A swim spa on a hotel terrace or in a villa garden has to work two ways at once: it is fitness equipment for the guest who swims laps at six in the morning, and it is hydrotherapy for the guest who soaks after a long flight. The Outdoor Swim Spa WS-S10-T sits deliberately between those two briefs. Below is how we specify it on real projects, and the questions a procurement team should settle before the model goes on a purchase order.
What the WS-S10-T actually is
The WS-S10-T is a long, narrow shell built for lap swimming as well as massage. The catalogue dimensions are 10000 × 2200 × 1420 mm — a ten-metre water column in a footprint barely wider than a double bed, which is what lets it sit along the edge of a terrace or in a villa side garden where a full swimming pool would swallow the plot. The captured specification sheet lists 76 jets in total, two water pumps and one filter pump, one main LED light plus 40 small LED lights, ozone sanitation, a swim training system and one control system, with total power shown as 7.65 kW.
Read those numbers as catalogue figures for the standard configuration, not as a fixed promise. Options such as UV sterilisation, an additional water pump, a heat pump, sand filtration, extra insulation and entry steps change both the equipment list and the connected load, so the final specification is confirmed with us per project.
When a hotel or villa project should choose this model
The length is the deciding factor. Ten metres of continuous water lets an adult swim against the current of the swim training system without stopping every few strokes, which matters if your property markets fitness facilities to long-stay guests, business travellers or residents who train. The jet array along the same shell then serves a second audience: two or three people can use the massage section while one person swims.
- Boutique hotels and resorts with limited outdoor area. A linear spa placed against a parapet or boundary wall delivers a wellness story without consuming garden space needed for F&B seating.
- Villas with a long, narrow plot. Where the site cannot carry an in-ground pool, this format gives residents a swim lane and a spa in one excavation-free installation.
- Properties that want year-round use. A heated, insulated shell with ozone sanitation runs outside the summer season, so the amenity is not left idle for part of the year.
Where the model is the wrong answer: a resort whose pool deck already carries a large freeform pool and needs only an adults' spa; or a family scheme where young children will use the water, since 1420 mm of depth and a swim current call for supervised-use planning and barriers that meet your local requirements. In those cases a shorter unit from the same range usually fits better.
How it compares with neighbouring models
The most useful comparison inside our own catalogue is between the WS-S10 and the WS-S10-T. Both shells share the 10000 × 2200 × 1420 mm dimensions, the same pump arrangement, the same jet count and the same listed power figure. The difference sits in the fitted equipment: the -T version's captured specification includes a swim training system, while the standard WS-S10 record shows water jets, LED lighting and ozone without that item listed. If lap swimming against a current is part of your guest offer or your residents' brief, specify the -T. If the amenity is purely soaking and massage, check the standard version's equipment schedule with us before ordering.
For projects needing a longer water column, the WS-S12-T stretches the same layout to 11740 × 2200 × 1470 mm and keeps the swim training system, with its own jet and lighting counts listed separately. Compare shells on footprint first, then on fitted equipment.
| Model | Catalogue dimensions (mm) | Feature set shown in the catalogue | Typical project use |
|---|---|---|---|
| Outdoor Swim Spa WS-S10 | 10000 × 2200 × 1420 | Water jets, LED lighting, ozone | Villa and hotel spa use where lap swimming is not the brief |
| Outdoor Swim Spa WS-S10-T | 10000 × 2200 × 1420 | Water jets, LED lighting, ozone, swim training system | Fitness-led hotels, long-stay residences, villas with narrow plots |
| Outdoor Swim Spa WS-S12-T | 11740 × 2200 × 1470 | Water jets, LED lighting, ozone, swim training system | Larger resorts and villas with generous terraces that need extra water length |
The six decisions to close before you order
- Configuration. Fix the options list — heat pump or not, UV sterilisation, sand filtration, insulation grade, steps — and get the resulting equipment schedule in writing. Jet count, pump set and connected load all move with the option set.
- Electrical capacity. The catalogue shows 7.65 kW total power for the standard build. Your engineer must confirm supply capacity, protection and earthing at the actual installation point, to the local code that governs your site. We do not certify compliance for a jurisdiction we have not been shown.
- Structural support. On an upper-level terrace, the slab and its bearings need checking by your structural engineer for filled-shell loads plus people. Ground-level installations need a level, drained base.
- Access and delivery route. A ten-metre shell has to reach its position. Confirm crane access, gate widths and lift capacity in the site logistics plan before shipping, not on arrival day.
- Water treatment duty cycle. Ozone handles sanitisation; a hotel still needs an operating protocol for filtration hours, water testing and disposal of backwash water, agreed with your facilities team.
- Maintenance ownership. Decide who services pumps, filters and controls after handover, and what spare parts you keep on site.
Ordering it as part of a wider package
Swim spas rarely arrive alone. On hospitality and villa projects they usually sit in the same procurement lot as swimming pools and swim spas, poolside loungers and outdoor seating, wall and ceiling finishes around the deck, lighting, and bathroom fixtures for adjacent changing rooms. Sourcing those through one supplier means one production schedule, one consolidated shipment and one point of contact for snags — which is how our interior design services team handles the pool zone from layout drawings through to site coordination.
As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects worldwide, we handle custom and OEM work, door-to-door logistics, installation support and after-sales service for the full package rather than for the spa in isolation.