A two tone lacquer wardrobe looks simple on a drawing: one pale field, one dark field, a clean line between them. That is exactly why it goes wrong so easily. Once the panels are sprayed, almost nothing about the colour split, the panel thickness or the internal layout can still be changed without re-manufacturing. Below is the checklist we ask buyers and project teams to close out before production starts on Two Tone Lacquer Wardrobes or any made-to-measure lacquer wardrobe in the same family.
1. The measured opening, not the drawing dimension
Wardrobe carcasses are built to millimetre tolerance; walls rarely are. Before anything is cut, we need the finished-floor level, the true ceiling height at several points, and confirmation of what sits behind the wall — skirting that will be removed, a beam, a column, trunking, or an air-conditioning return. Tell us which surfaces are already finished, because a scribe or filler strip looks different against plaster than against stone.
- Three width readings and three height readings per opening, taken at top, middle and bottom
- Wall squareness: the difference between the two diagonal readings
- Floor finish build-up if tiling or flooring is still to come
- Door swing direction and clearance for handles in a corridor or a bedroom doorway
2. Where the two tones meet, and how they meet
"Two tone" is not one specification. Two decisions decide the look and the price, and both have to be on the drawing before the colour schedule is signed off.
| Decision | What to fix on the drawing |
|---|---|
| Split pattern | Vertical banding, horizontal banding, dark frame around pale doors, alternating doors, or one accent door in an otherwise single-colour run. State which leaf carries which tone. |
| Tone assignment per component | Doors, carcass edges, top panel, plinth, reveal/scribe and internal shelves are separate parts. Say explicitly which of them follow which colour; a pale door on a dark carcass reads very differently from tone-on-tone. |
| Sheen pairing | Two tones can be paired at the same sheen or deliberately contrasted, for example a gloss field with a matt frame. Gloss and matt of one colour are not interchangeable samples — request both. |
| Joint at the meeting line | Whether the two finishes butt on a visible joint, meet on a moulding, or wrap around an edge. Wrapping a lacquer edge across a mitre costs more and is where colour mismatch shows first. |
3. Colour samples against your own materials
Lacquer colour is judged by reflection, so a swatch on the desk tells you little. Approve samples held against the actual flooring, wall finish and lighting of the room, and check them in daylight as well as under the fitting that will be on at night. For projects with several bedroom types or repeated apartment units, sign off one physical reference set and record it by code, so later batches are matched to an approved object rather than to a screen image.
Two practical points buyers often miss: gloss lacquer shows fingerprints and edge wear far more on the dark tone of a pair, and pale doors beside a dark frame make every dust line at the joint visible. If the wardrobe sits next to a window with direct sun, raise that with us before the colour schedule is fixed — we will flag which finishes are better specified elsewhere in the room.
4. Sheen and surface quality expectations
High gloss lacquer is a flat, mirror-like field, and that is where disputes start. Agree before production what "acceptable" means for orange-peel, dust inclusion and the visibility of the panel edge, and agree how panels will be inspected — viewing distance, lighting angle, and which faces are visible faces. For runs of more than one wardrobe in a project, ask us to produce the visible doors of the first unit for your inspection before the rest of the batch is sprayed.
If the room needs a softer surface, compare the same colour at low sheen with our Matte Lacquer Wardrobes, and where a project mixes wardrobes with kitchen or media joinery, keep the sheen schedule consistent across both — see two tone lacquer cabinets for the matching kitchen finish family.
5. Substrate and edge treatment
Lacquer is a finish, not a board. Confirm with us which substrate carries the doors and carcass, how the edges are treated (lacquered wrap, ABS edge, or a machined profile), and what radius that edge takes — a tight radius reads sharp and modern but is thinner at the corner and more exposed to knocks than a softened one. This matters most on the dark tone, where a chipped pale edge underneath is instantly visible.
6. Interior layout agreed before the doors are ordered
The internal plan is cheap to change on paper and expensive to change in the workshop. Settle hanging heights by garment type, drawer count and depth, shelf spans and whether any shelf carries heavy items, plus provisions for a valet rod, trouser pull, lighting inside the carcass, or a safe. Confirm what the doors clear when open with the interior fully loaded.
Also decide now whether the unit is built-in to the opening or a freestanding run, and whether the top reaches the ceiling or stops below it with a filler — an unfinished gap at the ceiling is one of the most common snags at handover.
7. Hardware, doors and clearances
- Hinged, sliding or open: sliding needs track depth and a level floor; hinged needs swing clearance and room behind the door for handles
- Handleless grooved edge, integrated profile, or surface handle — a lacquered grooved edge is a different panel build from a handled one
- Hinge brand and closing action to be written into the order, not left to the workshop
- If glass appears anywhere in the elevation, specify it at the same time as the lacquer; see Glass & Lacquer Combination Wardrobes for that combination
8. Packaging, site access and sequence of works
Tall lacquered panels are damaged in transit and on site far more often than in the workshop. Confirm the packaging standard, panel weights, and whether the largest leaf physically reaches the room — stairwells, lifts, turning corners and door thresholds decide maximum panel size as much as the opening does. Then fix the sequence: wardrobes go in after painting, flooring and electrical first fix are complete, and the site is dry.
9. Documentation before production release
A production release should carry a signed set of dimensions, an elevation with tone codes on every part, a sheen schedule, an approved physical sample reference, the hardware list and the internal layout. Anything missing at this stage becomes a variation later. Our Custom & OEM Service covers bespoke finishes, textures and prototyping, so drawings and samples go back and forth until the schedule is right — it is the step that protects the delivery date afterwards.
Before you place the order: measured openings taken on site, tone assignment for every component, sheen pairing confirmed with physical samples in the room, edge treatment chosen, interior layout frozen, hardware listed, and access route checked for the largest panel. Send us those six items and production can start without a single query.
SANTERSON manufactures made-to-measure lacquer wardrobes for villas, apartments and hospitality projects, with specification support from drawing stage through to site installation. If you have a room elevation or a dimension list, send it over and we will return a build proposal against the checklist above.