A glass and lacquer combination wardrobe looks finished the day it is installed. It is judged again two years later, when a door no longer hangs true, a lacquered panel chips during site touching-up, or a replacement glass panel cannot be matched because nobody recorded which tint was specified. Wardrobe after-sales questions decide which of those outcomes you get. This guide lists the specific details to agree before an order is placed, and who normally pays for each one.

Why Mixed-Front Wardrobes Need More After-Sales Detail Than Plain Ones

A Glass & Lacquer Combination Wardrobe puts two materials with different behaviours into one door line. The lacquered front is a sprayed finish built up in coats; it can be repaired, but the repair must blend with surrounding panels under the room's lighting. The glass front is a fabricated panel — cut, edged and often tinted or frosted — and cannot be repaired once chipped; it is replaced.

That difference drives every question below. When one supplier makes both fronts and both carcasses, a replacement panel is made to the same recorded specification. When fronts come from separate trades, you are matching a colour and a glass tint against a memory. Our wardrobe range is made to measure with material and finish options specified per project, so the after-sales record starts at the quotation stage rather than at the point of failure.

The Eight Details to Agree in Writing Before You Order

Detail to confirmWhat a clear answer looks like
Finish reference and batch recordLacquer colour recorded by RAL or NCS code plus sheen level (high gloss, satin, matte); glass recorded by tint name and thickness. The same record is repeated on the packing list of any later replacement.
What the warranty coversCarcass structure, hinges and runners, sprayed finish, glass, and sliding gear named separately — with duration stated for each, not one blanket period.
What voids itOn-site cutting or drilling by others, wall finishes applied after installation, cleaning agents on lacquer, and impact damage called out explicitly.
Spare parts and replacement panelsWhether hinges, runners, sliding gear, handles and full front panels can be ordered individually years later, and for how many years that remains possible.
Lead time for a replacement frontA re-made made-to-measure panel takes production time. Ask what the current lead time is at the moment of failure, not at order date.
Who fits the replacementWhether local fitting is arranged, whether you fit it yourself against supplied instructions, or whether a fitter's visit is charged and how.
Snag process at handoverA documented inspection with the buyer at completion, a snag list, and who signs it off. This is where misaligned doors and finish marks get resolved at no cost.
Support route and hoursA named contact, the channel to raise an issue, and the working hours that apply — relevant when the site runs on a different time zone from the factory.

Glass Fronts: The Three Questions That Save Money Later

  • Which glass and which thickness? Clear, bronze, frosted, smoked and ribbed fronts each read differently in a bedroom. Ask for the tint name and thickness in writing; a replacement ordered from a photo rarely matches.
  • Safety specification. Confirm how the glazing is specified for the project and how edges are finished. This matters most in family villas, guest rooms and any wardrobe near a doorway.
  • Gear that carries the weight. Sliding glass fronts depend on top and bottom rollers and a track that stays aligned. Ask whether rollers and track are stocked as separate spares, since they wear before the glass does.

Lacquer Panels: What Repair Actually Involves

A minor mark on a lacquered front can often be blended in place. A deeper chip usually means re-making the panel, because a sprayed finish cannot be spot-repaired invisibly across a large flat surface at eye level. Before ordering, ask:

  • Whether spare panels can be produced later from the stored specification, and whether a matching batch of lacquer is still available.
  • Whether panels from different production runs are expected to match exactly in gloss level — useful if you order extra doors with the original set for future use.
  • How the panels should be protected during other site works, since most lacquer damage we hear about happens after installation, during painting and flooring trades.

Practical step: keep the approved finish schedule, the layout drawing and the photographs taken at handover in one file. That single file is what turns a disputed claim into a straightforward replacement.

How After-Sales Is Handled on Our Projects

Wardrobes are built-in work, so the after-sales process starts with the same drawing that governed production. Installation and after-sales support for our projects covers on-site installation, inspection and snag resolution, warranty coverage, spare parts or replacement, and ongoing maintenance. Where a wardrobe is part of a wider fit-out, the same team coordinates joinery with wall panelling, doors and flooring, so a repair visit does not uncover a second trade conflict.

