A model code such as Outdoor Swim Spa WS-115AⅩ-U is easy to put on a purchase requisition and hard to buy well. Two suppliers can quote the same code, at similar money, and deliver completely different packages: one includes four water pumps and ozone sanitation, the other quietly prices heat pumps, insulation and steps as extras. Shortlisting is therefore not about finding the cheapest vendor who recognises the model number. It is about finding the small group of manufacturers whose documentation, configuration discipline and project workflow you can actually verify before the shell leaves the factory. The steps below are written for procurement officers, villa contractors and hospitality buyers comparing swimming pools and swim spas on a real project.
Start With the Model Code, Not the Supplier List
Most shortlists fail at step one because buyers send an identical enquiry to twenty factories and receive twenty non-comparable quotations. Send your requirement sheet first, then read who answers it properly. For the 115A shell, the catalogue data Santerson publishes gives you a concrete baseline to test answers against:
| Item on the specification sheet | What the catalogue record states |
|---|---|
| Model code | WS-115AⅩ-U |
| Catalogue dimensions | 3880 × 2200 × 1250 mm |
| Total power stated in the catalogue | 11.85 kW for this configuration |
| Water pumps / filter pump | 4 water pumps, 1 filter pump |
| Jet total | 23 jets |
| LED lights | 1 light |
| Control system | 1 set |
| Swim training system | Not listed for this variant |
| Features shown | Water jets, LED lighting, ozone |
Two points matter more than the numbers themselves. First, the same shell is offered in a sister variant, Outdoor Swim Spa WS-115AⅩ, at the same 3880 × 2200 × 1250 mm footprint but with a different equipment set: one water pump instead of four, a swim training system, a larger number of jets and lights, and a lower stated total power. If a supplier cannot explain which variant they are quoting and why the power figure moves between them, they are reselling, not manufacturing. Second, treat every published specification as a starting position to be confirmed in writing for your configuration, because options such as control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps change both the equipment list and the electrical load.
Screen One: Does the Factory Actually Build Swim Spas?
Swim spas sit at the awkward intersection of acrylic or fibreglass shell forming, stainless jet plumbing, electrical control assembly and structural framing for outdoor installation. Workshops that make cabinets, tiles or aluminium louvers often accept swim spa enquiries because the money looks good. Three checks separate the two groups quickly:
- A live product range, not one page. Ask for the full swim spa catalogue with dimension sheets. A real manufacturer has families of shells at different lengths and widths; a trader usually holds one or two photographs.
- Configuration knowledge. Ask what changes when you add a heat pump, swap to sand filtration, or request insulation for a cooler climate. Someone who builds these answers with part-level detail; someone who resells asks you to wait for an email.
- Named scope of manufacture. Establish which parts are made in-house and which are bought in, then ask how incoming components such as pumps, control boards and jets are inspected before assembly.
Santerson is a China-based manufacturer of furniture and building materials that has operated since 2008, with swim spas inside a wider catalogue that also covers furniture series, building and construction materials and interior fixtures. That breadth is an advantage on a villa or resort project, where the pool deck furniture, pergolas, loungers, wall panelling and lighting are usually bought separately from five different vendors. It is not, by itself, proof of swim spa capability, so run the same three checks as for any specialist factory.
Screen Two: Configuration Control in Writing
The most expensive disputes on a swim spa order are never about the shell; they are about what was assumed. Put these items into one confirmation sheet and require the manufacturer to sign it line by line:
- Exact model code and variant suffix, restated in the proforma invoice, not only in the email thread.
- Dimension drawing with shell length, width, height, water depth, access clearances and step arrangement.
- Equipment schedule: pump quantities and duty, jet count and type, filter type, control system, lighting quantity, ozone or UV sterilization.
- Total connected power for the confirmed configuration, plus the supply requirement your electrician must provide on site.
- Insulation package and cover specification if the spa will run in a cool or exposed climate.
- Items explicitly excluded, so nothing arrives as an unexpected variation order.
A manufacturer that works project-to-project will already have this form. Santerson's stated cooperation steps run from project brief and design proposal through quotation and detail confirmation to production, shipment and follow-up, which is the same sequence a swim spa order needs when it is part of a larger villa or hospitality package rather than a standalone purchase.
Screen Three: Project Evidence You Can Actually Inspect
Photographs of a finished spa in a showroom tell you nothing about after-sales reality. Ask each shortlisted manufacturer for three things, and check them rather than accepting them:
- Delivered projects in your region or climate. Request site addresses or client contacts where permitted, and ask what the local conditions were: exposed coastal air, winter operation, rooftop loading, or a restricted access site.
- The same product family, not a similar one. A supplier who shipped only large 8 to 12 metre installations may have little experience with a compact 3.9 metre shell on a tight terrace.
- One documented problem and its resolution. Every factory has had a shipment damaged or a control board replaced. The useful signal is how the claim was handled, in what time frame, and who paid for freight on the replacement part.
Santerson publishes project references including villas in Sydney and Melbourne and housing projects in Willoughby, Perth and North Turramurra. When you review any supplier's portfolio, confirm the scope of each named case before giving it weight: a project page showing cabinetry does not demonstrate swim spa supply, and a listing alone does not establish delivery dates or performance.
Screen Four: Logistics, Installation and What Happens After Handover
A swim spa is heavy, partly electrical, and impossible to correct cheaply once it is on a crane. Ask each candidate how they handle the last kilometre:
- Packaging method and container loading plan for an assembled shell, including who arranges lifting and site placement.
- Export paperwork: commercial invoice, packing list, certificate of origin, and support with import formalities at destination.
- Pre-arrival coordination with your civil and electrical trades: anchor points, slab loading, drainage, isolator location and commissioning sequence.
- Commissioning support, snag inspection, warranty scope, spare-part availability for pumps, jets and control boards, and the response route when something fails in year two.
Santerson states global freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, plus installation, snag inspection, warranty coverage, spare parts and ongoing maintenance. Response times, warranty terms and installer availability differ by destination and should be confirmed in writing for your site before you rely on them.
Scoring the Shortlist
Score every candidate out of five on each line and keep only those above 20. Anything below that is a quotation you should not be spending project time on.
| Criterion | Evidence that scores well |
|---|---|
| Specification accuracy | Restates dimensions, pump and jet counts, lighting quantity and total power for the confirmed variant |
| Configuration transparency | Priced option list with exclusions stated; explains differences between sister variants |
| Manufacturing control | In-house versus bought-in parts named; inspection steps described |
| Comparable project record | Same product family, similar site constraints, contactable reference |
| Delivery and after-sales | Packaging plan, paperwork support, commissioning route, spare-part terms in writing |
Before You Send the Enquiry
Prepare your own sheet first: site photos and access route, target footprint against the 3880 × 2200 × 1250 mm catalogue shell, intended use (lap swimming with a training system, hydrotherapy, or children's play), local power supply, and whether the spa will run year-round. Send that sheet to six manufacturers instead of twenty. The three who return a signed configuration, a dimension drawing and a realistic delivery plan are your shortlist; the rest were never in the running.
To discuss a WS-115AⅩ-U enquiry as part of a villa or hospitality package, including turnkey solutions, custom and OEM service and logistics with door-to-door delivery, contact SANTERSON through the contact page.