A wardrobe enquiry rarely stalls on style. It stalls on gaps: a room measured from a plan instead of the finished floor, a hanging height decided after the joinery drawing is signed, or a veneer specified as "oak" with no note about grain direction across a run of doors. Natural oak veneer wardrobes look simple on a mood board and demand precise inputs in production. The list below is what our project team works from when a made-to-measure oak wardrobe package moves from enquiry to manufacturing drawings.
Start With the Room, Not the Wardrobe
Built-in wardrobes are fitted against walls that are never perfectly square and floors that change height with the finish layer you have not laid yet. Send us the room dimensions taken at the stage the wardrobe will be installed on, or state clearly which stage they were taken at.
- Width and depth at three points — top, middle and bottom of each wall run. A variance of a few centimetres across a 3 m wall is normal in a concrete shell and changes how the carcass is scribed on site.
- Floor finish build-up — screed, adhesive, tile, engineered board or carpet underlay. Tell us the final floor level, not the structural slab, and whether the wardrobe sits on the finished floor or on a plinth built up to it.
- Ceiling type and clear height — a suspended ceiling with downlights, a plasterboard soffit, or an exposed slab each changes whether the unit runs to the true ceiling or stops under a service zone.
- Obstructions on the drawing and in reality — skirting that will be removed or retained, architraves, wall-mounted ducts, switch plates, door swings and any window reveal the unit must pass.
- Access route to the room — stair width, lift door size, corridor turns and lift car depth. A full-height side panel that cannot reach the bedroom becomes two panels with a visible joint, and that decision belongs in the drawing stage, not on delivery day.
Height Decisions That Shape the Whole Layout
Overall height is only the first number. The internal split follows how the space is used, and each zone has a working dimension worth stating in the enquiry.
| Zone | What to specify | Why it matters in production |
|---|---|---|
| Long hanging | Number of rails, garments per rail, longest item to hang (coats, dresses, uniforms) | Sets rail height and shelf position above it; a guest-room robe store and a master bedroom need different heights |
| Short hanging / double stack | Whether two rails are stacked and at what combined height | Determines shelf thickness and the load path through the carcass |
| Drawers | Count, drawer width, whether jewellery or heavy knitwear goes in them | Drawer runners and front heights are fixed once the elevation is issued |
| Shelving | Fixed versus adjustable shelves, shelf depth, tallest item to stand upright | Adjustable shelving needs a row of pin bores that must not clash with the door line |
| Top storage | Luggage height and depth, plus whether a step is available in the room | A compartment above 2.1 m only works if someone can reach it safely |
| Open display and lighting | Niche positions, glass shelves, any integrated lighting and where the transformer sits | Wiring must be routed and concealed before panels are edged and drilled |
Door Type Changes the Clearance You Need to Report
The door choice is a space decision before it is an aesthetic one, because each type consumes a different envelope. Tell us which of these your designer has in mind and we will confirm what the room must allow.
- Hinged doors need clear swing space in front of the unit. Report the distance from the wardrobe face to the opposite wall or bed edge, and note anything that sits inside the arc.
- Sliding doors save floor space in front of the opening but need depth for the track and an overlap zone where two panels pass each other. Our Wooden Sliding Door Wardrobes line shows this configuration; panel count and track depth come from your opening width.
- Walk-in layouts are planned as rooms rather than units. For an L-shaped or aisle layout, send the clear walking dimension between runs of storage, since that governs whether doors can open while someone stands inside. See L Shaped Walk in Wardrobes for the layout type.
- Corner and awkward-plan units need the corner radius or the angle of the wall, plus how deep you actually want to reach into the corner. Hinged Door Corner Wardrobes covers this case.
What "Natural Oak Veneer" Actually Requires You to Specify
Veneer is a thin cut of real oak over an engineered board core, which is why it moves well in conditioned interiors and why the appearance depends on decisions you have to make in writing. Our Natural Oak Veneer Wardrobes are made to measure with material and finish options selected per project, so the following inputs go on the specification sheet.
- Cut and grain direction — crown cut or quarter sawn, and whether grain runs vertically across every door in a row. State whether you want matching grain between adjacent doors or deliberate alternating grain; both are common, and they look different on site.
- Colour and treatment — natural oak reads warm and pale, while smoked, matte and high-gloss treatments shift the tone. Compare within the same collection: Matte Finish Veneer Wardrobes and High Gloss Veneer Wardrobes sit in the same family with different surface behaviour under bedroom lighting.
- Board core and edge treatment — the substrate grade, edge banding colour and whether edges are visible on any open end panel.
- Hardware — hinge brand and soft-close preference, runner type, handleless groove or exposed pull, and any integrated lighting. Send the hardware schedule if your designer already issued one; we can also work to an OEM specification under our custom and OEM service.
- Sample approval — confirm whether you need a finish sample before production release, and who signs it off. Veneer batches vary in figure, so an approved physical reference removes the argument later.
If solid timber rather than veneer is what the design calls for, that is a different specification sheet with its own movement allowances — Oak Solid Wood Wardrobes sits in the solid wood collection and we will quote it separately.
Project Inputs That Affect Price and Sequencing
Single wardrobes and wardrobe packages are quoted differently, because a repeatable unit across a villa development or a hotel room type is manufactured and packed as a set. Include these in the enquiry so the quotation reflects the real scope:
- Quantity by type — how many of each layout, and whether rooms repeat. Repeat units with identical dimensions cost less per unit than one-offs.
- Drawings or reference images — a dimensioned elevation is ideal; photographs plus your measurements are acceptable to start from, and our team can prepare the production drawing for your confirmation before cutting.
- Interior design support — if the layout is not fixed yet, space planning, 3D visualisation and production coordination sit within our interior design services, and wardrobes are usually part of a wider fit-out alongside vanities, wall panelling and doors.
- Delivery address and access — port of discharge, final site address, container access, and who receives the goods. We arrange freight with customs paperwork and door-to-door delivery; import terms, duties and transit arrangements are confirmed case by case for each destination.
- Installation responsibility — tell us whether your own fitters install the units or you want installation support from our team, including snag inspection at handover. This changes the packing method and the fixing details on the drawing.
- Programme dates — the date the room must be clear of the wardrobe trade, working backwards. Site programmes slip; give us the real target so production slots are booked against it.
A Simple Checklist Before You Send the Enquiry
Two Details Worth Confirming Before Drawings Are Issued
First, whether the unit is scribed to the wall or set off it with a shadow gap. Scribing hides a wall that is out of plumb; a shadow gap states it as a design feature. Both are legitimate, and the choice changes the panel detail.
Second, how the wardrobe relates to neighbouring finishes. If oak-veneer panelling, a door leaf or a vanity in the same bathroom carries the same wood tone, all of them should be specified together against one approved sample. Ordering the joinery first and the wall panels later is where matched timber usually fails.
Where the wardrobe is part of a larger package — cabinetry, panelling, doors and vanities for the same building — send the whole joinery schedule together. Coordinated built-in furniture is manufactured against one set of levels and finishes, which keeps the oak tone consistent across rooms instead of matched after the fact.