A freestanding cabinet looks simple on a drawing: a case, some shelves, a door. On site it is often where the schedule slips, because nobody agreed in advance who supplied the plinth, whether the services behind the wall were finished, or how the unit was meant to be levelled once it arrived in a crate. If the cabinet is made to measure and shipped internationally, an installation plan is what keeps those questions out of the site works.

A useful plan for a SANTERSON freestanding cabinet answers six things before anything is manufactured: the exact room dimensions, the agreed finish and internal layout, the wall and floor conditions, the services that must be reached later, who carries out each step on site, and how handover defects are recorded.

Why freestanding units need their own plan

Built-in joinery is fixed between structural lines, so the wall takes the alignment. A freestanding cabinet carries its own case and stands on the finished floor, which changes what has to be decided early. The floor has to be level and finished before the unit is placed. Skirting has either been cut back or designed around the case. If the cabinet sits in front of a wall that carries pipework, a socket or an isolating valve, access has to survive the installation, not be buried by it.

SANTERSON freestanding cabinets are configurable rather than fixed-size: dimensions, layout, material and finish are specified per project. That flexibility is the reason the plan matters. Two rooms that look identical on a floor plate can take different cases once you account for floor levels, door swings and the position of existing services.

The scope section: what is being installed, and where

Start with a line-by-line schedule rather than a general note. For each unit record the room and grid reference, the case size as specified, the door or drawer configuration, the finish, and whether it ships assembled or flat-packed. This is also where you separate freestanding cases from the adjacent built-in work, because those two are frequently quoted together and installed by different trades on different days.

  • Unit identification — item number matching the order, room, wall or grid line, and a mark-up drawing so the site team is not guessing which case goes where.
  • Size basis — the specified case dimensions plus the clearances needed for doors and drawers to open fully against neighbouring units, walls and door swings.
  • Finish reference — the approved sample or code for the door face, carcass, edge and hardware, recorded once and used consistently in shop drawings and on site.
  • Delivery form — assembled or knock-down, which determines whether a lifting route, a lift or extra hands are needed at the property.

Site conditions to confirm before the units arrive

Most avoidable problems on site are decisions that were never written down. Put a short condition checklist in the plan and have the local contractor sign it off before delivery, not after.

ConditionWhat to confirmWhy it fails later
Floor level and finished heightFinished floor level at the installation line, and how far the floor varies across the footprint of the caseDoors bind, drawers rub, plinth gaps open along one side
Wall straightnessWhether the adjacent wall is plumb and square to the case, or whether a scribe or filler panel is requiredVisible uneven shadow gap; scribing work becomes an on-site variation
Skirting and trimsWhether skirting is removed, cut back or designed around the case profileThe cabinet cannot sit to its setting-out line
Services behind and beside the casePosition of sockets, isolating valves, waste and any access panel that must remain reachableCovered valves and sockets; a later return visit to cut access
Load and fixing substrateWall build-up where any wall restraint or anti-tip fixing is specified, and what the substrate can holdFixings into a lining that was never intended to carry load
Moisture and wet areasWhether the room is a bathroom or laundry environment, and how the floor finish is sealed at the case perimeterWater tracking under the case; swelling at exposed edges
Delivery routeGate width, stair or lift dimensions, turning space in the hallway, and a dry storage area on siteDamage to cases or finishes on the way in; no safe place to store them

Sequence and responsibilities

Write the sequence as trades and dates, not as a general programme. A typical order of work: first fix and services signed off; floor finishes complete and cured; protective covering laid; units delivered and inventoried against the schedule; installation levelling and any restraint fixings; doors adjusted and hardware set; final clean; snag list issued. Then name who does each step.

SANTERSON lists installation and after-sales support alongside door-to-door logistics, so the plan should state plainly which steps the supplier's team performs and which belong to the local contractor — for example, site preparation, floor finishes, connection of any services, and making good around the case. Ambiguity here is the single most common cause of delay on fitted projects.

If the cabinet carries lighting or glass

Where a display specification includes internal lighting, as with an illuminated display cabinet, add the electrical items to the same plan: driver location, cable route, the point at which the driver becomes accessible for replacement, and who terminates the supply. A light that cannot be reached without removing the case will be opened on site eventually.

If the freestanding case sits within a larger wall scheme

Freestanding cabinets are often specified next to media or storage walls. Where they share a line with storage and display combination units, set out one datum line for the whole group and record which elements are fixed to the wall and which simply stand. Mixed fixing methods in a single run need to be drawn, not discovered.

Procurement lead time and how it shapes the plan

Made-to-measure cases are produced after drawings are confirmed, so the installation plan has to exist before production starts, not when the crate lands. Work backwards from your required site date: survey and dimension check, shop drawing approval, production, packing and freight, customs clearance, delivery window, then installation days. The supplier's logistics and door-to-door delivery service covers freight forwarding and paperwork; the local side still needs a receiving person, a storage area and access booked.

Confirm the actual transit window, Incoterms, duties and delivery address for your project in writing. Published marketing figures are not a commitment on your contract, and site programmes should be built on quoted dates for the specific order.

Inspection and handover

Close the plan with acceptance criteria so that both sides sign the same list. Inspect on delivery against the unit schedule, photograph any packaging damage before signing, then after installation check: case level in both directions, door gaps and alignment, drawer run-out and soft close operation, finish condition on visible faces, stability of any restraint fixing, and that every service access point is still reachable.

  • Unit schedule signed against delivered items, with item numbers checked on each case
  • Floor level recorded at installation; adjustment legs or packed plinths documented
  • All doors and drawers operated, adjusted and left in the closed position for handover
  • Any anti-tip or wall restraint fixing located and recorded on the drawing
  • Lighting drivers accessible, all circuits tested at the local board
  • Snag list issued with photographs, responsible party and target date for each item
  • Warranty terms, spare parts route and maintenance notes received in writing

Warranty coverage, response times and installer arrangements vary by project and region. Ask for the written terms applying to your order before installation begins rather than relying on general website claims.

How a one-stop supplier reduces the coordination load

Cabinets rarely arrive alone. A villa or hotel fit-out also needs furniture and building materials from several sources, and each additional vendor multiplies the interfaces to manage. Grouping cabinetry with related fixtures — vanities, wall panels, flooring, lighting — into one production and shipping programme means fewer sets of drawings to cross-check, one packing list per shipment and one installation window rather than several.

SANTERSON operates as a China-based manufacturer and one-stop supplier covering custom and OEM production, logistics and after-sales support for villa, hospitality and office projects. Published project references include villas in Sydney, Melbourne, Perth and North Turramurra. That scope is most useful when it is reflected in your installation plan: one coordinated package, one interface list, one handover.

Before you place the order

Send the room survey, the intended setting-out line, a note of every service that must stay accessible, and your required site date. Ask for shop drawings to approve against that information, and confirm in writing which installation steps the supplier's team performs on site.