A wardrobe quote is rarely rejected because of price alone. It is usually rejected, or quietly delayed, because the buyer sent a drawing with no dimensions on it, a finish named "matte white", and a note that said "wardrobe, approx. 2.4 m". Two suppliers then quote two different products, and the comparison collapses. What follows is the information set we need to price a custom minimalist bedroom wardrobe properly, and what you should expect back in return.
The short version: send the room dimensions with the obstruction notes, the door type, the internal layout by zone, the board and finish specification, the quantity of each unit, the delivery address and Incoterms, and the installation arrangement. Everything else is negotiable.
1. Room dimensions, including what you cannot see
Overall width, height and depth are the starting point, not the finish line. For a built-in wardrobe the figures that decide the build are:
- Floor-to-ceiling height at three points across the wall, because floors are rarely level and ceilings rarely parallel.
- Wall length measured to the skirting, plus whether the skirting is to be removed or scribed around.
- Depth available, stated separately for the carcass and for the door face, since handles, sliding tracks and hinged swing all consume different amounts.
- Obstructions: power points, switch plates, air-conditioning returns, downlights, radiators, pipework, beams, and the position of the bed door swing.
- Wall construction (timber frame, brick, concrete, plasterboard on battens), which affects fixing method and whether a top panel or scribe piece is needed.
A dimensioned floor plan with the wardrobe wall marked is worth more than a photograph. If you only have a photograph, send it as well, not instead.
2. Door type and opening geometry
The door type drives the price more than almost any other single choice, because it determines the carcass depth, the clearance envelope and the hardware. Specify which you want:
| Door type | What it decides |
|---|---|
| Hinged (swing) | Aisle clearance for the door swing; hinge count and load class; whether handles or a push-open mechanism are used. |
| Sliding | Track depth, overlap between panels, wall space for the panel stack, track quality. See matte sliding door wardrobes and glass sliding door wardrobes. |
| Handleless flat panel | Reveal depth, edge profile, and whether a J-pull or recessed grip is used. See minimalist open wardrobes where no door is required at all. |
| Open / no doors | Panel exposure on both faces, dust expectations, and whether internal finishes must be upgraded to a visible standard. See metal frame open wardrobes. |
| Glass or framed glass | Glass type, tint and safety specification, aluminium frame colour. See minimalist black frame wardrobes and frosted glass wardrobes. |
For a minimalist scheme, state explicitly whether you want the door faces flush with each other and continuous from floor to ceiling, or a visible break at a cabinet line. That single decision changes panel size, joining method and cost.
3. Internal layout by zone, not "as designer"
Internal layout is where quotes diverge most. Give the number of each element and its width:
- Long hanging zones and short hanging zones, with rail heights.
- Drawer count, drawer width, and whether internal dividers or soft-close runners are required.
- Shelf spans, because a wide shelf loaded with folded items deflects; state the load you expect.
- Open display niches, glass-fronted sections, and any lighting inside the carcass.
- Trousers racks, pull-out hampers, jewellery trays, and any recess for an ironing board or vacuum.
If you have a walk-in instead of a built-in, say so and send the layout shape. Our boutique style walk in wardrobes, drawer focused modular wardrobes and L shaped corner wardrobes are priced on different logic from a straight run, and corner units in particular need the return dimension.
4. Materials and finish, stated as specification
"White matte" is not a specification. Name the board substrate, the surface material, and the colour reference:
- Substrate: particleboard, MDF, plywood or solid timber for doors, and which parts you expect each to appear on.
- Surface: melamine, lacquer, acrylic, wood veneer, PVC wrap or a glass panel. Each behaves differently on edges and in high humidity.
- Colour reference: RAL, Pantone, a supplier swatch code, or a physical sample you are prepared to post. Vague adjectives cause the most rework.
- Edge treatment: matching edge band, ABS thickness, or a wrapped mitre on visible edges.
- Internal finish standard: whether interior faces are the same surface as the exterior or a standard white board.
