A bidet rarely decides a bathroom scheme on its own, yet it is the fixture most often left out of a sanitary suite quotation until someone notices the missing line item. If your project includes a wall hung bidet 1004F, the difference between two supplier proposals usually sits in details that are not visible in a photograph: how the pan is fixed, what the glaze actually feels like under your hand, and whether the quotation includes the pieces the installer will ask for on site. The checklist below follows the order a procurement review normally moves through, from the sample bench to the paperwork.

Start with the sample, not the specification sheet

Ceramics are judged in person. When a 1004F sample arrives, spend the first ten minutes on the surface rather than the drawing. Run a fingernail across the glaze and into the inside of the bowl. A well-fired vitreous ceramic body with a continuous glaze layer feels glassy and unbroken, including on inner surfaces that never see daylight once installed. Where the glaze thins or stops, the fixture will pick up stain and mineral marks there first, and housekeeping in a hotel or serviced apartment will be scrubbing those spots for the life of the property.

Turn the sample over and look at the back panel that carries the wall fixing. On a wall-hung pan this is structural, not cosmetic: it should be flat, fully finished and thick enough to take anchors into a solid wall or a framed cistern wall. A thin, rough or unfinished rear face is a sign the fixture was designed for floor-standing use and adapted, which changes how it behaves once loaded with a person sitting on it.

Then check the outline. The 1004F reads as a rectangular pan with softened corners, so the corners themselves are worth inspecting: sharp internal angles trap residue, while properly rounded transitions clean in one pass. A quick test is to wipe the bowl and the rim area with a damp cloth and see what the cloth picks up afterwards.

Compare dimensions against your setting-out drawings

The published size for model 1004F is 545 x 360 x 410 mm. Treat that as a starting point and confirm the current technical sheet before you set out any pipe positions, because dimension callouts on product pages and on interface drawings are not always drawn to the same revision. What matters on site is whether those three numbers clear your partition depth, the clearance in front of the pan, and the height of the waste connection relative to the finished floor level.

Ask each supplier to state, in writing, the trap type and the rough-in dimension they are quoting. For wall-hung sanitary ware this is where proposals diverge most: a bidet that suits your layout on paper can be unusable if the outlet does not match the wall drainage already built. Do not accept "standard" as an answer; require a figure, and require it to appear in the quotation rather than only in a catalogue PDF.

Point to confirmWhy it decides the comparison
Overall size on the current technical sheetGoverns partition depth, front clearance and tile setting-out lines.
Trap type and rough-in dimensionDetermines whether the pan connects to the drainage as built, or whether pipework has to be reworked.
Fixing method (back panel plus wall anchors)Tells you what substrate is required and what must be supplied with the pan.
Whether cistern, seat, fittings and taps are includedOmitted items appear later as variations, which erase any price advantage.
Matching pieces in the same seriesA suite ordered as one series keeps shape, glaze tone and edge profile consistent across rooms.

Compare the whole suite, not one fixture in isolation

Bidets are specified alongside a water closet and a basin, and mixed-series suites are where projects lose visual coherence. The 1004 series pairs the wall-hung bidet with a matching washdown one piece toilet 1004A and a wall hung ceramic basin 1004B, so the silhouette, glaze tone and edge treatment carry across all three pieces. If one supplier quotes a 1004F bidet and another quotes an unrelated pan, you are not comparing prices; you are comparing two different bathrooms.

Where a project mixes wall-hung and floor-standing solutions across room types, the same logic applies at suite level. A floor standing bidet 1038F fixes to the wall with a back support and suits layouts where floor drainage or a masonry wall makes a wall-hung installation awkward, while wall-hung pans leave the floor clear so mopping passes underneath without lifting anything. Compare each room on its own construction conditions, then group the order by series.

Ask for the same three pieces from every bidder in the same quotation round. When one line is missing, request it before you open the price comparison; a bidet omitted from a suite package is not a saving, it is an unfunded requirement.

Read the proposal for what is left out

  • Fixing hardware and carrier frame. State explicitly whether anchors, the fixing rail or the concealed cistern assembly are included, and who supplies them.
  • Traps, seals and connectors. These decide whether the installation finishes on schedule; a missing connector stops a room.
  • Seat and fittings. Confirm whether they are quoted with the pan or priced as accessories.
  • Packaging for export. Ceramics travel badly in light packaging. Ask what the packing standard is and how breakages are documented on arrival.
  • Spare parts availability. Glaze tone and replacement pans need to remain obtainable years after handover, especially across multiple room types.

A useful discipline is to copy every proposal into the same column layout before scoring anything. Line items that sit in a footnote in one quotation should appear as a priced row in all of them. Once the omissions are levelled out, price differences usually shrink and the real difference becomes what each supplier can actually deliver.

Score the supplier project process

Sanitary ware is rarely a one-off purchase on a villa or hospitality project; it arrives together with tiling, joinery, lighting and ironmongery, and someone has to keep those packages coherent. When you compare proposals, weigh how each supplier runs the work: whether design and specification are confirmed before production starts, whether customisation of finish or size is available and at what order quantity, how freight and customs paperwork are handled, and who attends to installation snags and replacements after handover. SANTERSON works as a China-based manufacturer and one-stop supplier covering furniture and building materials, with services that run from design consultation and material selection through production, door-to-door logistics and after-sales support, which is why enquiries for bathroom ceramics are usually handled inside a wider fit-out package rather than as a single fixture order.

Test this in the enquiry itself. Send the same setting-out drawing to every bidder and ask each one to return their recommended pipe positions for the 1004F. A supplier who answers with drawings, dimensions and a complete line-item list is demonstrating the coordination capability you will depend on later. One who answers only with a price is showing you what the relationship will look like when something goes wrong on site.

Before awarding, confirm three numbers against the current technical sheet rather than the product page: overall dimensions, trap type and rough-in dimension. These are the values most likely to differ between revisions of a listing, and they are the ones your plumber will hold you to.

A short comparison routine that works

  1. Order physical samples from every shortlisted bidder for the same model, and inspect glaze continuity, back-panel thickness and corner radii.
  2. Request the current technical sheet in writing; log dimensions, trap type and rough-in against your drawings.
  3. Re-quote each bidder on an identical line-item list: pan, seat, fittings, fixing hardware, traps and matching suite pieces.
  4. Check packing standard, breakage handling and spare-parts availability for the same series.
  5. Score process quality, meaning drawings returned, specification questions answered and coordination offered, alongside price.

Two proposals for the same model number can differ substantially once omissions are levelled out. The sample tells you about the ceramic; the technical sheet tells you whether it fits; the line-item list tells you what you are actually paying for. Complete all three before you sign.

For project enquiries covering bathroom sanitary fixtures, including wall-hung bidets, toilets and basins supplied as a matched suite, contact SANTERSON: phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.