A compact acrylic swim spa can be quoted three different ways by three different factories, and only one of those quotes will match the pool you actually picture on your terrace. The difference is almost never price. It is how precisely the buyer stated what had to arrive on site. If you are specifying Outdoor Swim Spa WS-S38 for a villa garden, a resort terrace or a private wellness corner, the brief you send decides whether the supplier replies with a comparable configuration or with an approximation.

This guide walks through the information a manufacturer needs for this model, what each item changes in the quotation, and how to read the answers side by side. It is written for buyers who order once or twice a year and do not want to spend that order learning the vocabulary.

Start With the Space, Not the Model Number

Model numbers describe a shell. Your site describes the constraints. Before you write a single line about jets or lighting, send the manufacturer four facts about where the unit is going:

  • Footprint available. The catalog lists this model at 3760 mm long by 2080 mm wide and 1110 mm high. Give the clear opening on site in the same unit, plus whatever clearance a crane or forklift needs to reach it.
  • Support condition. Is the spa sitting on a reinforced slab, a timber deck, a podium, or a sunken pit with an access hatch? A load path changes the reinforcement and therefore the price.
  • Distance from the nearest electrical panel. The catalog lists total power for this configuration at 14.05 kW. Your electrician needs that number before they quote cable, protection and any supply upgrade.
  • Exposure. Coastal salt air, full sun, frost, or an indoor plant room. These conditions change which finishes, insulation and control components make sense.

A brief that opens with the site reads as a project. A brief that opens with "price for WS-S38" reads as a commodity enquiry, and commodity enquiries get commodity answers.

What the Catalog Already Fixes for WS-S38

Useful as a starting point, the published specification for this model gives you a baseline to write against. Treat it as the reference configuration, not as a delivered guarantee:

ItemCatalog value
ModelWS-S38
Dimensions3760 x 2080 x 1110 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jets51 pcs, plus 6 water columns
Lighting4 LED lights, 12 small LED lights
Total power14.05 kW
Features shownWater jets, LED lighting, Ozone, Waterfall
Swim training systemNot listed for this model

Two lines in that table deserve attention before you send anything. First, the swim training system is not listed for WS-S38; if your client expects a counter-current swim station, ask explicitly whether one can be added to this shell and what it does to length, power draw and cost. Second, every figure above belongs to the catalog configuration. Ask for the specification of the unit you are being quoted, line by line, so you are comparing two real builds rather than two marketing sheets.

A short rule: never accept a quotation that names the model but not the equipment list. A model name covers a range of build options, and the gap between them is where budget surprises live.

The Eight Questions That Decide the Quote

Send these as numbered questions. Numbered replies are easy to compare across suppliers; paragraph replies are not.

1. Which pumps, and for what duty?

Three water pumps and one filter pump appear in the catalog entry. Ask for pump make, model, flow rate and head, and ask which pump drives the jets, which drives the water columns and which runs the filtration cycle. Pump selection governs how the massage actually feels and what the unit draws when everything is running at once.

2. Jet layout, not just jet count

Fifty-one jets in a shell just over 3.7 m long means position matters more than quantity. Ask for a jet map with seat positions marked, and say which body zones your users care about: shoulders and upper back for people who sit in the spa reading or working, hips and calves after sport, soles and lower back for older users. A manufacturer who supplies a jet map is showing you the engineering; one who only repeats the count is selling a number.

3. Heating method and expected running cost

State whether you want electric heating, a heat pump, or both with a changeover. Heat pumps cost more to buy and less to run in mild climates; direct electric heating is simpler and heavier on electricity. Ask the supplier for the heater capacity in the quoted build and for guidance on insulation, so your operating estimate rests on their data rather than on a guess.

4. Water treatment

Ozone appears in the catalog configuration. Ask whether ozone is included or optional, what sanitising step it works alongside, and how UV sterilization is quoted if you want it. For a shared or commercial setting, ask what maintenance interval the recommended system assumes.

