A request for quote that only says "one media unit, glass front" will come back with a price you cannot compare and a delivery you cannot plan around. Glass-front media units are made-to-measure pieces: the finish, the layout, the dimensions and the hardware are all specified by the buyer, so the quotation follows exactly what you put in the request. The checklist below shows what to send when you are quoting Santerson Glass Front Media Units for a villa or residential living project, and what the supplier needs in order to answer with something usable.
Why the Request Drives the Whole Quotation
Santerson is a China-based manufacturer working on villa, hospitality and office projects, supplying furniture and building materials; its media wall products are configurable listings rather than fixed catalogue items. For this category the site states that finish, layout and dimensions can be specified to suit each space, and that glass, storage and hardware selections must be confirmed per project. That means there is no single list price for a glass-front media unit. The quotation you receive is a direct reflection of how much of the specification your request already contains.
A buyer who sends dimensions, a room elevation and a finish preference receives a priced configuration. A buyer who sends a photograph from a magazine receives an estimate with assumptions inside it, and those assumptions surface later as change orders. The practical goal of the request for quote is to remove guesswork on both sides before the first number is written down.
1. Room Data and the Wall Elevation
Send the wall, not just the unit. A simple elevation sketch or a set of measured photographs tells the supplier far more than a single width figure.
- Overall run length of the wall, plus floor-to-ceiling height at both ends of that run. Floors and ceilings in renovated villas are rarely perfectly level.
- Position of the TV centre line from each end of the run, and the finished screen size you intend to mount.
- Location of skirting, architraves, radiators, downlights, switches and any existing recess that the unit must bridge or avoid.
- Whether the unit stops short of the ceiling, runs full height, or wraps into an adjacent wall or alcove.
If your project has drawings available, attach them. Santerson's Interior Design Services cover space layout planning, furniture layouts and 3D visual renderings, and the workflow on that page moves from a project brief and design proposal to quotation and detail confirmation before production. A request that arrives with drawings already in hand shortens that first stage considerably.
2. Glass Type and What Sits Behind It
Glass front is a family of choices, not one specification. State plainly which effect you want, because clear, frosted, ribbed and smoked glass each change what the bay shows from the room.
| Decision | What to write in the request |
|---|---|
| Glass appearance | Clear, frosted, ribbed or smoked; and whether the glass should display contents openly or obscure them. |
| Frame around the glass | Timber-matched frame, aluminium frame, or handleless edge; state the profile direction you want if you have a reference detail. |
| Door action | Hinged, sliding or lift-up; and the swing direction or track side for sliding doors. |
| Contents of the glass bay | Shelving only, shelving with display lighting, or a cabinet that must hide equipment while remaining visible. |
Be explicit about what you want concealed. A glass-front unit in a family living room usually needs some closed volume alongside the display bay; if so, say how much of the run should be solid-fronted and how much glazed. Where that split is not decided yet, ask for both options to be priced.
3. Storage Layout and Internal Fittings
List what has to live in the unit: consoles, set-top boxes, a games library, board games, glassware, records. Then state how each item should be stored: behind doors, on open shelves, in drawers or inside closed cabinets.
- Number and type of compartments, and which of them are glazed.
- Adjustable shelf pins versus fixed shelves, and the tallest single item you need to accommodate.
- Drawer count, drawer depth and whether soft-close is required.
- Cable routing: how many pass-through holes, which compartments they belong in, and whether a power strip or socket must be mounted inside.
- Ventilation for any equipment that generates heat, and the clearance you need around it.
If you are weighing glass-front units against other layouts in the same collection, ask for those to be quoted as alternatives on the same request. Santerson Open & Closed Combo Units combine open and closed storage in one run, while Santerson Integrated LED Media Units build lighting into the carcass. Requesting two or three configurations at once lets you compare cost per metre across layouts instead of guessing which one fits the budget.
4. TV Mounting and Wall Construction
State how the screen will be supported, because this is a structural question rather than a cosmetic one:
- Screen size, weight if known, and whether the mount is fixed, tilting or full-motion.
- Whether the TV sits on the unit or is fixed to the wall above it.
- Wall construction behind the media wall: stud partition, masonry, or a built-in panel system; and who is supplying the substrate.
