A wall mounted cabinet looks like a small line item on a joinery schedule until it arrives on site, meets a tiled surface and has to be opened every day by people who never saw the drawing. Approving one is cheap; replacing one after handover is not. The checklist below is what we ask project teams to settle before the shop drawings are signed, whether the unit sits in a guest bathroom, a villa powder room or a back-of-house store.

Start With What the Wall Can Actually Take

Wall hung storage transfers its weight, plus the weight of everything stored inside it, into the substrate at four or fewer fixing points. Before any finish decision, confirm with the local contractor: the wall build-up and what sits behind the tile; whether blocking or a steel backing frame is needed between studs; and where the fixings may and may not land, because water lines, waste pipes and electrical boxes are usually in exactly the zone a cabinet wants to occupy. In wet areas, ask who seals the fixing penetrations after installation and whether that falls to the tiler, the installer or the joinery supplier.

This is also where the height question gets answered properly. A dimension taken from a drawing does not know about finished floor levels, tile thickness, a vanity top below or a mirror above. Record the clear space available after all adjacent finishes are installed, and state in the order which level the heights are measured from.

Confirm the Specification Line by Line

Our Wall Mounted Cabinets are made to measure, with material and finish options and a layout tailored to each project. That flexibility is an advantage during procurement and a risk if the specification is left open when the order is placed. Before approval, every one of these should be closed on paper:

  • Final dimensions, including depth projection from the finished wall face and clearance for doors or drawers to open fully.
  • Substrate and finish, with a physical sample signed off, not a screen image or a colour name.
  • Edge treatment and visible hardware, since these decide how the unit reads next to vanities and wardrobes made by other suppliers.
  • Interior configuration: shelf heights, drawer count, and whether adjustable shelves are actually supplied as adjustable.
  • Moisture exposure: whether the unit sits in a splash zone, next to a shower enclosure, or in a dry store.
  • Integrated services, if lighting, a mirror, a socket or a shaver supply is part of the unit.
  • Packaging and labelling per room or unit number, which matters more on a multi-key project than almost anything else at install stage.

Coordinate It With the Rest of the Bathroom Package

Wall cabinets rarely stand alone. A floating vanity, a mirror cabinet and a tall store such as linen cabinets usually share the same wall, the same finish palette and the same installer. Check the set together: door swing directions against each other, consistent grain or sheen direction across panels, aligned reveals between units, and one agreed shadow gap rather than three different ones. Where a lighting element is involved, confirm the electrical specification and who supplies the transformer or driver.

Decide Who Owns Each Step of Delivery

For international orders the failure points are rarely in the workshop; they sit at the handovers between parties. Settle these before approval:

Item to confirmWhy it matters at install
Pack size and heaviest single pieceIt has to pass the lift, stairwell or corridor it will actually travel through.
Delivery terms and place of delivery"Delivered" to a port and "delivered" to a bathroom door are different jobs.
Fixing kit supplyBulkheads, anchors and brackets specified for the real substrate, not a generic bag.
Installation responsibilitySupplier crew, main contractor or local joiner, named in writing.
Snag and replacement routeWho inspects, what is photographed as evidence, and how a damaged panel is re-made.
Spare parts holdingExtra hinges, handles and one spare door avoid a six-month wait on a defect claim.

Run One Mock-Up Before Releasing the Full Order

For any repeatable bathroom type, ask for one complete unit installed in a real wall condition: tiled, with the adjacent vanity in place and the mirror hung. It tests projection, opening clearance, finish under the actual lighting, and whether the fixing method holds. The cost of one mock-up is small against re-making the same unit across twenty bathrooms. Our Custom & OEM service covers bespoke finishes, materials and prototyping, so a first article can be built to the signed sample before production is released.

Approval gate. Nothing on this list should be left as "to be confirmed on site". If dimensions, substrate, finish sample, fixing method or installation responsibility are still open when you sign the shop drawing, the risk simply moves to a later and more expensive stage of the job.

Send us the room layout, wall build-up and the finishes you are working to, and we will return made-to-measure drawings for review before anything goes into production. Enquiries through our contact page.