A curio cabinet is one of the smallest items in a villa or apartment fit-out and one of the easiest to get wrong. It has to hold objects safely, read well next to surrounding joinery, and arrive on site in one piece. Because Santerson Curio Cabinets are made to measure rather than supplied in fixed sizes, the quality of your enquiry determines how accurate the price is and how few changes you need later. This guide sets out exactly what to send, what we will come back to you with, and which details decide the cost.

What makes these cabinets custom

The curio cabinets in our Display Cabinets collection are configured per project: dimensions, layout and finish are specified for each space, together with material and finish choices. The same configurable approach runs across the wider display range, from Santerson Freestanding Cabinet pieces that stand independently to Santerson Open Display Units with no enclosure at all. As a one-stop furniture and building materials supplier, we build these cabinets alongside the cabinetry, wall panelling and joinery around them, so the case can match the rest of the room instead of sitting beside it as an imported afterthought.

Before you write: settle four decisions

Most slow quotations come back to the same four open questions. Answer them in the first message and the enquiry moves straight into costing.

  • Freestanding or built-in. A freestanding case can be delivered as one unit and moved later. A built-in case is sized to a recess and aligned with adjacent cabinetry, which means your site dimensions must be final before we cut anything.
  • Glass on how many sides. Corner cases and island cases wrap glass around two or three faces; a wall-mounted case normally has a single glazed front. More glass means more handling, more packing and a different freight treatment.
  • Lighting in or out. Integrated lighting needs the driver hidden, cable routes planned and a switch position agreed. If your project also uses Santerson Illuminated Display Cabinet specifications elsewhere, tell us early so the lighting detail repeats consistently through the property.
  • Shelving you can adjust. Fixed shelves are a lower-cost option; adjustable shelving with pin holes lets a display change over the years. State which objects go inside (ceramics, books, awards, retail product) because that sets shelf depth and load requirement.

The information we need in your enquiry

Send the following and we can price the work rather than ask a round of clarifying questions. A short email with drawings attached is enough; nothing needs to be formatted specially.

ItemWhat to sendWhy it matters
Location and quantityRoom, wall or recess the cabinet belongs to, and how many cases the project needs.Grouping several cases into one order changes both production and freight handling.
DimensionsOverall height, width and depth; for built-in work, the finished floor-to-ceiling level and any skirting or cornice to work around.Made-to-measure sizing is quoted from your opening, not a catalogue size.
Cabinet typeCurio, illuminated display, open display unit or freestanding case, with a sketch if the shape is unusual.Determines glass area, framing and how the unit is supported.
Finish and materialColour, wood tone or lacquer sheen, plus the cabinetry or panelling it must match. A finish code or a sample reference is ideal.Matching an existing scheme is straightforward; inventing a new colour mid-production is not.
Glass and hardwareClear, low-iron, tinted or ribbed glass; door type; handle or handleless edge; lock if children or public access are a factor.Hardware grade and glass type are the two line items buyers most often change after quoting.
Interior layoutShelf count, adjustable or fixed, plus any drawer, fabric-lined tray or plinth base.Interior fit-out drives production time more than the exterior does.
LightingIntegrated lighting yes or no, warm or cool tone, switch or sensor, and where power is available.Electrical specification must be planned with the case, not retrofitted on site.
Destination and deliveryProject address, delivery method, and whether the site has lift or stair access constraints.Oversized glazed units need specific packing and sometimes a crated delivery.
ProgrammeTarget on-site date and any trade sequence that must be respected.Fixtures must arrive after the wet trades and before final styling.

What happens after you send it

Our workflow follows the same stages described on our service pages: consultation, design and planning, production, logistics, installation and after-sales. In practice that means:

  • We review the enquiry and reply with questions on anything missing, usually dimensions, finish reference or electrical points.
  • You receive a quotation broken down by unit, with the specification written out so you can check it against your drawings rather than trusting a single total.
  • Once you confirm the order, we produce shop drawings for sign-off before cutting. This is the point at which changes are still cheap.
  • Production runs with quality control on frame squareness, glass edges and finish continuity, then the cases are packed for the agreed freight route.
  • On arrival the units are inspected with you and any snag list is closed out under our installation and after-sales support.

Prices depend on your specification and destination. Nothing in this guide is a quotation, and we do not publish lead times or transit periods before your drawings and delivery address are confirmed.

What moves the price

  • Glass area and type. The single largest variable. Three-sided glazing and low-iron glass cost more than a standard single front.
  • Non-standard dimensions. Anything that does not sit on a practical module (very tall cases, shallow depths, curved fronts) adds engineering time.
  • Finish. High-gloss lacquer takes more labour than a melamine panel. Matching an existing finish on site may need a sample run.
  • Integrated lighting and electrics. Fixtures, drivers, sensors and cable routes are separate line items.
  • Interior fit-out. Lined trays, drawers and lockable doors add cost per unit.
  • Order size. Several cases for one property, or the same specification repeated across a development, is more efficient than one-off pieces.
  • Freight method and access. Sea freight on a shared container differs from air freight on a single crate; stair-only access changes handling at destination.

Five mistakes that delay a quotation

  • Sending a photo with no dimensions. Style tells us what you like; only measurements let us price the work.
  • Quoting from architectural openings before finishes are installed. A 5 mm floor build can make a built-in case useless.
  • Choosing the cabinet before the lighting plan. Recessed profiles and cable routes belong in the case design, not in a site modification.
  • Leaving the finish undecided. "Any wood tone" produces three prices and no comparison.
  • Not naming the delivery constraints. A 2.4 m glazed case cannot be assembled on a stair landing.

A ready-to-send enquiry template

Copy this into an email and fill in what you know; leave blank anything genuinely undecided and we will propose options instead.

Project: name, city, villa / apartment / hospitality
Item: Santerson Curio Cabinets, quantity ___
Type: freestanding / built-in / wall-mounted
Opening or overall size: H ___ x W ___ x D ___ (finished levels noted)
Glass: faces glazed ___, glass type ___
Finish: colour or wood tone, matching reference ______
Interior: shelves ___ (fixed / adjustable), drawer yes/no, lined base yes/no
Lighting: yes/no, tone ___, switch position ______, power point location ______
Security: lock required yes/no
Delivery address and access notes: ______
Target on-site date: ______
Drawings attached: yes / no

Getting in touch

Send drawings, dimensions and finish references through our contact page, or reach us directly on WhatsApp +86-13928214007 (PHILLIP) or santerson@qq.com. If the curio cabinet is part of a wider fit-out such as cabinetry, wardrobes, panelling, flooring and lighting from the same source, say so in the first message; coordinating them as one order is where a turnkey furniture and building materials supplier saves you the most time.