A quote for metallic lacquer cabinets often arrives as a single line: "1 set, made to measure, metallic finish." That one line can stand for very different scopes from different factories. Before you sign anything, work through the checklist below. It is written for buyers ordering custom cabinetry for villas, serviced apartments and hotel fit-outs, where the cabinets are built to project dimensions rather than picked off a shelf.
Why metallic lacquer needs a more detailed quote than a standard finish
Lacquer is a sprayed, cured paint system built up in layers over a prepared panel. A metallic version adds metal flakes to the colour coat, which makes the finish far less forgiving than a laminate or a foil-wrapped door. Two things follow from that, and both should show up as separate items on your quotation.
First, direction. Metallic lacquers read differently depending on which way the light travels across the door. A quote that says only "metallic grey" does not tell you whether all doors are laid out in one direction. Second, batch consistency. Panels sprayed in different batches, or on different days, can drift slightly in tone and in how bright the metallic fleck looks. That is why our Metallic Lacquer Cabinets are quoted per project: finish, layout and dimensions are specified for each space before production starts.
Item 1: The finish schedule, not the finish name
Ask for the finish to be written out as a build-up, and check that each layer is named on the quote. A usable entry reads something like: substrate and edge treatment, primer coats, colour coat with metallic effect, top coat, gloss level, and colour reference.
- Gloss level in numbers. "High gloss" means different things between factories. Ask for a gloss range and write it into the order.
- A physical colour reference. A signed sample panel, or a recognised colour code, beats a photograph. Screens shift; sprayed panels do not.
- Grain or fleck direction. State on the drawing which way each door is laid out, including doors cut from the same batch.
- Edge treatment. Spray coverage on edges and drilled holes is where cheap quotes save money and where complaints start later.
Item 2: Substrate and carcass, stated separately from the door
The finish sits on a board, and the board determines how the cabinet behaves in a humid kitchen. Quote lines should name the door substrate and the carcass material separately, with panel thickness for each. Also ask how the back panel is fixed and whether the material specification differs between tall units, wall units and base units.
Item 3: What the price actually includes
This is where quotations for the same kitchen differ most. Go through the table and make sure every supplier has priced the same scope.
| Line item | What to confirm on the quote |
|---|---|
| Doors, drawers and carcass | Whether tall units, panelling, trims and scribe pieces are included or listed as extras. |
| Worktop | Material, thickness, edge profile, cut-outs for sink and hob, and whether templating is on site or from drawings. |
| Hardware | Hinge and runner brand and model, soft-close or push-to-open, handleless profile or handle, load rating. |
| Integrated lighting | Profile type, driver location, cable runs and who supplies the transformer. |
| Appliances and sinks | Usually excluded. Confirm in writing so cut-outs are still made to the right sizes. |
| Packaging | Individual wrapping of sprayed doors, corner protection, and whether panels travel flat or assembled. |
| Freight and duties | Which Incoterm applies, and whether delivery is to port or to the site door. |
| Installation and snagging | Who fits on site, who adjusts doors after fitting, and what counts as a completed job. |
If you are sourcing cabinets inside a wider package of joinery, wardrobes and wall finishes, ask for one quotation with the scope split by room. A single number for "all cabinetry" makes it impossible to compare two suppliers fairly, and it hides what changes when you delete one item.
Item 4: Dimensions, drawings and tolerances
Made-to-measure only means something if the measurements are recorded. The quote should attach dimensioned drawings with elevations for every wall, and it should say whose measurements govern: the site survey or the architect's drawings. Then check three details that cause most on-site problems.
- Floor and ceiling level. Older villas and renovated apartments are rarely level. Ask how out-of-level is absorbed, by scribing, adjustable legs or site packing.
- Service clearances. Ventilation gaps for ovens, space for plumbing behind base units, and where the extractor duct turns.
- Interface with other trades. State who finishes the wall behind tall units, who supplies the skirt behind the worktop, and where the tiling stops.
Item 5: Lead time, sampling and what happens if a panel is damaged
Ask for the lead time to be broken into stages rather than given as one figure: drawing confirmation, sample approval, production, inspection, packing, transit. Sprayed panels need preparation and curing time between coats, so ask each stage separately instead of accepting one total.
Then settle the replacement clause before you pay. Sprayed panels are the part most likely to be scratched in transit or on site, and a replacement is a fresh spray run rather than a shelf swap. The quote should state how a damaged or wrong panel is re-manufactured, what it costs if the fault is not yours, and how the replacement travels.
Item 6: After-sales terms in writing
Ask which parts are covered, for how long, and what voids the cover. Cleaning agents matter for metallic lacquer: abrasive pads and strong degreasers dull the top coat, so written care guidance is worth more than a longer cover period with no instructions. Also confirm who handles snags after installation and how spare parts such as doors and drawer fronts are ordered later.
A short comparison sheet before you choose
Put every quote into the same grid: finish build-up, substrate, hardware brand, worktop, lighting, packaging, Incoterm, installation, replacement clause. Prices that look close at the top of a quotation often separate by a wide margin once these lines are filled in.
If you want a worked example of what our quotations include, browse the custom kitchen cabinets range on our site, or send us drawings and a room list. We quote finish build-up, substrate and hardware line by line, so you can put two quotations side by side and see the difference.