A Two Tone Lacquer Wardrobes submittal is the pack of drawings, finishes and specifications that a buyer, designer or contractor signs off before the first panel is cut. For made-to-measure built-in joinery, most disputes that appear on site — wrong shade, wrong opening direction, carcass that does not meet the floor level — were already visible in an incomplete submittal. Below is the checklist we work to when a wardrobe package goes out for approval.

1. Drawings that fix the geometry

Two-tone wardrobes depend on exact proportions: where the light tone ends and the dark tone begins, and how that line relates to ceiling height, skirting and adjacent joinery. Ask for drawings at a legible scale, not a single perspective render.

  • Elevations of each wardrobe run, with overall width and height dimensions marked on every face.
  • A plan showing carcass depth, door swing or sliding clearance, and how the unit meets walls, corners and architraves.
  • Interior elevation with shelf, hanging-rail and drawer positions, so storage layout is approved at the same time as appearance.
  • Section detail at the ceiling line and floor line, including scribe, plinth or shadow gap treatment.

Because these wardrobes are made to measure rather than supplied in fixed modules, the drawing set is also the record of what was ordered. Confirm the dimensions on the drawing against the site survey before returning approval.

2. Finish schedule for both tones

A two-tone scheme can fail on one detail: the two surfaces were approved separately and never seen together. The submittal should name each tone, its sheen level and the substrate it is applied to.

ItemWhat to confirm in the submittal
Tone A / Tone B assignmentWhich panels carry which colour — doors, carcass exterior, interior boxes, plinth.
Sheen levelHigh gloss or matte for each surface. Compare High Gloss Lacquer Wardrobes and Matte Lacquer Wardrobes against the same room light before deciding.
Reference methodThe colour reference used for approval — physical sample panel or a stated finish code. Screens do not represent lacquer sheen reliably.
Edge and handle treatmentEdge banding or lacquered edges, handleless groove or applied pull, and which tone the hardware belongs to.
Sample sign-offWho signs the sample panel, and how the signed panel is stored for delivery comparison.

Request one physical sample board carrying both tones side by side. That single item settles most arguments about contrast, warmth and reflection later in the project.

3. Materials and construction specification

State what the carcass, doors and back panels are made of, and how they are assembled. The product page for this collection lists made-to-measure sizing, material and finish options, and a layout tailored to the project — so the specification you receive should be specific to your job, not a generic brochure sheet.

  • Door panel construction and substrate, with the lacquer build-up described in layers.
  • Carcass material and thickness, plus edge treatment on all visible faces.
  • Hinges, slides, lifts and their make and load rating, matched to door height and weight.
  • Back panel thickness and fixing method, which affects how the unit squares up on an uneven wall.
  • Interior fittings — rail heights, soft-close hardware, drawer runners, integrated lighting if specified.

4. Site conditions and interfaces

Joinery is only as good as the opening it drops into. The submittal should record who prepares what, so nothing is assumed by both parties — or by neither.

  • Floor and ceiling levels, and whether packing or scribing is allowed to take up variation.
  • Position of electrical outlets, switches and lighting that must not be trapped behind a carcass.
  • Relationship to flooring, wall panels and Matte Lacquer Panels or other matching joinery in the same room.
  • Access route for delivery: lift size, stair width, corridor turns, and packaging dimensions.

5. Commercial and project information

Keep the commercial terms in the same pack so approval is a single event rather than a chain of emails.

  • Pack list with item codes and quantities, so each wardrobe run can be checked on arrival.
  • Production sequence and delivery window, staged if other trades depend on installation.
  • Who handles installation and who prepares the site for it.
  • The revision record: drawing number, date and what changed at each issue.

Before you approve: a short pre-production check

  • Both tones named, with sheen level stated for each surface.
  • Physical two-tone sample panel signed and dated.
  • Elevations, plan, interior layout and ceiling/floor sections all present.
  • Survey dimensions confirmed against the drawings, not the reverse.
  • Hardware makes and load ratings listed against door sizes.
  • Site interfaces — levels, electrical, flooring, delivery route — assigned to a named party.
  • Drawing revision number quoted on the purchase confirmation.
A practical rule: if the submittal does not let a site supervisor install the wardrobe without phoning the office, it is not complete yet. Every dimension, tone and interface should be readable from the pack.

SANTERSON supplies lacquer wardrobes as made-to-measure built-in furniture within a wider package of cabinetry, joinery and interior fixtures for villa and hospitality projects. Send us your drawings or a room survey and we will return a submittal set covering the items above for your review before production.