How to Request a Custom Quote for Outdoor Swim Spa WS-S10-T

A ten-metre swim spa is not something you order off a page. It arrives as an engineered shell with pumps, jets and a control system, and it carries electrical and structural duties that have to line up with the site it will sit on. If your project is considering the Outdoor Swim Spa WS-S10-T, the quotation request is where most of the value is decided: send complete inputs in the first message and you get a price you can build from and compare, rather than three different numbers from three different suppliers.

This guide sets out exactly what to send when you ask for a custom quote on the WS-S10-T, which specification items are fixed by the model, which ones you choose, and how the same information package feeds into design, production and delivery under our turnkey project service.

What the WS-S10-T Is Built For

The WS-S10-T sits in our configurable outdoor swim and hydrotherapy range. The long, narrow basin is designed for two uses at once: swimming against a generated current, and jet-based hydrotherapy at the other end of the basin. The "T" designation on this model refers to the swim training system included in the listed configuration, which is the main difference from the otherwise similar Outdoor Swim Spa WS-S10 in the same range.

Because it is a self-contained unit rather than an excavated concrete pool, the WS-S10-T is usually specified for villa gardens, resort terraces and wellness areas where a separate plant room would be difficult to justify. It also appears as one line in the outdoor scope of a villa project, ordered alongside outdoor furniture for villas and resorts, paving and shading structures.

The range is configured rather than fixed, which is where the quotation work begins: two orders for this model can carry different filtration, heating and entry arrangements depending on what the buyer asked us to price.

What the Catalog Lists for This Model

Before you write to us, it helps to know which figures are already set by the model. These come from the product listing for the WS-S10-T, so you do not need to request them:

Specification itemAs listed for WS-S10-T
ModelWS-S10-T
Catalog dimensions (L x W x H)10000 x 2200 x 1420 mm
Control system1 set
Swim training system1 set
Water pump2 pcs
Filter pump1 pc
Jet total76 pcs
LED lighting1 main light plus 40 small LED lights
Total power (listed)7.65 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Treat those figures as planning references rather than construction data. The equipment that ships with your order is confirmed on the quotation and the configuration sheet, so use those documents — not the summary table — for electrical design, structural loading and clearance checks.

The Six Inputs That Make a Quote Comparable

Every enquiry that reaches us with these six items can be priced in one pass, and the resulting quotation can be compared line by line against any other offer you receive.

1. The exact model code, not a size description

Write "WS-S10-T" in the subject line and the body of the enquiry. Within this range, model suffixes carry real equipment differences — the swim training system being the clearest example on this unit. A request phrased as "a 10 metre swim spa with jets" will come back with a configuration you did not ask for.

2. Site conditions and access

Tell us where the unit is going and how it gets there: ground-floor slab, rooftop terrace, sunken courtyard or an indoor plant room. Give the clear opening widths, lift or crane availability, and the distance from the delivery vehicle to the final position. A ten-metre shell needs a usable access route, and that route decides whether we split the shipment, specify a lifting plan, or advise you on a shorter model.

3. Power supply available at the site

Send the local supply details: voltage, frequency, single-phase or three-phase, and where the distribution board sits relative to the spa position. The listed total power for this model is 7.65 kW before any optional heating or sterilisation equipment is added, so the options you select change the circuit design. Your electrical contractor should size the circuit from the configuration drawings that come with your quotation.

4. Options you want priced

The catalog lists configurable options for this range, and availability and compatibility vary by model. Ask us to price them as separate line items so you can decide on budget later without re-quoting:

  • Heat pump — price it if the unit is intended for use in a cool climate.
  • Insulation package — the main lever on running cost for a unit that heats and filters continuously.
  • UV sterilisation, alongside the ozone system listed for this model.
  • Sand filtration as an alternative to the standard filter arrangement.
  • Steps and entry arrangement, including which end of the basin they sit at.
  • Water pumps and control components if you want spares held on site.

5. Quantity and project context

One unit for a private villa and eight units for a resort wellness floor are quoted and shipped differently, and the same is true if the spa is part of a larger package that includes interior fixtures, cabinetry or building materials. Say what the wider project is; grouping shipments into one container usually costs less than arranging each order separately.

6. Delivery terms and destination

Give the port or site address, the Incoterm you want priced, and any documents your import process requires. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail along with commercial paperwork such as invoices, packing lists and certificates of origin, so tell us whether you want a port price or a delivered-to-site price. Import requirements differ by country and are confirmed case by case with your customs broker.

How to Read the Quotation When It Arrives

A usable quotation for this product separates four things. If any of them are merged into one figure, ask for the breakdown before you compare prices:

  • Base unit — the WS-S10-T shell with the pumps, jets, control system and swim training system listed for the model.
  • Options — heat pump, insulation, UV, sand filtration, steps, spares, each on its own line.
  • Packaging and freight — how the unit is crated, how many containers or flat racks it needs, and the transport leg priced.
  • Exclusions — civil works, crane hire, local electrical connection, permits and any site preparation. These are normally carried out by your local contractors to the drawings we supply.

Check that the equipment list on the quotation matches the configuration you asked for, item by item. If a component is substituted, ask for the replacement to be named in writing rather than covered by a generic "or equivalent" clause.

What Happens After You Confirm the Order

The swim spa follows the sequence set out on our services page. Once the specification and quotation are agreed, we move into production with quality control on the unit as built, then packing and shipping under the agreed terms, then delivery coordination at destination. Our installation and after-sales support service covers commissioning guidance, inspection of the delivered unit against the order, spare parts and ongoing maintenance enquiries.

If you are specifying the spa as part of a fit-out rather than buying it alone, the same enquiry can carry the surrounding scope — custom and OEM work for poolside cabinetry and storage, shading structures, terrace furniture and wall or ceiling finishes. Coordinating those items on one production schedule is what keeps a handover date intact.

Questions Buyers Ask Before Requesting the Quote

Can the finish be matched to my project palette?

The cabinet and cladding finishes on this range can be discussed against your project's material schedule. Send the reference and we will confirm what is available for this model rather than assuming a match.

Is the unit delivered complete and ready to run?

The unit ships as a factory-assembled shell with its equipment installed, ready for connection. Site works — foundation or plinth, electrical supply, drainage where required, and final commissioning — are carried out locally against our drawings.

What if my site cannot take a ten-metre unit?

Send the access constraint with your enquiry. The range includes shorter models in the same swimming pools and swim spas category, and we will recommend the configuration that fits the site instead of forcing a crane plan.

Can I see the full specification before committing?

Yes. The quotation and configuration sheet list the equipment actually supplied for your order, and that is the document your engineers should design from.

Quick checklist to paste into your enquiry: model code WS-S10-T; site type and access route with clear widths; local supply voltage, frequency and phase; options to price (heat pump, insulation, UV, sand filtration, steps); quantity and wider project scope; destination address and preferred Incoterm. With those six inputs we can return a quotation you can compare properly.

Send your WS-S10-T enquiry through our contact page, or reach the project team directly — contact name PHILLIP, phone and WhatsApp +86-13928214007, email santerson@qq.com. Enquiries are handled Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).