Glass sliding panels look simple on a drawing. A panel slides across a track, divides one space from another, and disappears when it is not needed. The difference between a specification that behaves for years and one that binds, rattles or needs replacing usually comes down to what the buyer asked before the order was placed. If you are comparing Santerson Glass Sliding Panels for a villa, apartment or hospitality fit-out, this is the shortlist worth working through.
1. What the panel is actually specified to close over
The catalogue entry for these panels describes them as configurable glass sliding panels for wall system projects, with finish, layout and dimensions set per project. That wording matters: the listing is a starting point, not a fixed size. Before you compare prices, state the clear opening width and height, the finished floor and ceiling levels, and whether the panel closes against a wall return, a fixed glass light or another moving leaf.
Send the same drawing to every supplier you quote. A comparison is only fair when each quotation covers the same opening, the same number of leaves and the same track arrangement; otherwise you are comparing different products at different prices.
2. Glass type, thickness and what happens on impact
The product page does not publish a glass thickness or a safety classification for this line, so treat both as open questions rather than assumptions. Ask which glazing the quoted price includes, what thickness it is, and how the panel is expected to perform in your setting — a bathroom or poolside area, a corridor in a hotel, a bedroom wardrobe front and a lobby screen carry very different expectations.
Get the glazing specification and any applicable safety requirement confirmed in writing for the specific project. Where a local code or a client's insurance policy names a required glazing type, put that wording into your enquiry instead of hoping the factory will propose it.
3. Track, hardware and how the leaves are hung
The panel is only as good as what carries it. For any sliding wall system, ask:
- Top-hung or bottom-rolling, and whether the floor track is recessed, surface-mounted or absent.
- How many leaves, in how many tracks, and where each leaf stacks when open.
- Whether the runners, guides, handles and locks are included in the quoted price or listed as extras.
- What adjustment range exists on site for level and vertical alignment.
- Which spare parts are available later, and how they are ordered.
The related partition sliding systems listing makes the same point from the other side: track, hardware and opening dimensions are project-specific items to confirm, not catalogue constants.
4. Where the glass panel sits next to the rest of the joinery
Sliding panels rarely arrive alone. In a bedroom they meet wardrobe fronts; in an open-plan living area they meet wall panelling and media walls; in a bathroom they meet tiled surfaces and fixed screens. Ordering the sliding panels, the closet sliding panels and the surrounding wall panel systems from one supplier means one set of site dimensions, one finish schedule and one production run.
It also removes the argument that appears on site when a reveal is 8 mm out: the panel supplier blames the wall supplier. With one party responsible for both, the tolerance has to be resolved before anything is cut.
5. Finish matching across the project
Frame colour, glass tint and surface texture are chosen from sample cards, and photographs never match a physical sample. Ask for the actual frame profile sample and the glass or laminate swatch in the finish you intend to order, and check them against the flooring, cabinetry and lighting already selected for the project. If the panels must sit beside textured sliding panels or acoustic sliding panels elsewhere in the same building, compare the two lines side by side at the same time, not weeks apart.
6. What is included between the factory and handover
| Item to confirm | Why it belongs in the comparison |
|---|---|
| Packaging and crating of glazed leaves | Glass travels badly in poorly packed cartons; ask how leaves are separated, edged and blocked in the crate. |
| Freight mode and delivery point | SANTERSON's service pages describe freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery; confirm the quoted Incoterms and who clears import formalities. |
| Site dimensions and sign-off before production | Made-to-measure work locks the moment it enters production. Agree who measures, who signs off and what happens if a level changes on site. |
| Installation method and responsibility | The company lists installation and after-sales support among its services; confirm who fits the track, who glazes on site and what inspection takes place at handover. |
| Spare parts and warranty terms | Ask for the written warranty scope and the lead time on replacement runners or a replacement leaf. |
7. Comparing like with like across the range
A glass panel is one of several ways to close an opening, and a good supplier will tell you when it is the wrong answer. Within the same sliding panel collection there are wooden sliding panels for opaque screens and acoustic panels where speech privacy, not daylight, is the brief. Compare them on the same sheet: required privacy, light transmission, cleaning, weight, and how each finish holds up to the traffic the space receives.
Where the screen also has to hide or reveal a television, the sliding panel TV systems line is a different build with cable routing and equipment ventilation behind it, so price it separately rather than substituting it for a plain wall panel.
A short pre-order checklist
- Drawing with clear openings, finished levels and the stacking direction marked.
- Written glazing specification, thickness and safety requirement for the location.
- Hardware schedule: runners, guides, handles, locks, bumpers — and who supplies them.
- Physical samples of frame finish and glass tint, approved before production.
- Named sign-off point for site measurements, with a date.
- Delivery terms, packing method and the party responsible for import clearance.
- Installation responsibility, snag list at handover, and spare-part lead times.