Useful comparisons from our range include matte finish melamine wardrobes, matte acrylic wardrobes, matte lacquer wardrobes and natural oak veneer wardrobes. Tell us the surface you want, not only the look you want.
5. Quantity, project type and schedule
One wardrobe for one bedroom and twelve identical wardrobes for an apartment block are different production runs, with different pricing tiers, packaging and documentation. State:
- Number of units, and how many are identical versus individually sized.
- Project type: single residence, villa, apartment development, hotel or serviced apartment.
- Required on-site date, working backwards to the latest order date, including sampling time.
- Whether a sample unit or finish board is required before full production, and who pays for it.
For multi-unit work, send the unit types rather than every room. Two representative elevations plus a schedule of quantities is usually enough to price accurately.
6. Delivery terms and installation responsibility
The commercial terms belong in the enquiry, not in a later email chain. Include:
| Item to state | Why it matters to the quote |
|---|---|
| Delivery address and access notes | Lift size, stair width and floor level decide whether a wardrobe can be delivered in assembled sections or must be panelised for assembly on site. |
| Incoterms and freight mode | Sea, air and rail change both cost and packaging specification. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork and container loading. |
| Who installs | Your local trades, or our installation and after-sales support. This changes the fixing detail, the labelling system and whether assembly drawings are issued. |
| Payment terms requested | State your standard terms up front so they can be confirmed or countered in one pass rather than three. |
Assembling on site versus delivering assembled sections is the most common late change, and it is expensive to reverse. Decide it before the order.
7. What a complete quote response should contain
You are also assessing the supplier. A usable quotation for custom joinery returns:
- Itemised pricing by unit, with hardware and finishing separated from carcass and doors.
- Shop drawings or elevations showing dimensions, door layout and internal zones.
- A materials schedule naming substrate, surface, edge treatment and hardware brand or grade.
- Packaging description and a loading plan or container estimate.
- Production lead time stated from confirmed drawings, not from the enquiry date.
- Named exclusions: what is not included, and what you would need to arrange separately.
If a quote arrives as a single line total with no drawings, ask for the drawings before comparing it with anyone else's price.
8. Common reasons a wardrobe enquiry stalls
- No ceiling height variation given. A 15 mm discrepancy across a 3 m wall becomes a scribe piece or a re-cut panel.
- Finish named in words only. Two factories read "light oak" completely differently.
- Skirting and architrave left undecided. The panel either sits proud of the wall or requires site trimming.
- Internal layout deferred to production. Drawer counts change after the carcass is cut.
- Delivery assumed, not specified. A truck-sized assembled section cannot reach a fourth-floor apartment.
Each of these is resolved by one line in the original enquiry. Send the details once and the comparison between suppliers becomes meaningful.
Questions buyers ask while preparing the enquiry
Can you quote from a designer's mood board alone?
We can give an indicative range from a mood board, but it will carry caveats because the door type, internal layout and finish are still open. A usable, comparable price needs dimensions and a stated finish reference.
Do you supply wardrobes only, or the rest of the bedroom joinery too?
Both. Wardrobes sit within our interior fixtures range alongside kitchen cabinetry, media walls, shelving and doors, so matching finishes across a bedroom or a whole floor can be produced in one run.
What if the room dimensions come from a drawing rather than a site visit?
Tell us which they are. Drawing-based dimensions work for new builds where the wall will be built to that line; existing rooms need field measurements, because the finished dimension is what the wardrobe has to fit.
Can I see a finish before committing to a full order?
Yes. Ask for a finish board or sample panel in your enquiry and we will confirm what can be produced and issued for approval before production starts.
Send us the specification
SANTERSON is a China-based furniture and building materials manufacturer working on residential, villa and hospitality projects. Wardrobes are made to your dimensions and finish under our custom and OEM service, coordinated through turnkey project delivery from production through to site. Send drawings, a materials schedule and your delivery terms, and you will receive an itemised quotation with shop drawings rather than a single number.
Contact PHILLIP by email at santerson@qq.com or by phone and WhatsApp on +86-13928214007 to start a wardrobe enquiry.