A white acrylic wardrobe looks straightforward on a mood board and far more demanding on site. The panels are made to measure, the room is rarely square, and the finish shows every gap that a rough opening or an out-of-level floor will create. Coordinating white acrylic wardrobes with design drawings and site conditions is what separates a built-in that reads as architecture from one that reads as furniture parked in a gap. The checklist below follows the order we work in on residential and hotel bedroom projects, from the drawing set through to handover.

Start from the drawing set, not the finish sample

Finish selection is the last decision, not the first. Before a colour or sheen is confirmed, the drawings need to establish three things: the exact run of the wardrobe, how it meets the ceiling and adjacent walls, and what services sit behind it.

  • Room elevations for every wall the wardrobe touches, with finished floor levels marked.
  • Reflected ceiling plan, so lighting, sprinklers, air diffusers and curtain boxes are shown relative to the cabinet top.
  • Electrical and data positions: internal lighting circuits, motion switches, shaver sockets, and any charging points inside drawers.
  • Door swing and circulation clearances, particularly for hinged versus sliding fronts in narrow bedrooms and walk-in rooms.

Where we supply the joinery as part of a wider fit-out, this coordination happens through our interior design services, which cover space layout planning, 3D renderings and drawing-to-production coordination. That single route removes the handover gap between an interior designer's detail and the factory's shop drawing.

Turn the architect's elevation into a production drawing

A design elevation tells you what the wardrobe should look like. A production drawing tells the factory how to build it, and the difference is where most coordination failures begin. We ask for sign-off on the production drawing before any panel is cut.

Item on the production drawingWhat the site team must confirm against it
Overall width, height and depth per unitMeasured openings at high, middle and low points, plus wall straightness along the run
Panel layout and door splitObstructions: skirting, architraves, radiators, pipes, reveals and existing cornices
Internal layout — hanging, drawers, shelves, shoe and accessory zonesClient storage brief, ceiling height for long-hang areas, drawer clearance against carpet or thresholds
Edge banding and panel thicknessDoor style selected, handleless route if specified, hardware load rating for tall doors
Finish reference for the acrylic surfaceBatch direction and lighting temperature in the room, since white shifts visibly under warm and cool light
Scribe, filler and sash detailsWhether the unit is to sit flush to plasterboard, tile or a stone feature wall

Our custom and OEM service covers this stage directly: bespoke finishes and textures, prototyping, and specification of sizes and internal layouts per project rather than per catalogue line. For a villa or apartment package the same drawing discipline applies to every bedroom, which is where standardised detail notes save the most time.

Verify site conditions before panels are released

White acrylic has a smooth, uniform surface. That is exactly why it exposes uneven walls, tilted floors and poorly set scribes. A site check costs an hour; correcting it after delivery costs a re-made panel and a return flight for the fitter.

The site checks we require

  • Floor level along the full run. Record the fall in millimetres. Adjustable plinths cover small deviations; a screed or packing frame covers larger ones.
  • Wall plumb and straightness. Note bow and out-of-plumb at both ends of the run, not just the middle.
  • Ceiling height at several points. A wardrobe drawn to a flat ceiling that is actually sloping needs a scribed top detail decided in advance.
  • Floor finish build-up. Confirm whether carpet, timber or tile is going in before or after installation, and the resulting threshold height.
  • Wet areas and services. Bathroom walls sharing a wardrobe wall need their waterproofing and pipe positions fixed before the carcass is set out.
  • Access route to the room. Panel lengths, lift dimensions, stair turns and corridor widths determine whether a unit ships as one carcass or in sections.
Rule we apply: any deviation greater than what the scribe detail can absorb is resolved on site — packing, blocking or a revised filler panel — before the drawing is marked as-built and released to production.

Match the finish decision to the room's light and use

White is not one specification. The same room can carry a high-gloss, matte or two-tone acrylic front depending on daylight, traffic and how much maintenance the client will accept.

  • Matte acrylic wardrobes suit rooms with strong daylight, since they diffuse light and hide handling marks better than a mirror-flat surface.
  • A high-gloss front enlarges a compact bedroom visually but shows fingerprints and edge scribes, so hardware alignment and door flatness must be signed off on the sample.
  • Two tone acrylic wardrobes let a floor-to-ceiling run break into bands that read as wall panelling, useful where the ceiling line is not crisp.
  • In hotel rooms, specify the internal layout first — luggage height, hanging count and drawer zones — then choose the front, so storage capacity is not traded away for appearance.

Approve a physical panel in the actual room before final sign-off: one tile of floor finish, one sample of wall paint, and the selected acrylic door under both daytime and artificial light. This single step prevents most colour disputes at handover.

Sequence production, delivery and installation

Built-in joinery fails on schedule more often than on quality. The wardrobe needs a fixed date in the programme and a defined predecessor: wet trades finished, floor finishes set, services first-fix complete and inspected, and the room locked and dry.

  • Production: released only after the production drawing is signed and site deviations are recorded.
  • Packaging and shipping: panels protected at edges and corners, cartons marked with room and elevation codes that match the drawings, not generic numbers. Our logistics and door-to-door delivery service handles container loading, customs paperwork and shipment tracking to site.
  • Storage on site: kept flat, indoors and off the floor until installation begins; acclimatised to the room's conditions.
  • Installation: set to level first, then fixed, then scribed, then doors adjusted for parallel gaps. Our installation and after-sales support covers on-site fitting, snag inspection, spare parts and warranty follow-up.
  • Handover: protectors removed, surfaces inspected under raking light, doors and drawers cycled, and the as-built drawing issued to the client's file.

Close the loop with a documented sign-off

Three signatures carry the project: the designer confirms the built result matches the approved elevation, the site contractor confirms the opening and services were as recorded, and the client confirms the internal layout delivered what the brief asked for. Keeping those records alongside the production drawing is what makes a later spare panel or extension straightforward rather than a re-survey from scratch.

If your drawings are still at concept stage, our interior fixtures team can work from room dimensions and elevations to produce the wardrobe specification, internal layout and finish schedule as part of a whole-apartment or villa package.

Send us your bedroom elevations, measured openings and storage brief, and we will return a production drawing with panel layout, internal configuration and acrylic finish options for review before anything is cut. Contact SANTERSON to start the coordination on your project.