A door schedule rarely tells a factory enough. Panel proportions, frame depth, swing direction and finish system are the details that decide whether a set of classic panel hinged doors arrives as designed or needs to be remade. This guide sets out what to send a manufacturer so the first production run is the right one.
Start With the Opening, Not the Door
Classic panelled doors sit in openings that were built for something else more often than not. Before any styling discussion, send the manufacturer the structural facts of each opening:
- Clear opening width and height at three points across the width and three down the height, taken from finished floor and finished wall faces.
- Finished floor level at the threshold, plus any change in level between rooms.
- Wall build-up: what sits behind the plasterboard or lining, and whether the head and jambs allow a fixed frame or need an adjustable one.
- Distance from the finished wall face to the nearest obstruction, which governs how far the leaf can swing and whether hardware will foul skirtings, furniture or a return wall.
- Floor covering at the threshold and its thickness, so the undercut is cut to suit rather than guessed.
Our doors are made to measure for each project, so we work from these measurements directly. Where a project has more than one unit type, group identical openings into a single schedule line and give each line its own reference number; that single habit removes most of the confusion during production and installation.
Specify the Panel Layout in Drawing Terms
"Classic panel" covers a wide range of looks, and two drawings can both read as classic while producing completely different doors. For every unit type, state:
- Number of panels, their vertical arrangement, and whether the bottom rail is short with a deep lower panel or long with equal panels above.
- Mould profile of the stiles and rails: square-edged, bolection, or a shadow-gap detail where the door must read as flush with the wall.
- Panel field treatment: solid panel, raised panel, recessed panel, or a glazed field with a glazing bead.
- Total leaf thickness and the frame depth required to match the wall build-up.
A dimensioned elevation with the panel positions marked is worth more than an inspiration photograph. Where a reference image is used alongside a drawing, label it clearly as mood rather than construction detail; otherwise mouldings get copied from a picture that was never dimensioned.
Fix the Hanging Arrangement Before Production
Hinged doors are handed goods. Left or right handing, hinge count and hinge position all have to be settled before cutting starts:
- Swing direction and lock edge for every opening, shown on a plan rather than described in words.
- Hinge type, material finish and the number of hinges per leaf, based on leaf height and weight.
- Mortise or surface mounting, and whether hidden hinges are required for a clean reveal.
- Lock body or privacy preparation, backset, and handle height from finished floor level.
- Whether closers, door stops or acoustic seals are part of the order or supplied separately on site.
Where a run of doors must look identical along a corridor, say so explicitly. Consistent hinge spacing and consistent lock heights across a line of units is something a factory can control only when it is asked to.
Name the Finish System, Not Just the Colour
A classic panel door is usually specified by appearance, but the manufacturer needs the process behind that appearance. Specify:
- Substrate and surface: solid timber, engineered core with a veneer face, or a paint-grade surface. Our Wood Veneer Hinged Doors are specified by veneer species and grain direction, while paint-grade units need the sheen level stated instead.
- Finish type: lacquer, matte lacquer, high-gloss, laminated surface or site-painted. State whether the finish is applied in the factory or left for site decoration.
- Edge treatment on visible arrises and any break edges where the door meets architraves or a flush wall detail.
- Reference standard for colour: a named paint code, a physical sample, or both. A screen value is never a finish specification.
Where doors must align with wall panelling or concealed openings in the same room, raise it at the enquiry stage. Our Decorative Interior Doors and integrated door and panelling work are coordinated as one package so the reveal and shadow gap match across materials.
Decide How the Door Meets the Wall
Two classic panel doors can look entirely different once installed, depending on the frame detail. Confirm with the manufacturer:
- Architraved or architrave-free, and the width of any architrave in relation to skirting.
- Frame face set flush, rebated or recessed relative to the finished wall face.
- Threshold detail, including any transition strip allowance between floor finishes.
- Whether the frame is fixed, adjustable or wrap-around, based on the wall build-up you measured.
If a project mixes styles, keep them in separate schedule lines. Our Classic Panel Hinged Doors are configured per project for finish, layout and dimensions, so one order can carry several unit types as long as each is documented on its own line.
What a Complete Enquiry Pack Looks Like
| Item | What to include |
|---|---|
| Door schedule | Reference number, quantity, opening width and height, leaf thickness, frame type |
| Elevations | Panel layout with dimensions, mould profile, edge and arris detail |
| Plans | Swing direction, handing, obstruction clearances |
| Ironmongery list | Hinge type and count, lock body, handle height, closers or seals |
| Finish sheet | Substrate, veneer species or paint code, sheen level, factory or site finish |
| Interface notes | Architrave detail, threshold and floor levels, adjacent panelling |
| Delivery plan | Site address, packing sequence by room or floor, storage conditions on site |
Confirm Before Cutting
Ask for an approval drawing back for each unit type, showing the dimensions you supplied, the panel layout, the handing and the finish reference. Check that the drawing matches your schedule line by line before authorising production; a correction at approval stage costs hours, while the same correction after machining costs a replacement door.
Where the project also covers cabinetry, wardrobes or wall panelling, place those items with the same enquiry. Doors, joinery and panelling drawn from one set of finished levels and one finish reference stay consistent across the building, which is where a single supplier carrying the whole fit-out earns its place.
Send us your door schedule, elevations and finish references and we will return approval drawings for each unit type before production starts. Details of our Custom & OEM Service, including prototyping and bespoke finishes, are on the service page, and enquiries can be sent through our contact page.