5. Filtration type

The catalog lists sand filtration among available options alongside cartridge-style arrangements. Ask which one is quoted, how often the media needs cleaning in your usage pattern, and where the filter sits relative to an access hatch. A filter you cannot reach is a filter that does not get cleaned.

6. Insulation and cover

For cool-climate or night-time use, insulation and an insulating cover determine how much of your heat stays in the water. Ask what insulation is applied to the shell and cabinet, its thickness, and whether a cover is included, optional, or supplied locally.

7. Controls and user interface

One control set is listed. Ask where the panel is mounted, whether it is readable in direct sun and at night, what happens after a power cut, and whether temperature can be scheduled rather than held constantly. Small usability points like these decide whether a spa gets used daily or admired occasionally.

8. Access, delivery and site handover

Ask how the unit reaches your site: one piece or sections, what lifting gear is required, and who arranges it. Then ask what arrives with it: plumbing connection details, electrical single-line diagram, warranty terms, spare-parts availability, and who supports commissioning. SANTERSON lists logistics and door-to-door delivery covering sea, air and rail freight with customs paperwork and container loading, plus installation and after-sales support. Ask for the scope in writing for your specific address and confirm duties, Incoterms and transit terms case by case.

Describe the Users, Not Just the Room

Buyers describe the setting and forget the people. Add one short paragraph answering: who uses it, how often, and for what. A family with two teenagers who want to swim against a current has different needs from a couple using 20 minutes of hydrotherapy each evening, and a resort spa used by rotating guests has different needs again: durability of finishes, cleaning cycle length, and how quickly water chemistry recovers between users all shift.

If you are furnishing a wider project, the swim spa is one item in a longer list. Villas and hospitality sites often source outdoor lounge seating, pergolas and gazebos, sun loungers, bathroom ceramics and lighting from the same supplier so that finishes and delivery windows line up. The outdoor furniture for villas and resorts range sits alongside the pool products on this site, which is one reason buyers group them into a single brief.

When WS-S38 Is the Wrong Shell

A compact 3760 mm shell suits tight terraces and spa-first use. If the brief genuinely requires lap-style swimming, look wider in the range: Swimming Pools and Swim Spas covers configurations from small plunge-format units to extended channels that pair a swim lane with a separate hydrotherapy seat. Where the space itself is irregular, a customizable shape outdoor spa in square, round, oval or curved form lets the pool follow the deck instead of the deck following the pool.

Send the constraint and let the manufacturer propose. Buyers who fix the model first often pay for a shell that fights their site; buyers who fix the requirement first usually get two or three viable options and can choose on build quality and service rather than on dimensions alone.

A Brief You Can Copy

Here is the shape of an enquiry that produces comparable quotes. Adjust the numbers to your project.

Model of interest: WS-S38 (3760 x 2080 x 1110 mm). Site: terrace in [city], ground bearing [slab or deck], clear access width [x] m, distance to electrical panel [x] m. Use: private family, roughly [n] sessions per week, primary need hydrotherapy for shoulders and lower back; second question is whether a swim current is feasible in this shell. Required in quoted build: heat pump with electric backup, sand filtration, full insulation, insulating cover, jet map with seat positions, pump specifications with flow and head, ozone plus recommended sanitising step. Please confirm what is included, what is optional and priced separately, delivery basis to [port or door], lifting requirements, warranty terms and spare-parts lead times. Alternative shells worth quoting: [two options].

Reading the Replies

Lay the answers out in one table with a row for each of the eight questions. Three signals separate a serious reply from a form letter:

  • The supplier flags conflicts in your brief instead of quoting around them, for example telling you a swim current is not sensible in this shell.
  • Equipment is named with make and model, not described generically.
  • Optional items are priced separately rather than buried, so the base price means something.

Ask one follow-up question of each shortlisted supplier before you decide: "what would you change about this specification for [your climate]?" The quality of that answer usually tells you more than the first quotation did.

SANTERSON manufactures furniture and building materials in China and supports projects from design consultation and custom/OEM production through to freight, installation and after-sales support. Send your site dimensions, use pattern and required equipment list, and ask for a line-by-line specification of the build you are being quoted.

Enquiries: Contact SANTERSON