A swim spa shell arriving on site is only half of the job. The Outdoor Swim Spa WS-S38 carries pumps, a filter circuit, lighting, ozone and a waterfall line in one cabinet, so the site has to be ready for power, base support, access and commissioning on the same day the container is opened. Below is the coordination sequence we use on villa and resort projects, from quotation through handover.
Why this model needs earlier planning than a standard spa
The WS-S38 sits at 3760 x 2080 x 1110 mm in the catalogue, with three water pumps, one filter pump, 51 jets including six water columns, four LED fixtures with twelve small LEDs, and a total power figure of 14.05 kW. That electrical load alone changes the conversation: it is not a plug-and-play unit, and the supply, protection and cable routing have to be designed before the paving or deck is closed. Ozone and waterfall functions are listed as shown features for this model, while optional items such as UV sterilization, a heat pump, sand filtration, extra insulation and steps are catalogued separately and vary by configuration. Everything that follows assumes a confirmed specification, because delivery paperwork and site preparation both depend on it.
| Element on WS-S38 | What the site has to provide |
|---|---|
| Total power 14.05 kW, 3 water pumps, 1 filter pump | A dedicated supply with correct protection, sized by a local electrician from the final configuration sheet |
| Footprint 3760 x 2080 mm, height 1110 mm | A level, load-bearing base with clearance for the cabinet and equipment access |
| 51 jets, 6 water columns, waterfall | Drainage able to handle overflow and service draining without ponding around the cabinet |
| Ozone, LED lighting, control system (1 set) | Dry, ventilated location for the control unit and a route for cabling that stays serviceable |
| Optional heat pump, sand filtration, insulation, steps | Extra space and, where relevant, extra power and drain points decided before the base is poured |
Step 1: Lock the configuration before production starts
Most delivery problems we see trace back to a specification that was still open when goods shipped. Before the order goes into production, confirm with the factory:
- The exact accessory set for your unit: control system, heat pump, sand filtration versus cartridge filtration, UV sterilization, insulation package and steps.
- Electrical requirements for that configuration, stated in writing so your electrician can quote from it rather than guess.
- Which features are included and which are shown as options on the model, so nothing is assumed at handover.
Our Custom & OEM Service covers bespoke material finishes and configuration work, and where a project needs a non-standard shape or layout we handle it as part of the same production file. If you are selecting between models rather than committing to this one, the Swimming Pools and Swim Spas range shows alternative footprints and equipment sets, which matters when site access is tighter than a 3.76 m shell allows.
Step 2: Fix the delivery date against the site programme
A swim spa should arrive after the groundworks are finished and before the landscape contractor returns. Work backwards from your preferred commissioning date:
- Base and drainage first. The slab, waterproofing and drain runs must be complete and cured. Cutting a drain into a finished deck is the most common reason we see a handover slip.
- Power second. The sub-board, protective device and conduit need to be in place with the cable pulled to the cabinet location, not left until after installation.
- Access third. Confirm the route from the kerb to the final position: gate width, overhead branches, pergola beams, steps and any crane or forklift requirement. A 3760 mm shell will not pass through a standard garden gate in one piece.
We arrange sea, air and rail freight with customs documentation, packing lists and door-to-door delivery under Furniture Logistics and Door-to-door Delivery. Tell us the delivery window your site team can accept and we align production completion to it, rather than shipping on a date that suits the factory only.
Step 3: Sequence receiving, positioning and connection
On arrival
Check the crate count against the packing list, photograph any damage on the packaging before the crew leaves, and note the model marking so the unit matches the order. Keep the control system and small accessories in a dry room; they are the items most often set aside and lost.
Positioning
Set the shell on the prepared base with the equipment side facing the access you intend to keep for servicing. Once filled, the unit is not a piece of furniture you can slide a metre sideways, so alignment against the deck edge and any steps has to be right at this stage.
Connection
Electrical work belongs to a licensed local installer. They should connect to the supply designed for your confirmed configuration, and they are also the right person to confirm earthing, protection and any local requirements for an outdoor water installation. We supply the equipment and the technical information; the on-site electrical sign-off is local.
Step 4: Commissioning and handover
Fill the shell, run each pump and jet circuit in turn, check the waterfall line and the six water columns for leaks at the joints, verify the control system responds as expected, and confirm the ozone and lighting circuits operate correctly. Insulation and steps, if ordered, should be fitted and checked at the same visit.
Record the configuration actually installed, with the accessory list and the technical sheet, in the project file. Six months later that document is what makes a spare part request straightforward. Our Furniture Installation and After-sales Support service covers on-site installation guidance, inspection with snag lists, warranty handling and spare parts, and for interior fit-out packages the same team coordinates under Furniture Installation for Interior Projects.
A short pre-delivery checklist
- Configuration signed off, including options and electrical requirement stated in writing.
- Base level, load-bearing and cured; drain point in place and tested.
- Sub-board, protection and conduit installed; cable pulled to the cabinet position.
- Delivery route surveyed: gate width, overhead clearance, lifting method agreed.
- Delivery window confirmed against your site programme, not only against production.
- Local electrician briefed on the confirmed configuration before arrival.
- Commissioning date and snag inspection booked with the site team.
Bringing the spa into a wider package
On most villa projects the swim spa is one line in a longer list: Outdoor Furniture for the deck, wall and ceiling finishes, lighting, cabinetry and bathroom fixtures. Coordinating those on one production and shipping plan removes the sequencing risk that a single late shipment creates. Our Turnkey Villa Furnishing service handles design coordination, production, logistics and site support as one scope, which is how we delivered joinery and furnishing on the villa projects we publish in our Project Cases.
Send us the model, the confirmed option set and your site programme, and we will return a delivery plan that your base contractor and electrician can work to.
Plan delivery and installation for WS-S38