A floating TV unit looks simple on a drawing: one horizontal cabinet, fixed to the wall, with floor left clear underneath. In production it is one of the least forgiving items in a living-room package, because every dimension is measured against a finished wall that already carries sockets, conduit, skirting and a floor screed. When the enquiry arrives without those numbers, the factory quotes a shape rather than a product, and the correction happens on site at the client's cost.

SANTERSON manufactures Floating TV Units and related media wall systems as made-to-measure pieces, with material, finish and layout options set per project. The list below is the information we ask buyers, contractors and designers to send with an enquiry, and it is the same checklist that keeps a wall-hung unit from becoming a site problem.

1. Wall measurements taken after finishes are complete

Send the dimensions of the finished wall face, not the structural wall behind it.

A 30 mm difference between a plasterboard face and a stone-clad face moves the cabinet out of plane, and that difference shows at the shadow line.

  • Overall length and height of the wall panel or recess the unit sits in, plus any return wall within 500 mm.
  • Floor-to-ceiling height on that wall, and the finished floor level relative to the door threshold in the same room.
  • Position and centre-line of every socket, switch, TV outlet, data point and air or water vent inside the unit's footprint.
  • Skirting height and depth, if the skirting is being retained; a floating unit either notches around it or the skirting stops at the unit edge.
  • Projection available from the wall face to the front of the seating row, so the cabinet depth does not narrow the circulation route.

2. Screen and equipment inputs that set the carcass

The screen determines the width and the mounting detail; the equipment determines the ventilation and the doors.

  • Screen size, model where available, weight, and whether it is wall-hung on a fixed, tilt or full-motion arm.
  • Whether the screen sits on the cabinet top or on a bracket behind an opening - this decides internal reinforcement.
  • Equipment to be housed: soundbar, console, set-top box, receiver, games console, and whether each needs line-of-sight for a remote.
  • Source of power and low-voltage wiring, and where the cable drops are relative to the cabinet back panel.
Where a screen is mounted on the wall behind an open front, the opening size and the bracket type have to be agreed before the carcass is cut. Confirm the exact screen model and bracket with us at order confirmation; we do not assume a bracket from a screen size alone.

3. Wall construction and fixing condition

This is the input most often missing, and it changes what the factory supplies. A floating unit carries its own weight plus that of the screen and equipment, all of it as a cantilever from one wall.

Wall condition on siteWhat we need to knowEffect on the order
Solid masonry or concreteSubstrate type and whether a cavity or services run behind the plasterStandard wall fixing, fixings selected on site by the installer
Stud partition or timber frameStud centres, lining type, and whether noggins are already installed at the unit's fixing lineBearing needs to be built into the partition before it is closed up
Clad or decorative wall surfaceFinish material, thickness and total build-up from the structural faceFixing length and any spreader plate are set to suit the build-up
Plasterboard on dabs with a voidVoid depth and whether the plaster is sound across the whole panelFixing detail confirmed with us before manufacture

If the wall has not yet been built, send us the construction drawing. We mark the fixing line and the required bearing on it, and your site team prepares the partition once instead of opening it later.

4. Layout, storage split and door specification

Tell us how the unit is used, not only how long it is. Drawer fronts, flapped doors and open bays each take a different amount of case depth for the same internal space.

  • Clear opening width of any doorway or corridor that the assembled cabinet has to pass through on delivery; if the unit exceeds it, we build it in sections with a concealed joint.
  • Drawer, door and open-bay split, and which bays stay open for equipment.
  • Handle detail - handleless routed edge, integrated pull or visible knob - since it affects front alignment on adjacent units.
  • Whether the unit is part of a wider wall system. Our Wall Mounted Media Walls and Integrated TV Panels share finishes with the floating units, so a whole wall can be ordered in one specification.
  • For full-height schemes, see Full Height Media Walls, where the floating unit reads as a band within the joinery.

5. Finish, substrate and the environment it sits in

Send the finish reference rather than a description. A colour name means different things across lacquer, laminate and veneer, and a physical sample is worth more than any screen proof.

  • Finish type: lacquered, laminated panel, or wood veneer, with the sheen level you expect.
  • Matching items in the same room - wardrobes, sideboards, doors and wall panelling - so we keep one substrate and one colour batch across them.
  • Room condition: direct sunlight on the unit, or sustained heat and humidity in the space. We specify board and edge treatment accordingly.
  • Two-tone requests, with the front and carcass colours stated separately.

6. Project inputs that decide price and delivery

For a single villa the drawings above are enough. For a hotel, apartment or serviced-residence package, add the following so the quote reflects the real scope.

  • Unit count per floor type and total quantity across the project, plus a schedule of room types.
  • Destination port or site address, and who acts as importer at destination.
  • Packaging standard required - flat-pack for shared storage on site, or assembled crates where installation follows immediately on arrival.
  • Whether SANTERSON supplies other items in the same room: wardrobes, kitchen cabinetry, vanities, lighting, flooring and wall panels. As a one-stop furniture and building materials supplier, we consolidate these into one shipment, which removes the matching risk between separate vendors.
  • Programme dates: drawing approval, production start, vessel departure and site handover.

A short checklist to attach to your enquiry

  • Elevation of the finished wall with all services marked, in millimetres, from a fixed datum.
  • Floor-to-ceiling height and finished floor level.
  • Screen model or size, weight and mounting type.
  • Equipment list and which bays need remote line-of-sight.
  • Wall construction type and build-up thickness.
  • Clear delivery route width and doorway heights.
  • Finish reference, plus any items in the room that must match.
  • Quantity, room schedule, destination and programme dates.

Send what you have even if the list is incomplete. We review the drawings, mark the dimensions still missing, and return a marked-up elevation for your site team to confirm. That single exchange, done before the carcass is cut, is where the cost of a floating unit is either controlled or lost.

Send us your wall elevation

Share drawings, screen details and finish references for your floating TV unit, media wall or full villa joinery package. SANTERSON manufactures to project-specific dimensions with material and finish options, and delivers door to door with installation support.

Contact PHILLIP - Phone/WhatsApp +86 13928214007 - santerson@qq.com