A swim spa quote is easy to compare on one number and hard to compare on the things that actually cost money later. If you are evaluating a supplier for the Outdoor Swim Spa WS-PC08U, use the checklist below line by line before you sign, so that what arrives on site matches what your project drawings assumed.
Start with the shell dimensions as installed, not as marketed
The catalogue entry for this model lists 8000 × 3000 × 1500 mm. Ask the supplier to restate those figures in the quotation itself, and to say which dimension is internal water depth versus overall height, because that single line drives your foundation recess, the finished deck level, access for delivery, and whether the unit can be lifted or craned into position.
Two checks here save weeks of rework: confirm the footprint including any steps, plant cabinet or equipment compartment, and confirm the shipping form. A spa shipped as one assembled shell needs a different site access plan from a panelised unit assembled on site.
Read the pump and jet schedule, not the jet count alone
The published specification for this model shows 4 water pumps, 1 filter pump, 33 jets in total, 1 LED light and a control system counted as 1 set. A supplier who quotes only "33 jets" has not told you enough. Ask them to itemise:
- the number and duty of water pumps, and which jet zones each one serves;
- the filter pump flow rate and the filtration cycle the system is set for;
- jet types and where they are positioned in the shell;
- how many control stations you get, and where they are mounted.
Two quotations with identical jet counts can perform very differently once pump duty and zoning differ. Itemising turns a marketing number into something you can compare.
Confirm the electrical load at your site's supply
The catalogue lists total power for this configuration as 11.85 kW. That figure is the starting point for an electrical conversation, not the end of it. Have the supplier state, in writing:
- the total connected load and the supply voltage and phase arrangement the unit is built for;
- whether the heat pump, if selected, is inside that figure or additional to it;
- the recommended breaker size, cable size and dedicated circuit requirements;
- who supplies and installs the isolator, protection device and final wiring run.
Have your local electrician review this section against the supply available at the site before you accept the quotation. Electrical scope that is left out of a factory price is the most common surprise on a swim spa project.
Separate standard equipment from options
The features shown for this model are water jets, LED lighting and ozone treatment. The catalogue also lists optional accessories across the range: additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs to be priced as a named line on your quotation rather than described in a covering email.
Put the whole delivery chain in writing
SANTERSON describes turnkey service from design and production through logistics and door-to-door delivery, with freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For a swim spa, each of those items has a cost consequence you want fixed before order confirmation:
- the Incoterms and what the quoted price includes up to your site;
- packing method, container type and how the shell is protected in transit;
- which documents the supplier provides, such as commercial invoice, packing list and certificate of origin;
- who handles import clearance at destination and who pays duties;
- whether cargo insurance is included or offered as an option.
Import terms, duties and transit arrangements are settled case by case for each destination, so treat the delivered price as a project-specific figure rather than a catalogue number.
Check installation and after-sales scope against your drawings
The services page describes on-site installation support, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Ask which of those apply to this order, what the warranty covers for shell, pumps, controls and lighting respectively, and how spare parts are supplied once the unit is in service. Also confirm whether site guidance is remote or on location, and who prepares the foundation and deck.
How the specification should appear on paper
| Quotation line | What a usable quotation states |
|---|---|
| Model and configuration | WS-PC08U plus the exact option set, each as its own priced line |
| Dimensions | Overall length, width and height, and internal water depth, in millimetres |
| Hydraulics | Pump quantity and duty, filter pump flow, jet count with zoning |
| Electrical | Total connected load, supply requirements, items excluded from that load |
| Treatment | Ozone as standard; UV sterilisation priced separately if required |
| Delivery | Incoterms, packing, container plan, documents supplied, insurance status |
| After-sales | Warranty split by component group, spare parts route, support scope |
Match the spa to the wider outdoor package
A swim spa is rarely procured alone. Poolside loungers, shade structures and adjacent patio seating are usually on the same purchase window, and coordinating them with one supplier reduces interface problems between trades. If your layout needs a non-standard footprint, customizable shape outdoor spa options cover square, round, oval and curved designs in an acrylic shell with structural reinforcement for gardens, terraces and leisure areas. Browsing the full swimming pools and swim spas range alongside it lets you compare footprints before you commit to one model.
Before you sign: a short version of the check
- Installed footprint and depth restated on the quotation, including steps and plant space.
- Pumps itemised by duty and zoning, not just a jet count.
- Total connected load stated, with exclusions named and your electrician's review recorded.
- Every option priced as its own line, so nothing is assumed standard.
- Incoterms, packing, documents, clearance responsibility and insurance all fixed in writing.
- Warranty terms split by shell, pumps, controls and lighting, with the spare parts route defined.
Send your configuration for a line-by-line review
Share the site drawing, your available supply and the option list you want, and we will return a quotation written so each of the checks above can be answered from the document itself: production, custom and OEM service where dimensions need changing, and coordination with the rest of your outdoor package through to installation and after-sales support.