A bouclé outdoor sectional with a marble top coffee table reads as one piece on a mood board. In a purchase order it is a set of frames, cushion cores, fabric rolls, stone slabs and clearances that must all agree. This guide lists the measurements and project inputs a specifier actually needs to send, so the quotation comes back matching the drawing rather than approximating it.

Start With the Space, Not the Sofa

The first number is not the length of a sofa. It is the shape of the area the lounge has to sit in: terrace, pool deck, rooftop, courtyard or garden lawn at a resort. For the Bouclé Fabric Outdoor Sectional Sofa Set with Marble Coffee Table, the rounded silhouette matters most, because curved seating behaves differently from a straight sofa when it is fitted into corners and against balustrades.

Send these space dimensions before anything else:

  • The outline of the usable area in metres or feet, including the position of planters, steps, drainage channels and any fixed furniture already on site.
  • Clear walking gaps. A lounge set that fills a terrace with 200 mm left to walk through will be rejected at handover; state the minimum circulation width your design standard requires.
  • The path the pieces travel from the delivery vehicle to the final position — gate widths, lift car dimensions, stair turns, and whether a crane or hoist is available on upper terraces.
  • Whether the surface is finished timber, stone pavers, tile, concrete or grass, because that decides levelling feet, protective pads and how much point load the marble base transfers.

The Set Layout: Which Modules, and How Many

Sectional sets are quoted module by module. Confirm the seat count per side, whether corner units sit at 90 degrees or follow a curve, and whether the arrangement is an L-shape, U-shape or a free-standing curved group around one coffee table. If your project uses more than one lounge grouping — say a poolside cluster and a separate terrace cluster — list them separately rather than as one quantity, since fabric colour and cushion counts often differ between zones.

For projects where the bouclé look continues indoors, matching pieces are usually specified at the same time. Indoor Large L Shape Bouclé Modular Sectional Sofa units and a Custom Curved Bouclé Modular Sofa Set let the interior lounge and the terrace read as one design language, which is common in villa and penthouse packages.

Measurements That Decide the Seat Itself

InputWhat to specifyWhy it changes the build
Overall width and depth of each moduleTarget maximum envelope per piece, plus the total run of the arrangementGoverns transport size and whether a module can pass through your access route
Seat height and seat depthPreferred range for adult seating at your venueA low, deep lounge profile suits pool decks; a firmer, higher seat suits dining-adjacent terraces
Back height and arm radiusLow back or high back; the sweep of the rounded armAffects sightlines across the terrace and how the set reads against a parapet
Cushion thickness and core typeSeat and back cushion depth, firmness preferenceThicker cores change seat height and how quickly the profile softens in use
Coffee table diameter and top heightRound tabletop size relative to the sofa seat heightA coffee table too high or too low for the seat makes the set uncomfortable in practice
Number of pieces per shipmentPieces, carton footprint and total weight per consignmentDetermines container loading and whether split shipments are needed

Where the set sits beside a pool or on an exposed terrace, ask for the frame finish specification in writing — powder coating colour code for metal parts, and the fastener and levelling details at the base. The Curved Outdoor Sofa Set with Marble Coffee Table listing describes an anti-rust powder coated frame with outdoor-grade performance fabric, which is the kind of construction detail worth repeating in your own specification sheet so alternatives are compared on the same basis.

Fabric and Stone: Inputs That Must Be Named, Not Described

Bouclé upholstery

"Bouclé" describes a looped texture, not a performance grade. For an outdoor set, send the following with your enquiry:

  • The colour reference — a physical swatch number or a named tone, not a photograph on a screen.
  • Whether the same fabric is used for seat cushions, back cushions and loose accent pillows, or whether accent pillows are a contrasting cloth.
  • Whether cushion covers are removable for laundering, and how many spare covers you want in the order.
  • The exposure condition: full sun all day, shaded by a pergola, covered by an umbrella, or under a roof overhang. This drives fabric selection far more than the aesthetic choice does.

If your project also needs bouclé at the dining table, the Marble Top Outdoor Dining Set with Bouclé Dining Chairs lets the same cloth and stone palette be carried through from lounge to outdoor dining.

The marble coffee table top

Stone is where specifications go wrong most often, because "marble" covers a wide range of veining and hardness. Specify:

  • The stone type or slab reference you want, with the surface finish — honed or polished.
  • Edge profile and top thickness.
  • Whether the veining direction matters for how the table faces the main view.
  • Sealing expectations and who performs sealing on site, since stone is usually sealed before or after installation rather than at the factory in every case.
  • Acceptable variation. Natural marble varies slab to slab; agree in writing what deviation from the sample is acceptable before production starts.
A practical note on stone outdoors. A marble top on an uncovered terrace is a different proposition from one under a roof or inside a covered loggia. State the exposure condition and ask which tops are suitable for that position; if your site is fully exposed, request the alternative surface options offered for the same table design before you lock the specification.

Project Inputs Behind the Quotation

Beyond dimensions, four sets of project information determine whether a quotation can be produced at all:

  • Quantity and phasing. How many sets, how many rooms or terraces per type, and whether delivery is one drop or staged by handover phase.
  • Custom scope. Which dimensions, fabric colours and stone options must be changed from the standard listing. Custom and OEM work covers bespoke finishes and prototyping, so state clearly which items are standard and which are modified.
  • Destination and delivery terms. The site address, port or door, and who handles import clearance. Door-to-door logistics services cover freight by sea, air and rail plus the paperwork, but you still need to confirm Incoterms and duties for your own project.
  • Site readiness dates. When the terrace will be waterproofed, paved and furnished-ready, so installation is not scheduled onto an unfinished surface.

A Simple Specification Sheet to Send

Copy this structure into your own document and fill it in before you send an enquiry. A complete sheet usually returns a usable quotation; an incomplete one returns a range that has to be reworked.

FieldYour entry
Project type and locationVilla, boutique hotel, resort; city and site exposure
Reference productProduct name plus the page URL you are enquiring about
Set configurationModule list, seat count, arrangement drawing or sketch with dimensions
Envelope limitsMaximum overall width, depth and height permitted in the space
Cushion specificationFabric reference, colour, core firmness, removable covers yes/no
Coffee tableStone type, finish, edge profile, diameter, top height
Frame finishColour code for metal parts; any teak or wood accent detail
Quantities and phasingSets per zone, total pieces, required delivery windows
Access routeLift dimensions, gate widths, stair turns, hoist availability
Delivery termsShip-to address, Incoterms, who clears customs
Sample requirementsFabric swatches and stone sample needed before production — yes/no

Coordination Through the Same Supplier

Terrace furniture rarely stands alone in a villa or hospitality package. When the same supplier handles turnkey project furnishing, the outdoor lounge, the indoor seating, pergolas and shade structures, lighting and paving-adjacent finishes are coordinated against one drawing set and one delivery schedule. The interior design service covers furniture layouts and 3D renderings for indoor and outdoor schemes, which is where the sectional's clearances can be checked against your plans before anything enters production.

Ask at the same stage who supervises installation and how snags are recorded at handover. Outdoor sets assembled on site need levelling checks on paved surfaces and a cushion-by-cushion inspection, and it should be clear from the order documents whose responsibility that is.

Send your measurements with the enquiry

Include the space outline, module list, fabric reference and stone specification for the lounge you are designing. SANTERSON manufactures outdoor sectional sets to project dimensions, with custom upholstery, marble options and configuration supported for hospitality and villa enquiries.

Contact the project team to start a quotation.