Why Interior Doors Are Easy to Under-Specify
Interior doors rarely decide a project's budget, but they decide how finished space reads. A door line that looks correct on a drawing can fail on site because the opening, the wall build-up or the hardware was never confirmed in writing. When a villa, hotel or apartment package is ordered from a one-stop furniture and building materials supplier, doors are one of the few items where an early specification error becomes a site rectification rather than a warehouse swap.
Santerson Decorative Interior Doors sits in the supplier's Interior Doors range, alongside Santerson Flush Interior Doors and Standard Interior Hinged Doors. The published product description is deliberately open: finish, layout and dimensions can be specified per space, with made-to-measure sizing and material and finish options. That flexibility is the commercial advantage and the procurement risk in the same sentence. Everything below is what a buying team should settle before a purchase order is raised.
Risk 1: The Product Name Carries No Technical Commitment
Catalogue titles such as "decorative", "flush" or "handleless" describe appearance, not construction. The Interior Doors pages do not state a core build-up, a face-layer specification, a fire rating or an acoustic rating, and they should not be read as if they did. If your project needs a rated door assembly, treat it as a separate line item with its own evidence.
Before ordering, ask in writing for the leaf construction, frame material, face-layer material and finish system, plus any test report you intend to rely on. If a rating is not needed for the opening, say so explicitly on the schedule so it is not priced in or assumed.
Risk 2: Made-to-Measure Sizing Shifts Measurement Liability Onto the Buyer
Made-to-measure means the supplier builds to the numbers you send. Two openings of the same nominal size can differ by enough to reject a leaf once floor finishes, wall linings and skirting are complete. Confirm who measures, at what construction stage, and against which drawing revision.
- Measure after wet trades and floor finishes. Rough-opening dimensions on a structural drawing are not finished-floor dimensions.
- Record the wall build-up. Concealed and flush details depend on lining thickness, batten depth and the ceiling or reveal condition above the opening.
- Fix one drawing revision. Every schedule should carry the drawing number and revision used for sizing, so a design change is visible instead of silent.
- Allow for site adjustment. Decide in advance which tolerances can be closed on site by the fitter and which cannot.
Risk 3: Hardware Is Often Outside the Door Line You Priced
A door leaf price and a working door set are not the same thing. Handles, hinges or pivot sets, closers, lock bodies, strike plates, floor guides for sliding variants and threshold details each add cost and each needs coordination with the frame. For concealed and handleless work in particular, the hardware choice drives the reveal detail, so it cannot be value-engineered after production starts.
Related ranges on the same site make the coordination point concrete: Santerson Flush Sliding Doors depend on track and floor-guide selection, while Santerson Decorative Concealed Doors and Santerson Handleless Concealed Doors depend on frame and lining detail. Ask whether each quoted line includes leaf, frame, architrave or shadow gap, ironmongery and glazing where relevant, and list what is excluded.
Risk 4: Finish Consistency Across a Mixed Package
Where doors are ordered with cabinetry and wall panelling from the same supplier, teams expect the veneer, lacquer or laminate to match. A door in one batch and a wardrobe or panel in another can read differently under site lighting even when both are correct for their own line. Santerson's Integrated Door & Paneling approach exists precisely to keep door and panel lines in one design and production conversation.
Practical controls: approve a physical finish sample rather than a screen image, order doors and matching panels on the same purchase order where possible, keep a signed-off sample set for snagging, and state the gloss level and grain direction you expect. If the package is split across categories or batches, say which items must match and let production group them.
Risk 5: Packaging, Freight and Storage Damage
Doors are high-value, low-tolerance goods that travel badly when packed as an afterthought. Edge damage, warping from moisture and corner crushing are the usual claims, and most of them are avoidable at the packing stage rather than at the destination.
- Agree the packing method in writing — edge protection, vertical or flat stacking, and moisture barrier for sea freight.
- Label by room and opening number, matching the door schedule, so containers do not have to be opened twice on site.
- Photograph the loaded container before sealing, and record the count against the packing list at receipt.
- Plan storage at destination — flat, dry, off the ground and acclimatised before fitting.
The supplier's service pages describe freight forwarding, customs paperwork, container loading and door-to-door delivery. Those are services to confirm per shipment — Incoterms, insurance cover and who handles customs clearance should be fixed in the contract, not inferred from marketing copy.
Risk 6: Site Sequence and Fitter Access
Flush and concealed doors need a coordinated wall build-up, which means the frame must arrive before linings close. If the joinery package lands after the walls are closed, either the programme slips or the detail is compromised on site. Build the delivery date backwards from the lining date, not from the handover date, and confirm whether installation support is included for your project or whether local fitters work to the supplier's drawings.
Risk 7: After-Sales Terms You Can Actually Enforce
Marketing pages mention warranty coverage, spare parts and response times. What matters commercially is the version of those terms in your contract: what a claim must be raised within, whether replacement covers freight both ways, whether colour or grain variation is excluded, and how a shortage of one leaf is handled when production is already closed. Ask for the written terms before payment milestones are agreed, not after.
A Pre-Order Checklist for Door Packages
| Item to confirm | What "settled" looks like on the schedule |
|---|---|
| Scope per opening | Leaf, frame, architrave or shadow gap, ironmongery, glazing — each marked included or excluded |
| Dimensions and revision | Opening size taken on site at finished floor level, tied to a named drawing revision |
| Construction evidence | Written build-up plus any test report the buyer intends to rely on; ratings stated as required or not required |
| Finish approval | Signed physical sample, gloss level and grain direction recorded |
| Batching | Doors and matching panels on one order where a visual match is required |
| Packing and marking | Packing method agreed; each unit marked with the schedule number for its opening |
| Delivery date logic | Date set against the wall-close or first-fix date, not the practical-completion date |
| Commercial terms | Incoterms, insurance, payment milestones and written warranty terms in one signed document |
Working With a One-Stop Supplier Reduces the Hand-Offs, Not the Paperwork
Ordering doors within a wider package removes several hand-offs between trades and suppliers, which is where most coordination losses occur. It does not remove the need for a door schedule your own team has checked. The teams that get a good result on projects abroad are usually the ones that treat the schedule, the sample sign-off and the freight terms as contract documents rather than correspondence.
If you are assembling a villa or hospitality package, review the Windows & Doors range against the Custom & OEM Service before you lock a schedule, so non-standard sizes and finishes are quoted as engineered items rather than added as variations later.
Send your door schedule, drawing revision and target delivery stage to SANTERSON for a written specification and quotation covering leaf, frame, ironmongery and packing. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com
Product configurations, material and finish options, dimensions and commercial terms are project-specific and must be confirmed with the supplier in writing for each order.