A set of wooden sliding doors looks simple on a drawing: two or three panels, a track, a finish that matches the joinery. On site it is one of the tighter trades to coordinate, because the opening, the floor level, the wall build-up and the hardware all have to agree before anything is cut. When procurement teams order Santerson Wooden Sliding Doors for a villa or apartment package, the difference between a clean handover and a snag list usually comes down to what was written down before production started.
SANTERSON manufactures these doors made to measure, with material and finish options and a layout tailored to each project. That flexibility is the point of the product, and it is also why an enquiry that only says "wooden sliding door, natural oak, 3 panels" is not yet an order. The checklist below covers what we ask buyers and their design teams to document, so the doors arrive ready to install.
1. Opening dimensions taken the way the fitter needs them
Sliding doors are made for an opening, not for a nominal module size. Document the finished structural opening width and height at three points across each dimension — left, centre, right for width; head, middle, sill for height — and record which measurement governs. Note whether the floor finish is already laid or still to come, and how thick it will be, because that changes the clear height under the track.
- Width and height at multiple points, in millimetres, with the governing figure marked.
- Whether the opening is plumb and square, and any deviation you want compensated for or corrected on site.
- Finished floor level, threshold detail and whether a recessed track is required.
- Clear height under any ceiling reveal, pelmet or cornice the panels must pass.
2. Panel count, stacking side and traffic flow
The layout decision belongs to the room, not to the door catalogue. Decide which side the panels stack, whether that stack blocks a switch, a handle, a wardrobe run or a piece of furniture, and how wide the usable clear opening needs to be when the doors are open. For wider openings, confirm whether you want a fixed panel plus moving panels, or all panels moving on two or three tracks.
Write down the passing width you need to maintain — for a bed, a wheelchair, a service trolley — and let that drive the panel count rather than the other way round. Where a room needs a full-width opening occasionally, say so; it changes both track specification and panel weights.
3. Wall build-up and what carries the load
This is where undocumented assumptions cause the most rework. A sliding door system is only as good as the structure it hangs from or sits against. Document the wall construction behind and around the opening: masonry, stud partition, steel frame, or a joinery box. Record the depth available for the track and any pocket, and confirm that the head structure can carry the panel weight once the doors are in daily use.
If you want a pocket door that disappears into the wall rather than a surface-mounted bypass, that decision has to reach us before the wall is closed up. Pocket details change the framing dimension, and a late change means opening finished work.
4. Material, finish and the reference you actually approve
Colour names travel badly between a mood board, a drawing and a factory. Specify the species or substrate, the finish type, the sheen level and the grain direction, then confirm against a physical sample rather than a screen. For projects with several door types running together — for example Santerson Flush Sliding Doors in the corridors and hinged doors elsewhere — document which items must match each other, so the joinery and the doors are finished to one reference.
- Approved sample reference, dated and signed by whoever holds the design authority.
- Sheen and texture expectations, especially for dark or high-traffic interiors.
- Matching schedule: which doors, panels and casings must read as one family.
- Edge and reveal detail where the door meets skirting, architrave or a wall panel.
5. Hardware, operation and access requirements
Hardware is usually specified last and it should not be. Document handle type and position, whether a recessed pull is needed so panels do not clash when they pass, lock or latch requirements, soft-close or bumper stops, and the operating force acceptable to the users. For hospitality and accessible residential work, note any requirement for low opening effort and clear maneuvering space on both sides.
Also record what happens when something wears: which components should be replaceable without removing the door from the track, and how many spare parts you want shipped with the order. That conversation is cheap at quotation stage and expensive after handover.
6. The specification sheet we can actually build from
Before production, we ask for one consolidated document per door type rather than details scattered across drawing sets, email threads and comment bubbles. A workable record looks like this:
| Item to document | Why it matters on site |
|---|---|
| Door schedule reference and room/location code | Keeps panels, tracks and fixings matched to the right opening at delivery. |
| Measured opening dimensions plus governing figure | Removes guesswork on out-of-square openings and finish build-ups. |
| Panel count, stacking direction, track count | Determines clear passing width and how the room works in practice. |
| Wall type, pocket or surface mount, available depth | Fixes framing requirements before walls are closed. |
| Material, finish, sheen, approved sample reference | Protects colour and texture consistency across the package. |
| Hardware set, handle position, closing action | Avoids panels clashing and doors that are hard to operate. |
| Quantities per type, delivery sequence, packaging | Lets the site receive doors in the order the rooms are ready. |
| Site contact and installation responsibility | Clarifies who sets out, who fits and who signs off. |
7. Coordination, logistics and sign-off
Doors arrive as part of a larger package, so the paperwork should say how they reach the building. Confirm quantities per type, the delivery sequence against the site programme, packaging and handling requirements, and who receives and inspects the consignment. SANTERSON handles freight and door-to-door delivery for project orders; on your side, document the receiving contact and the inspection step so damage is recorded at the point of delivery rather than discovered during installation.
At handover, sign off against the same document you ordered from: opening dimensions as built, operation under normal use, finish condition, and hardware function. Keep the approved sample reference with the maintenance record — it is what makes a later matching panel possible.
Related products in the same collection
Where the sliding principle is used to close storage rather than a room, Wooden Sliding Panels follow the same made-to-measure approach for wall systems, and Sliding Door Corner Wardrobes apply it to storage in awkward plans. Specifying doors and storage panels together keeps the timber, finish and hardware language consistent across the project.
Send us your door schedule
Share measured openings, panel layout, wall construction and the finish you want matched, and our project team will confirm what is buildable, where adjustments are needed and how the doors fit into the rest of your furniture and building-materials package.