For orders shipped overseas, the practical questions change shape rather than disappear. Freight and door-to-door delivery arrangements determine how a replacement panel travels; ask whether small replacement parts ship separately from the original container route, and who handles customs paperwork for them. Our logistics and door-to-door delivery service covers documentation such as commercial invoices and packing lists, which is also where a replacement shipment's finish reference should appear.

Because dimensions, finishes and layouts are specified per project rather than taken from stock sizes, the record of your wardrobe exists before anything is cut. That is the point of custom furniture manufacturing: the specification sheet that produces your unit is also the document a future replacement is made from.

Contract and Cost Split: Who Pays for What

Defect or damage typeTypical responsibility
Misaligned doors, warped carcass panel, failed hinge within the warranty periodSupplier, under warranty terms agreed at order
Chipped glass front from site impact after handoverReplacement panel re-made and charged; fitting arranged separately
Lacquer marked by another trade working on siteRepair charged to the party who caused it — which is why protection and snag records matter
Worn rollers or runners after years of useSpares supplied against charge; fitting per agreed arrangement
Modified wardrobe, cut or drilled on site by othersUsually outside warranty; ask before any third party alters a panel

Put this table into the purchase agreement in your own wording. It costs nothing at order stage and settles arguments that otherwise stall a project's handover.

Questions Worth Asking Before You Sign

  • Which finish code and glass tint will be recorded on my drawings, packing list and any later replacement?
  • Are hinges, runners, sliding gear and full front panels available as separate spares, and for how long?
  • What is the current lead time to re-make one made-to-measure panel?
  • Does the warranty cover finish and glass separately, and what voids each part?
  • Who inspects at handover, who signs the snag list, and what happens next if a snag remains open?
  • How do I raise an issue, to whom, and within what working hours across time zones?
  • If my project repeats the same wardrobe design across several rooms or units, can later orders match the original specification?

Common After-Sales Mistakes We See in Enquiries

Ordering a replacement from a photograph. Camera white balance shifts lacquer colours and flattens glass tints. Order from the recorded code.

Assuming one warranty period covers everything. Sprayed finishes, hardware and gear age at different rates; separate terms are more useful than one number.

Letting other trades work around installed joinery without protection. Most lacquer damage on a new build is not manufacturing-related. Cover the panels, then photograph them before the next trade enters the room.

Buying two layouts from two suppliers to save money. A mixed-front wardrobe split across suppliers transfers the matching problem to you at the moment of failure. Where combination modular wardrobes and glass-front units come from one production run, the spare parts question has one answer.

Frequently Asked Questions

Can a lacquered wardrobe door be repaired on site?

Light surface marks can often be blended in place. A chip or deep scratch across a flat panel usually means re-making the front, because a sprayed finish shows the repair boundary under bedroom lighting.

What happens if only one glass panel of a set is damaged?

That single panel is re-made to the recorded tint and thickness. Ask for the replacement's lead time and shipping route at that point; a small parcel and a container shipment follow different paperwork.

Do after-sales terms differ for overseas buyers?

The coverage should be the same; the mechanics change. Confirm who fits a replacement locally, how spares are shipped, and who prepares customs documents for them.

Should I order spare doors with the original wardrobe?

Only where floor area and budget allow, and only if you store them properly. Ask first whether panels made in a later production run are expected to match gloss level exactly.

Bring your specification to the conversation. Send the room dimensions, the finish code you want, the glass type, and whether the doors slide or hinge. We confirm what is made, how it is finished and what support applies before production starts — not after a problem appears.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Enquiries are answered within 24 hours during our working week.

SANTERSON supplies made-to-measure built-in furniture and building materials for villa, hospitality and office projects, with design coordination, production, logistics and installation under one scope. Related pages: built-in furniture, turnkey project solutions.