A floating vanity looks simple on a drawing: a box fixed to a wall, a basin on top, a mirror above it. On site it is one of the few bathroom items where the wall, the plumbing, the countertop and the finish all have to agree with each other. That is exactly why buyers who order a made-to-measure unit should spend as much time on the after-sales conversation as they do on the finish sample. This article lists the specific questions worth asking before you place an order for a Santerson Floating Vanity, and what a serious supplier should be able to answer.
Why wall-hung vanities need more after-sales detail than freestanding ones
A floor-standing cabinet carries its own weight, so most of the installation conversation is about levelling and silicone. A wall-hung unit transfers its load, plus the weight of a stone countertop and a ceramic basin, into the substrate behind the tiles. If anything in that chain is wrong — fixing points, an off-set waste, a tap tail that lands two centimetres from where the drawings said it would — the correction happens after the tiles are laid, which is the expensive moment to discover a problem.
Santerson's vanities are configured per project rather than shipped as one fixed size. The catalogue entry for the floating vanity range states made-to-measure sizing, material and finish options, and layouts tailored to the project. Every dimension on your shop drawing is therefore a number you produced together, and the after-sales terms should match that reality: who checks the drawing, who signs it, and what happens if the delivered unit does not agree with the signed sheet.
The support scope Santerson publishes
Before asking for extras, it helps to know what is already on the table. The company's Furniture Installation and After-sales Support page lists on-site installation, inspection and snag resolution, warranty coverage, spare parts and replacement, and ongoing maintenance. The wider service path runs from design consultation and space planning through material selection, manufacturing and quality control, project management, and finally installation and handover, with freight by sea, air and rail and door-to-door delivery in between.
Those are the categories to interrogate. Response times, what a warranty covers on a bathroom cabinet that sits in a humid room, and which spare parts stay available years after handover are the details that decide whether the service is useful when you actually need it.
Questions to ask before the order
1. What exactly arrives on the pallet?
- Is the basin or integrated countertop shipped with the cabinet, loose in the same crate, or ordered separately from a different line?
- Are wall fixings, brackets and the hanging rail included, or do you buy them locally to match your wall build-up?
- Are tapware, waste, trap and the flexible connectors supplied, or excluded by default?
- Is Vanity Lighting ordered in the same batch, with matching finish codes, or does it arrive on a separate consignment?
Ask for a written packing list per item before production starts. Buyers who discover at delivery that the countertop travels separately often lose two weeks waiting for a second container and cannot close the wall in the meantime.
2. Who signs off the fixing method?
- Ask what the supplier needs from you: substrate type, cavity depth, tile build-up, and the finished floor level.
- Ask them to return a setting-out drawing showing the hanging line, waste position, tap tail positions and clearances.
- Confirm in writing which party verifies those dimensions on site before manufacture begins.
For tiled bathrooms this single sheet is the difference between a clean install and a chase cut into new tile. If your wall is stud, brick or concrete, say so — the fixing detail changes with each.
3. What does the warranty actually cover on a bathroom cabinet?
- Cabinet carcass and doors versus finish and edge banding: are they under the same term?
- What is excluded around water exposure — standing water at the basin seam, steam-heavy showers without extraction, outdoor or semi-outdoor bathrooms.
- Whether a supplier-fitted countertop and basin are covered together with the cabinet, or each under its own terms.
- How a claim is raised from your country: photographs, an agreed inspector, or return of the part.
4. How are snags handled on delivery day?
Ask what the inspection step looks like in practice. Is there a documented checklist at handover, who signs it, and how long do you have to report hidden damage after the crates leave? For shipped joinery, transit damage is normally found when the packaging is opened, so a short reporting window on your side and a clear photo protocol on theirs protect both parties.
5. Can you still get parts in three years?
- Replacement doors, drawer fronts, handles and hanging hardware for the specific configuration you ordered.
- Whether a colour-matched touch-up or replacement panel is available for the finish code you chose.
- The cost and lead time of a small replacement shipment, since one door rarely justifies a container.
Hotels, serviced apartments and multi-unit villa projects should ask this last question first. A handover that looks perfect in year one is judged on how easily the maintenance team fixes a damaged door in year four.
A practical record to keep
| Document | Why it matters after handover |
|---|---|
| Signed shop drawing with all dimensions and finish codes | The reference point for any claim about size, layout or colour. |
| Packing list per crate | Shows what was supplied, so missing parts are provable. |
| Installation instruction sheet for the wall-hung system | Hands to your tiler and plumber before the wall is closed. |
| Written warranty terms and claim route | Tells the maintenance team who to contact and with what evidence. |
| Spare-parts list with codes | Makes a small reorder possible years later. |
Ask for everything above in writing before production is released. A supplier who works to made-to-measure drawings should have no difficulty confirming them; hesitation at that stage tells you more than any brochure.
Matching the rest of the bathroom to the same service path
Most buyers order the floating vanity as part of a wider fit-out. When ceramics, shower fittings, Bathroom Sanitary Fixtures, storage and finishes come from one supplier under one project manager, you get a single snag list at handover instead of five competing ones. Santerson's range spans vanities, basins and showers alongside lighting, wall panels, ceilings, cabinetry and flooring, with one-stop furniture and building materials supply covering design consultation through installation. For a project already working with Australian villa and hotel references, that single point of contact is where after-sales support either holds together or falls apart between contracts.
Frequently asked questions
Can the floating vanity be resized to an existing niche?
Yes. The range is configured with made-to-measure sizing and project-tailored layouts, so width, depth and internal arrangement follow your space. Confirm the finished wall face and floor level before the drawing is released.
Does Santerson install on site?
On-site installation, inspection and snag resolution are listed services. Ask which crew covers your location and what the visit includes, so you know whether your local plumber still needs to connect the waste and supplies.
What if a part is damaged after handover?
Spare parts and replacement, plus ongoing maintenance, are named services. Keep the finish codes and configuration sheet so a replacement matches what was installed.
Before you commit to a floating vanity for a residential or hospitality project, send your layout and ask for a setting-out drawing, a packing list, written warranty terms and a spare-parts schedule. Those four documents answer more after-sales questions than any product page. Start the conversation through the contact page.