A glass-front bar cabinet looks simple on a drawing: a tall box, two glazed doors, some shelves behind them. In production it is one of the more detail-heavy items in a joinery package, because glass, framing, lighting, hardware and storage all have to agree with each other before the first panel is cut. The difference between a unit that reads as built-in joinery and one that reads as furniture dropped into a niche is almost always decided in the brief. Below is the information to send to us when you are specifying custom Santerson Glass Front Bar Cabinets, and what each item changes on the shop floor.
Start with the opening, not the cabinet
Send us a dimensioned sketch of the space the unit has to sit in: overall width, height and depth, plus floor finish build-up, skirting, architraves, recesses, columns and any door or drawer that swings across the front. A bar cabinet is normally made to measure for its opening, so an approximate wall length is enough to quote a price but not enough to build.
Tell us whether the unit is freestanding, recessed into a niche, or part of a longer run of integrated bar systems. A cabinet that has to line up with adjacent kitchen or dining cabinetry inherits that run's door profile, carcass depth, plinth detail and handle style. If that is the case, send the cabinetry specification you are already working to, so the glazed unit is built to the same language rather than a new one.
State the glass: type, tint and what it should hide
Glass is the visible surface, so be explicit about it:
- Glazing type - clear, frosted, smoked or ribbed glass changes how much of the contents you see. Frosted and smoked glazing soften what is on display; clear glass shows everything, including labels and bottle backs.
- Framing - say whether you want a slim metal frame around the glazed door or a wood-fronted door with a glass panel inset. Frame colour and profile should be named against a sample or an existing product reference, not an adjective such as "black".
- Safety and handling - tell us where the unit is used (family villa, guest house, hospitality floor, bar counter area) and whether doors will be opened frequently by staff or children. This drives glass specification and door construction.
- Cleaning access - glazed doors collect fingerprints and dust on both faces. Note whether the inside face can be reached, and how deep the cabinet goes.
List what will actually live inside
Interior layout follows contents, not aesthetics. Send us a short list:
| Contents | What we need from you |
|---|---|
| Bottles, upright and stored on their side | Tallest bottle to be stored, and whether the shelf height must clear it with the door closed |
| Glassware and stemware | Whether you want fixed shelves, a rail-mounted rack, or adjustable shelving on pitch holes |
| Glasses, decanters, trays | Typical diameter and depth of the largest item, so shelf depth is set correctly |
| Small appliances or a wine conditioner | Model data sheet with dimensions, ventilation requirement and door swing direction |
| Bar tools, ice bucket, bottle openers | Whether these sit in drawers, on open trays or behind the glazed doors |
If you want some items displayed and others hidden, say which. That single sentence decides how much of the front is glazed, where solid panels go, and whether the lower section becomes drawers instead of a cupboard.
Specify integrated lighting as a system
Lighting behind glass is where briefs most often fail, because "LED strip inside" leaves too much open. Send:
- Where the light should fall - shelf-edge, vertical wash on the back panel, or top-down onto display items.
- Colour temperature and brightness you expect, with a reference fixture or sample if you have one.
- Switching method - door-activated, touch, wall switch, or linked to the room's lighting circuit.
- Where power and the driver can be reached for service, and whether the driver may sit inside the carcass.
Our integrated cabinet lighting is specified per project, and we will confirm fitting positions on the shop drawing. If the unit sits opposite a window, mention it: reflections in glazed doors are a siting problem, not a joinery problem, and it is cheaper to solve at layout stage.
Name finishes against samples
Carcass, door frame, interior back panel, shelf material and edge treatment should each be named. Do not rely on a colour name alone - "oak", "grey" and "matte black" cover a wide range of products. Where the bar cabinet must match other joinery in the same project, send us the reference sample or the product code you have already specified, and tell us which surfaces need to match exactly: door fronts only, or carcass edges and interior too.
Our custom furniture materials and finishes service covers bespoke finishes, textures and material choices, and we will confirm what is available for a given component before production. For surfaces that face guests - the door frame, the visible carcass sides, the interior back panel behind the glass - say so in the brief, because those are the parts worth specifying tightly.
Hardware and door behaviour
- Door type - hinged or sliding. Sliding needs track clearance and a wall or panel to receive the leaf; hinged needs a clear swing arc.
- Handle style - profile handle, integrated finger pull, or push-to-open. Handle choice affects finger clearance against the glass.
- Closing behaviour - soft-close hinges and dampers if the unit is in a living area or guest suite where noise matters.
- Locking - say whether any section needs a lock, which one, and who holds the key.
- Duty level - residential use and high-frequency hospitality use are not the same; tell us which applies.
Send the practical constraints
These items rarely appear on a design drawing but decide whether the unit arrives intact and fits:
| Constraint | Detail to include |
|---|---|
| Delivery route | Lift dimensions, stair widths, corridor turns, the largest assembled piece that can reach the room |
| Site conditions | Floor level and flatness, wall plumb, whether the carcass must be scribed or packed on site |
| Services | Socket positions for appliances and lighting, and whether new wiring must be added before installation |
| Sequence | Which trades come before installation - flooring, paint, stone benchtop, glazing |
| Programme | Your required site date, so we can confirm production and shipping against it rather than assume |
How our team turns your brief into a buildable unit
Once the above is with us, the process on our side runs through design consultation and space planning, material selection and product specification, then manufacturing with quality control. You receive shop drawings showing dimensions, glazing, framing, interior layout, lighting positions and hardware before anything is cut - that drawing is the document you should approve, because it is what production follows.
For projects where the bar cabinet is one item in a wider fit-out, coordinating it with cabinetry, wall panelling, flooring and lighting under one supplier removes a set of interface arguments. Our turnkey interior project solutions cover villas, hospitality and office projects from design through production, logistics and installation, which is the usual route when glazed joinery has to match the rest of the package.
A brief worth sending in one email: dimensioned opening drawing; photo of the space; contents list with tallest item; glazing type and frame colour referenced to a sample; lighting intent and switching; hardware preference; appliance data sheets if any; site access dimensions; required site date. If one of these is unknown, say "not decided" rather than leaving it out - we will then propose an option and note what it affects.
Send your drawings, room photos and contents list to our project team and we will return shop drawings for the glazed bar cabinet with glazing, framing, interior layout and lighting positions marked, so you can confirm the detail before production starts. Contact PHILLIP on +86-13928214007 or santerson@qq.com, or use our contact page.