A set of painted shaker cabinets is usually one of the longer-lead items in a kitchen fit-out. The five-piece frame-and-panel door, the paint colour and the made-to-measure case sizes all have to be agreed before production starts, so an enquiry that arrives with drawings, quantities and finish decisions already organised comes back with a usable quotation instead of a list of follow-up questions. Here is what to gather first.
1. Room dimensions and the layout you are working to
Send measured drawings, not a photograph of a floor plan. For each wall run, note the length, ceiling height, and the position of anything that constrains the cabinetry: windows and sills, radiators, gas or water points, extract ducting, switches, sockets and doors including their swing direction. Mark the finished floor level and any planned floor build-up, because that changes worktop height.
- A scaled plan plus two elevations is enough to start a layout discussion.
- Note the appliance list with model numbers, so tall housings, oven columns and integrated fridge positions can be sized around them.
- If you are working from a design intent rather than final drawings, say so plainly; a supplier can then treat heights and depths as provisional.
Shaker doors are often specified for their proportions, so the height of each door matters. A run of short wall units with shallow drawers reads differently from full-height pantries with tall doors, and that choice affects both cost and how the kitchen looks once installed.
2. Door style, paint system and colour reference
"Painted shaker" covers a wide range of work. Tell the supplier what you actually expect on site:
- Rail and stile widths. A slim, modern frame sits differently from a broad traditional one.
- Panel detail. Raised or recessed centre panel, and whether the edges are square or slightly eased.
- Paint system and sheen. Say whether you want a sprayed finish and the sheen level you expect for a kitchen that gets daily use.
- Colour reference. Give a paint brand and code, or a physical sample. Where possible, ask for a painted sample door or a small test panel before confirming a full order; colour under kitchen lighting rarely matches a screen.
Also state the interior finish of the carcasses and whether you want matching or contrasting interiors. This is easy to overlook and expensive to change later.
3. A schedule of units, not just a mood board
A simple unit schedule turns an enquiry into something a manufacturer can price. For each run, list the unit type and its intended width and height, then add the internal fittings you want.
| Item to specify | Why the supplier needs it |
|---|---|
| Unit type and size | Determines case construction, door sizes and how the run is assembled on site. |
| Drawer or door | Drawer banks cost more than doors but change what fits inside. |
| Internal fittings | Lazy Susan corner cabinets, pull-out larder racking and pull-out laundry hampers each need their own minimum widths. |
| Corner treatment | Diagonal housing, lazy Susan or blind corner units all use the same corner differently. |
| Worktop and upstand | Stone thickness sets the supporting structure and the scribe detail at the wall. |
| Handle or handleless | Profile choice affects door edges, drawer fronts and the clearance between worktop and upper units. |
If you are comparing a shaker kitchen with flatter-fronted alternatives, look at the wider range of custom kitchen cabinets for residential and hotel projects so that both options are quoted on the same basis: same wall runs, same appliances, same internal fittings.
4. Project context: one home or many identical units
A single villa kitchen and forty apartment kitchens are quoted and produced differently. For multi-unit work, provide the unit count, the number of repeated kitchen types, and whether any unit differs from the standard layout. Identify the storage and appliance requirements for each unit type, since a compact apartment kitchen and a show home kitchen rarely share a specification.
Where cabinetry is part of a wider fit-out, say what else travels with it. Turnkey interior project solutions cover the coordination of built-in furniture alongside flooring, wall finishes, lighting and sanitaryware, which means one set of drawings, one production schedule and one delivery window rather than several trades chasing each other.
5. Delivery, packaging and site conditions
Cabinetry arrives long before it is installed, so site questions belong in the enquiry:
- Delivery address and access. Floor level, lift dimensions, parking restrictions and whether a crane or hoist is needed.
- Staging. For staged sites, ask for the run to be packed in installation sequence rather than by unit type.
- Packaging. Confirm how painted doors are protected against chipping in transit and what packaging can be returned or recycled on site.
- Storage on site. Painted components and board-based carcasses need dry, level storage; state whether that exists.
For cross-border orders, request the shipping terms in writing: which party arranges freight, who handles customs clearance, and what the quoted price includes up to the site door. Ask how damaged items are documented on arrival and how replacements are produced, because one wrong-size door can hold up an entire installation.
6. What a good supplier should send back
Judge a supplier by the quality of their first reply. A competent response includes:
- A marked-up layout showing unit sizes, door directions and any clearance problems they have spotted.
- An itemised quotation by run, so substitutions are visible rather than buried in a lump sum.
- Confirmation of the paint system, sheen and colour reference, plus whether a sample is included.
- A production and delivery schedule with the date the drawings must be signed off.
- The assumptions behind the price: what is excluded, and what changes would alter it.
Ask for the assembly method as well. Pre-assembled cases speed up installation; flat-packed cases are easier to move through narrow access. Both are legitimate answers, but they change labour time on site.
A short pre-enquiry checklist
- Scaled plan and elevations with ceiling heights, services and openings marked
- Appliance list with model numbers
- Unit schedule with sizes, drawer or door choice, and internal fittings
- Rail and stile width, panel detail, paint system and sheen
- Colour reference plus a request for a sample before confirmation
- Carcass interior finish and worktop specification
- Unit count and repeated layout types for multi-unit projects
- Delivery address, access constraints and required delivery window
- Written shipping terms and the damage-and-replacement process
Bring those nine items to your first conversation and most suppliers can return a priced, buildable proposal in one round rather than three.