cool wood tone, light or dark stone effect, flat surface or relief.
- Whether colour must match an existing item — flooring, cabinetry, joinery or fabric. If so, send the make and model of that item or a physical sample, because screen colours are not a reliable match basis.
- Texture direction and pattern repeat, if the design has one. Wood grain and stone-effect panels have a running direction; on large walls we need to know whether joints should run vertically or horizontally.
3. Panel format: flat, 3D or flexible
The same wall can be solved with different formats, and each quotes differently. Tell us which you are picturing, or send the drawing and we will recommend one.
| Format | Typical use | What we need from you |
|---|---|---|
| Flat decorative panel | Bedroom background walls, hotel room feature walls, office and retail wall cladding | Panel size preference, joint detail, edge trim requirement |
| Relief / 3D panel, such as our luxury decorative 3D wall panel | Living room TV walls, lobbies, reception and restaurant feature walls where shadow and depth are the point | Pattern selection, whether the relief must align across panels, lighting plan for the wall |
| Flexible panel | Curved walls, columns, arches, reception desks and wrapped reveals | Radius of each curve, height of the wrap, whether the corner is a radius or an arris |
For integrated schemes — panelling combined with doors, niches or concealed storage — see our wall panel systems. Those are made to drawing rather than selected from a catalogue, so they need the architectural detail instead of a product choice.
4. Where the panels are going, and what the room does
Interior wall panels are not all suitable for the same interior conditions. Two questions decide specification:
- Room type and use — a private bedroom, a hotel corridor with luggage traffic, a restaurant, a spa changing area or a shopping mall entrance. Surfaces in high-contact areas are specified for stain resistance and cleanability first.
- Humidity and temperature exposure — bathrooms, kitchens, laundries, indoor pools and coastal villas in humid climates put walls in a different class from living rooms. Our panel listings state moisture resistance for indoor use, but we still need the actual room before confirming a specification.
- Impact exposure — corridors, function rooms and children's rooms need panels and trims that take knocks at chair height.
5. Quantity, batch consistency and phasing
For home decoration this is a short section; for a villa or apartment project it decides the price structure.
- Total quantity and unit — square metres, number of panels, or number of rooms. State which.
- Number of sites and whether delivery is consolidated — one villa, several villas in one development, or a hotel plus a show flat.
- Phasing — if the same panel repeats across phases months apart, tell us now. Colour and texture consistency between production batches is something we plan for at the first order, not at the second.
- Spare material — panels installed on site get damaged. We recommend ordering spares with the main shipment; reordering a small quantity later is slower and can fall outside the original batch.
6. Fixing method, accessories and who installs
Panels are lightweight and cut on site, and the product pages describe straightforward installation — but a quotation is only complete once we know who is doing the work.
- Who installs: your local contractor, our on-site team, or you. This determines whether the quote covers accessories and technical guidance only, or installation as well.
- Fixing detail: adhesive, mechanical fixing, or a battened sub-frame. If a designer has specified a cavity for services behind the panel, mention it.
- Edge and corner treatment: matching trims, shadow gaps, or butt joints to adjacent finishes such as plasterboard or stone. Trims are quoted separately and are the most commonly forgotten line item.
- Cutting conditions on site: whether panels can be cut and handled indoors, and access for deliveries to upper floors.
7. Delivery terms and destination
Panels are bulky and edge-sensitive, so freight method affects both cost and packaging.
- Delivery address and port of discharge, plus whether delivery is to a depot or direct to a restricted site.
- Preferred Incoterms — ex works, FOB, CIF or door-to-door. We arrange sea, air and rail freight with customs paperwork where door-to-door service is chosen.
- Required arrival window, working backwards from your install date. Panels are usually made to ordered size and colour, so the schedule needs production time as well as transit time.
- Packaging needs for your handling route — palletised, bundled, or crated for high-value relief panels with edges that must arrive undamaged.
8. Drawings, samples and approvals
- Send what you have: a marked-up floor plan, an elevation of the feature wall, a 3D render, or photographs of the existing wall. A single annotated elevation removes most of the guessing.
- Sample request: state which finishes you want to see physically and where to send them. Samples settle colour and texture questions that photographs cannot.
- Approval route: who signs off the finish — owner, interior designer, main contractor or developer. If a client presentation date is driving the timeline, tell us that date.
What a complete quotation covers
Once the eight items above are in hand, the number you receive should be read as a package rather than a unit rate. Compare quotations on the same basis:
- Panel quantity at the ordered size, with wastage stated separately so you can see what you are actually paying for.
- Trims, edges and corners — confirm they are included, priced per linear metre, or omitted.
- Packaging and freight basis — the same Incoterm makes two offers comparable; mixed terms do not.
- Production time plus transit time, stated as separate figures against your install date.
- What is excluded: wall preparation, sub-frame, on-site cutting waste, installation labour.
If a competitor's price looks materially lower, the difference is almost always in one of those five lines rather than in the panel itself. Check ordered area and trim coverage before accepting the cheaper offer.
A short enquiry template that works
Copy this into your message and fill in what you know. Anything left blank we will ask about once, not repeatedly.
- Project: private home / villa / hotel / apartment / retail — with city and country of delivery
- Rooms to be panelled and net area per room, stating whether wastage is included
- Wall heights, and whether floor-to-ceiling panels are required
- Reference image or finish description for each space; anything the colour must match
- Format preference: flat, 3D relief or flexible for curves
- Room conditions: humidity, impact exposure, cleaning expectations
- Substrate type and wall condition
- Quantity, sites, phasing, and spares requirement
- Who installs, fixing method, trim detail
- Delivery address, preferred Incoterms, required arrival date
- Drawings available, samples requested, and the approval deadline