Integrated storage walls are one of the easiest places for an overseas order to go wrong, because the unit is built around your room rather than a fixed catalogue size. If you are furnishing a villa or apartment project in Australia and considering the Santerson Mixed Open & Closed Storage system, the useful question is not “what does it cost” but “what do I need to have confirmed before production starts”. Below is the verification checklist we would walk through with a buyer on a Melbourne or Sydney fit-out.
What the product actually is
The Mixed Open & Closed Storage unit sits inside SANTERSON's Integrated Storage Walls range. It combines open shelving and display niches with closed cabinets in one wall composition, so daily-use items stay behind doors while books, ceramics and decorative pieces sit out in the open. Layout, dimensions and finish are specified per project rather than ordered in set sizes, which is exactly why the verification steps below matter. The same range also includes Santerson Open Display Niches if you want more open area and less cabinetry in the composition.
SANTERSON itself is a China-based furniture and building materials manufacturer and one-stop project furnishing supplier, with turnkey work covering design coordination, custom/OEM production, door-to-door logistics, installation support and after-sales service. Australian project references published on the site include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra.
Seven things to verify before you place an order
| Item to verify | What “confirmed” looks like on paper |
|---|---|
| Site dimensions and level | A dimension sheet taken from the actual finished floor and completed wall finishes, not the slab stage, with floor-to-ceiling height noted at several points along the run. |
| Open-to-closed ratio | A shop drawing showing which modules are open shelves, which are doors or drawers, and where power points, skirting and architraves fall in relation to them. |
| Substrate and finish | The specific board, door material and surface finish named on the quotation, with a physical sample signed off before production for anything in a lacquer, veneer or high-gloss range. |
| Fixings and wall build-up | Confirmation of the wall substrate you will fix into, and whether a fixing pack or bearer frame is included in the price or supplied locally. |
| Packaging and lift access | Packing list with panel weights and longest single piece, checked against your stairwell, lift or doorway clearances before the container arrives. |
| Delivery terms | The Incoterm actually quoted, who handles Australian customs clearance and duties, and the exact delivery point: kerbside, port, or into the dwelling. |
| Snag and spare-parts route | Named contact for inspection on arrival, how replacement doors, hinges or shelf panels are ordered, and what the warranty covers and excludes in writing. |
Dimensions: measure at the right stage
Because this is a made-to-order wall system, the dimension sheet is the single most important document in the file. Measure after plasterboard, tiling, paint and flooring are complete, and record the height at both ends plus the middle of the run; older Australian villas and renovated apartments are rarely flat over a long wall. Note protrusions that people forget: air conditioning returns, downlights near the ceiling, skirting depth, door swings and any switch plates that will sit inside the unit footprint.
Send those dimensions to the supplier together with a photo of the wall, and ask for a shop drawing back before you approve production. A drawing you can read is worth more than a rendered mood image: it should show module widths, shelf heights, door reveals and total assembled width against your wall.
Finishes and materials: get the specification named
“Matte”, “veneer” and “high gloss” describe a look, not a build. On the quotation you want the door substrate, the surface system and the edge treatment stated for each element, plus the hardware brand or type for hinges and drawer runners. For wall systems that run floor to ceiling, ask how the top closure is detailed against a non-level ceiling — a scribe or shadow gap changes both appearance and site labour.
If you are specifying other joinery on the same project, ordering it together keeps finishes consistent. The Hidden Cabinets option in the same Integrated Storage Walls range is worth looking at where you want a door to disappear into the panelling, and Santerson Corner Storage covers awkward returns and deep corners in the same composition.
Logistics: read the delivery terms, not the marketing copy
SANTERSON's service pages describe freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Treat those as a scope to be confirmed for your specific order rather than a guaranteed service level. Before paying a deposit, ask in writing: which Incoterm applies, who is the importer of record, what documents will accompany the shipment (commercial invoice, packing list, certificate of origin), whether cargo insurance is included or optional, and where the goods physically stop.
Installation and after-sales: get the local reality in writing
The site lists on-site installation, inspection and snagging, warranty coverage, spare parts and ongoing maintenance. For an Australian project, ask specifically who performs the install — a supplier-supplied crew, a supervised local tradesperson, or your own builder following fixing details — and what documentation arrives with the goods: assembly drawings, fixing schedules and a hardware list.
Then confirm the warranty in writing: its duration, what is excluded (site damage, moisture exposure, unauthorised modification), and how a replacement panel or hinge is ordered and shipped. Response-time figures quoted on a website are marketing claims until they appear in your contract, so have the actual terms stated in the order confirmation.
A short sequence that keeps the order clean
- Issue a project brief with room dimensions, finish intent and the open-to-closed split you want.
- Request a shop drawing plus a written material and hardware specification; review it against your wall, not your mood board.
- Approve physical finish samples, then confirm packaging weights and longest piece against site access.
- Agree delivery terms, importer of record and inspection point before the deposit is paid.
- Inspect on arrival, photograph any damage the same day, and log spare-part contacts before handover.
Frequently asked questions
Can the layout be changed after production starts? Treat a made-to-order wall system as fixed once production begins. Change requests belong at the shop-drawing stage; late changes usually mean re-made panels and a new production slot.
Is the unit supplied assembled or flat-packed? That affects freight volume and site labour, so confirm it on the packing list rather than assuming. Ask for panel weights and dimensions in writing.
Can I match this wall to kitchen or wardrobe joinery from the same project? Yes, if the substrate, finish system and hardware are specified identically across orders. Ordering through one supplier makes that consistency easier to hold; SANTERSON supplies both built-in furniture and interior fixtures for whole-project packages.
What if my ceiling is not level? Ask for a scribe, shadow gap or bulkhead detail on the drawing. A floor-to-ceiling unit specified off a single nominal height will not close cleanly against an uneven ceiling.
If you want the specification reviewed before committing, send your wall dimensions and a photo of the space to the project team through the contact page, and ask for a shop drawing, a named material and hardware schedule, and the delivery terms in writing. Those three documents are what separate a smooth container-to-handover order from an expensive correction.