On paper, two swim spas can share the same jet count and the same footprint, then arrive at site with completely different shells, cabinets and water systems. Before you raise a purchase order for Outdoor Swim Spa WS-PC05ST-L, the finish schedule is the part of the quotation worth reading line by line. This guide lists the details a buyer should put in writing, and shows how each one changes what you receive.

Start From What the Catalog Already Fixes

The published catalog entry for WS-PC05ST-L records a shell opening of 5490 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six jets in total and four LED lights, with a listed total power of 6.55 kW. Those figures set the envelope for everything else: how the spa sits on a terrace slab, how much clear space an installer needs around it, and what electrical capacity the site must supply.

Two items in that same entry are deliberately open. The water pump is not listed for this configuration, and the description asks buyers to confirm included equipment and electrical requirements for the selected configuration. Treat both as decisions to make, not as gaps to hope about. A spa ordered without a stated pump specification is not comparable, price to price, with one that includes it.

The Six Finish Details to Confirm in Writing

1. Shell material and colour

Swim spas in this range are built around an acrylic shell with a reinforced cabinet structure. Ask for the shell colour code, the panel finish on the visible side, and whether the surface is a single acrylic layer or an acrylic shell with backing panels. Colour samples photographed on a screen shift noticeably under pool lighting; request a physical swatch or a reference to an installed project you can visit.

2. Cabinet cladding and how it faces your climate

The cabinet is the part of the unit a guest or a homeowner actually sees, and it is also the part exposed to rain, sun and pool chemicals. Confirm the cladding material, the colour, and which side of the unit gets the finished face. A spa placed against a wall needs a different finish schedule from one standing free in the open, and that difference should appear on the drawing before production starts.

3. Insulation package

Insulation appears in the catalog as an option rather than a certainty. For a spa used year-round, ask what is insulated — shell, cabinet base, pipework — and what material and thickness are supplied. If the unit ships to a cold or coastal site, insulation also affects freight packaging and the risk of condensation inside the cabinet during the first weeks of operation.

4. Steps, access and how people enter the water

Steps are listed as an optional accessory. Confirm the step width, tread depth, handrail or no handrail, and where the steps sit relative to the swim training system at one end and the jet seating at the other. Entry position determines which side of the shell needs a non-slip finished surface, so this decision belongs in the finish schedule rather than in an afterthought email.

5. Jets, lighting and water treatment as specified items

The catalog shows six jets, four LED lights and ozone for this model. Ask for jet type and position on a dimensioned layout, the fitting colour of the lights, and whether UV sterilization or sand filtration is included in your package or quoted separately. Ozone generation and filtration are maintenance items; specifying them now avoids a second shipment later.

6. Control system and electrical interface

One control system is listed. Confirm the controller make and interface language, where it is mounted on the cabinet, and what the site must provide: supply voltage, phase, circuit capacity for the 6.55 kW total power figure, protection devices and an isolator within reach of the installer. The electrical scope boundary — factory work versus local contractor work — should be drawn in the order documents.

How Finish Choices Move the Specification

Detail to confirmWhy it changes the outcome
Water pump (not listed for this configuration)Determines swim current strength and whether your quotation is comparable with other packages
Shell colour and panel finishSets the look of the water surface and how the unit reads against paving and decking
Cabinet cladding on the exposed faceControls visible appearance, weather exposure and cleaning routine
Insulation packageAffects running energy demand, condensation risk and suitability for cold-season use
Steps and entry positionFixes circulation around the unit and where non-slip finishes are required
Filtration and sterilization optionsDefines the maintenance schedule and spare parts you must stock

The same logic applies across the range. The shorter WS-PC05ST shares this equipment list at 5000 × 2400 × 1470 mm, so the finish decisions are identical and only the length changes. Where a standard rectangle will not work — a curved terrace edge or an irregular courtyard — our customizable shape outdoor spa covers square, round, oval and curved configurations in an acrylic shell with structural reinforcement.

Reading the Options List Before You Compare Prices

The catalog options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, which means two quotations for "WS-PC05ST-L" can legitimately differ in price because they contain different equipment. When you compare offers, put the option list beside each price and check three things: what is included as standard, what is quoted as an add-on, and what is simply absent from the document.

A heat pump deserves particular attention. It is usually the largest single addition to the specification for a spa used outside summer, and its capacity should be sized against the shell volume and the intended water temperature rather than chosen from a catalogue line.

Confirm included equipment and electrical requirements for the selected configuration before production starts. Catalog figures describe the standard published entry; your order documents govern what is delivered.

A Short Checklist for Your Enquiry

  • Shell colour code and cabinet cladding specified, with finished face identified on a drawing
  • Water pump stated in the package, with performance data attached
  • Insulation scope and material confirmed for the destination climate
  • Steps, handrail and entry position dimensioned against the swim training end and jet seating
  • Filtration, ozone and any UV sterilization listed as included or separately quoted
  • Voltage, phase, circuit capacity and isolator responsibility assigned to factory or local contractor
  • Spare parts list and consumables identified for the first service period

Putting It Together With the Rest of the Project

A swim spa is rarely ordered alone. On villa and resort projects it sits alongside poolside lounging furniture, paving, external lighting and sometimes an outdoor kitchen or changing area — which is why we work as a one-stop furniture and building materials supplier rather than as a single-product vendor. Our custom and OEM service covers bespoke finishes, materials and dimensions when the standard catalog specification does not match the design intent, and our logistics and door-to-door delivery service handles freight documentation so the unit arrives at the site address in the package the installer expects.

Send us the model reference, the site photographs and your finish preferences, and we will return a specification sheet showing exactly which shell, cabinet, insulation and equipment items are included for WS-PC05ST-L before you commit to production.

Send your model reference, site photographs and finish preferences through our contact page, and we will return a specification sheet for Outdoor Swim Spa WS-PC05ST-L before production.