Where the screen is fixed to the wall rather than to the furniture, say so clearly. Santerson Wall Mounted Media Walls are specified with mounting and storage requirements confirmed for each project, and a request that leaves the substrate undefined will come back with a mounting assumption you may not be able to build to.
5. Finish, Material and Matching Joinery
Name the finish you are matching to, and say what it is being matched against. A veneer media wall specified alongside kitchen cabinetry, doors or wardrobes in the same villa needs a reference: a sample number, a photograph taken in daylight, or a physical swatch sent by post.
- Body material and front material, if they differ.
- Finish type: veneer, lacquer, acrylic, melamine or solid timber; plus sheen level.
- Whether internal carcases are finished to the same standard as the exterior, which matters for open and glass bays.
- Edge treatment on visible ends, since a media run that terminates into a room needs a finished return.
If other joinery is coming from the same supplier, mention it in the request. Ordering wardrobes, kitchen cabinetry and media walls from one supplier puts them in the same production plan, where finishes are reconciled internally instead of two workshops matching each other from photographs.
6. Lighting and Electrical Interface
Integrated lighting is where a quotation most often goes vague. Specify:
- Which bays are lit, and whether the light washes shelves, grazes a niche or lights contents from above.
- Colour temperature and whether dimming is required.
- Switch or sensor location, and who supplies the driver and where it will be accessible for service.
- Which trades connect what on site, and at which stage.
The product page for this collection asks that lighting and electrical details be confirmed for the selected design, so a request that simply says "with LED" is not yet quotable. A separate line item for Santerson Integrated Cabinet Lighting also makes it easier to change the lighting package later without repricing the whole unit.
7. Quantities, Sites and Programme Dates
Give the commercial frame as well as the technical one:
- Quantity of each configuration, and whether repeat units appear at other levels or in other apartments.
- Project location and the delivery address, if it differs from the site.
- Required on-site date and the latest acceptable date, so the production slot can be planned against a real programme.
- Your Incoterms preference: whether you want goods collected in China or delivered to the project.
Santerson's logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, and door-to-door delivery. Ask for the shipping option in the same request so that packing and transport appear as line items inside the quotation instead of arriving later as a separate charge. Confirm import terms, duties and transit time for your own country on a case-by-case basis.
8. What the Supplier Will Send Back
With the information above, expect a configuration drawing or elevation, a priced specification broken into carcass, doors, glass, internal fittings and lighting, and a stated delivery basis. Check that each line of your request has a matching line in the reply before you treat two quotations as comparable.
| Your input | What should appear in the response |
|---|---|
| Wall elevation and screen position | A scaled elevation showing compartment sizes and TV centre line. |
| Glass and frame choice | Glass type, frame profile and door hardware named on the drawing, not left as "as per standard". |
| Storage list | Shelf, drawer and cable provisions itemised per compartment. |
| Finish reference | The finish code or sample reference written on the drawing. |
| Lighting brief | Fitting type, colour temperature, driver location and control method. |
| Programme and delivery address | Production lead time plus a delivery basis and freight line. |
A Short Checklist to Paste Into Your Enquiry
Project name and location. Wall run length and heights at both ends. TV size, weight and mounting method. Wall construction behind the unit. Glazed bays and glass appearance. Frame and handle style. Door actions and directions. Shelf, drawer and cable requirements. Equipment to be housed and its ventilation needs. Lighting brief including control. Finish reference and items it must match. Quantities of each configuration. Required on-site date. Delivery basis and Incoterms. Who installs on site.
Before You Send It
Two checks are worth doing at your desk. First, confirm the request names the object in the title, a glass-front media unit for a living room, and not just "cabinet", so the supplier prices the right product family. Second, mark anything unresolved as an open question rather than leaving it blank; a listed unknown gets answered, while a blank becomes an assumption.
If your project also needs flooring, wall panels, wardrobes or bathroom fixtures on the same programme, mention them in the enquiry. Sourcing through a one-stop furniture and building materials supplier keeps finishes, delivery windows and site coordination under one production and logistics plan instead of several.
Send the wall elevation, the glass decision, the storage list, the finish reference and the programme dates in one request for quote, and the reply you receive can be compared line by line against every other offer on your table. Attach your drawings when you send the enquiry to SANTERSON, and include the project location so the freight option can be quoted in the same pass.