A corner tall cabinet looks simple on a drawing until it has to clear a door swing, line up with a tiled wall and carry linen, cleaning supplies or an appliance. Because Santerson Corner Tall Cabinets are made to measure rather than ordered off a shelf, the quality of the finished installation usually depends on one thing: how complete the information was when the unit was specified. The list below is what our production and design team needs from architects, builders and procurement teams before a corner tall cabinet can be quoted and built.
Why a corner unit needs more input than a straight one
Straight cabinets can absorb small dimensional errors. A corner unit cannot. It sits between two walls that are rarely perfectly square, it often shares its run with a vanity, a doorway or a tiled recess, and its side panels have to read as one plane against both walls. When we receive only a height and a width, we either build to nominal dimensions and leave the site to scribe on installation, or we stop and ask for more information. Neither is ideal, which is why we ask for the full set of inputs at the enquiry stage.
The measurements to send
| Measurement | What it decides |
|---|---|
| Finished floor level to finished ceiling, at both wall returns | Overall carcass height and whether a scribe or filler panel is needed at the top |
| Wall-to-wall distance along each return, taken at floor, mid-height and ceiling | Carcass depth on each side, and how much out-of-plumb has to be compensated |
| Angle between the two walls, measured or noted as assumed 90 degrees | Whether the back of the carcass is square, scribed or built with an angled return |
| Position and swing direction of the nearest door, plus handle projection | Door type (hinged, sliding, pocket) and the minimum clearance in front of the cabinet |
| Location of skirting, architrave, tiles, cornices and their thicknesses | Filler sizes and whether the carcass sits proud of the wall finish |
| Positions of sockets, switches, towel rails, pipework and any floor waste | Cut-outs, ventilation and whether services need to be relocated before production |
| Floor finish build-up and threshold heights along the run | Plinth or recessed toe design, and levelling range on adjustable feet |
Send these as a dimensioned sketch or an annotated set of site photographs with a scale reference. If you have architectural drawings, send the relevant elevations and sections instead, marked with the same information. Where two dimensions conflict, tell us which one governs; that single note prevents most rework.
The project inputs beyond dimensions
- Room and use. Bathroom, laundry, hallway or utility store. Damp areas call for different board and edge choices than a dry corridor.
- Storage programme. What goes inside: linen, towels, toiletries, vacuum cleaner, brooms, detergents, or an appliance. This sets shelf heights, drawer stack, hanging rail position and load requirements.
- Interface items. Whether the unit sits in a run with vanities, utility tall cabinets or linen storage, and whether the fronts must match other joinery on the same job.
- Finish system. Matte, high gloss, lacquer, veneer or melamine, with the reference you want us to work to. Send a physical sample or a manufacturer code where colour accuracy matters across a whole floor.
- Hardware preference. Hinge type, soft close, handleless or profile handle, integrated lighting. Our integrated cabinet lighting needs a driver location and a feed decided before the carcass is drilled.
- Quantities and schedule. How many units, which rooms repeat, and when they must arrive on site. Repeat types can be built once as a prototype for approval, then repeated.
How the specification moves from drawing to delivery
Once we have the measurements and the programme above, we return shop drawings showing elevations, section through the corner, shelf and drawer layout, door clearances and lighting points. You approve or mark up those drawings; only then does production start. Because these are custom-built units made under our custom and OEM service, an approval at the drawing stage is what protects the schedule later.
After production, freight is arranged to site through our logistics service, by sea, air or rail, with the export and import paperwork arranged for you. On installation we coordinate fixing, door adjustment, snag inspection and handover. For projects furnishing several rooms at once, it is normal to group corner tall cabinets with the vanities, wardrobes and wall panelling on the same order so that finishes, timings and delivery arrive as one package rather than four separate ones.
Two points worth confirming in writing before production: the exact finished dimensions of the walls the cabinet meets, since tile and plaster thicknesses change late in a job; and the load you intend to place on shelves and drawers. Both are easy to design for at the drawing stage and expensive to change afterwards.
A short checklist before you send an enquiry
- Dimensioned sketch or drawings, with heights taken at both wall returns
- Note of out-of-plumb or non-square corners, if known from site
- Storage programme and any appliance to be housed, with its own dimensions
- Finish reference and the joinery it must match
- Hardware and lighting choices, with driver location
- Quantities, room schedule and required delivery date
Send that much information and a corner tall cabinet stops being a risk item on the joinery schedule. It becomes one more made-to-measure unit that fits the first time it is put in place.