A set of interior doors looks simple on a drawing. It is one rectangle per opening, a swing direction, a finish name. Yet doors are usually the first element a buyer has to replace after handover when the information handed to the factory was incomplete. Before your standard interior hinged doors go into production, the items below are the ones worth putting in writing.

1. The opening, not the drawing dimension

Shop drawings give you a nominal opening. What the factory needs is the finished opening after floor levels, wall finishes, plasterboard, skirting and any waterproofing build-up are accounted for. A door made to an unfinished dimension either needs packing out on site or leaves a gap that has to be covered with architrave.

  • Width and height at three points each, taken on site after the wet trades are complete.
  • Floor finish thickness at the threshold, on both sides of the opening.
  • Wall build-up and total reveal depth, so the frame can be ordered to match.
  • Out-of-plumb and out-of-square allowances, and who is responsible for bringing the opening into tolerance.

2. Leaf size, not just opening size

The clear opening a door actually gives you is smaller than the hole in the wall. Frame sections, hinge rebates and the required side and top gaps all take their share. Confirm which of the two numbers your specification is quoting, because a leaf ordered to the opening dimension will not fit.

  • Leaf width and height after the frame allowance.
  • Undercut or threshold detail, and the ventilation gap where one is required.
  • Whether double-leaf openings are equal halves or an unequal pair with an active and a fixed leaf.

3. Swing direction and hinge handing

Handing errors are the most common door problem on site, and they cannot be corrected once the rebate is cut. Record the swing for every single opening against a room schedule, not as a general note.

  • Left or right hand, and whether the leaf opens into the room or out of it.
  • Whether the leaf needs to be capable of being reversed on site, or is handed permanently.
  • Obstruction check: furniture layouts, sanitaryware, radiators, wall lights and switch positions.

4. Hardware package and load path

Hinges carry the leaf; the lock body, strike and handles define the edge preparation. Order them as one coordinated package rather than letting each line item arrive from a different source.

  • Hinge type, grade and quantity per leaf, based on leaf size and weight.
  • Lock case or privacy set, cylinder type, and whether the door is keying into an existing scheme.
  • Handle material and rose style, matching ironmongery used elsewhere in the project.
  • Door closer, drop bolt, flush bolt or fire-rated hardware where specified.
  • Astragal, edge bolsters and any intumescent strip that has to be routed into the leaf edge.

5. Core construction and face finish

Two doors can look identical on a rendering and behave completely differently once installed. The core decides weight, sound behaviour and how the edge takes a hinge screw; the face finish decides whether the door matches the joinery beside it.

DecisionWhat to confirm before production
Core typeSolid, semi-solid or hollow core, and where each is specified in the schedule.
Face finishPaint-grade surface, laminate, lacquer or wood veneer; for wood veneer hinged doors, confirm species, cut direction and grain matching across the set.
Panel styleFlat or classic panel hinged doors; rail and stile widths, and moulding profile where panels are used.
Edge detailSquare, rounded or bevelled edge, and whether edges are finished all round before hanging.
Moisture exposureBathroom, laundry and kitchen openings need a core and finish suited to humidity, plus the correct undercut.

6. Flush and concealed details need early decisions

If your design calls for a door that disappears into the wall, the frame, pivot and finishing allowance have to be resolved before the wall is closed up, not at door order stage. Concealed frames sit inside the wall build-up, so wall thickness, plaster return and the shadow gap profile all become fixed constraints.

  • Frame finish and whether the leaf is to be finished to match the surrounding wall or contrast with it.
  • Concealed hinge type and the adjustment range available after installation.
  • Flush interior doors and flush hinged doors in the same project should be coordinated with the wall panel schedule so reveals and reveal stops match.
  • Whether architraves are being removed entirely, which changes the setting-out tolerance on every opening.

7. Consistency across the whole set

Doors are bought as a package and judged as one. Mixing production batches or suppliers is where heights, grain and sheen start to drift.

  • One consistent top level for all leaves on a floor, with the variation documented.
  • Veneer leaves from a single log batch, numbered and laid out before crating.
  • Identical paint system and sheen level across every leaf, frame and architrave.
  • Spare leaves held for the openings most likely to be damaged during later site works.

8. Packaging, sequence and site handling

A door delivered to the wrong floor or stacked flat on a wet slab is a door that has to be replaced. Specify how the set arrives and where it is stored.

  • Crate labelling keyed to the room schedule, opening by opening.
  • Delivery sequence matching the installation programme, not one bulk drop.
  • Storage condition on site: dry, ventilated, standing upright, acclimatised before hanging.
  • Protection until handover, including who removes and disposes of packaging.

9. Who signs off what, and when

Most door disputes trace back to an approval that was verbal. Put a sign-off point before the cutting list is released, and another before finishing.

  • A door schedule with every opening numbered, handed and dimensioned, issued for written confirmation.
  • A physical or digital finish sample approved against the joinery and flooring it sits next to.
  • Named responsibility for on-site verification of openings, and for making good any opening out of tolerance.
  • An inspection point at delivery, before crates go into the lifts.

If you are coordinating doors with the rest of the fit-out, ordering them as part of a single package with integrated door and paneling removes the matching problem entirely: one cutting list, one production run, one delivery sequence.

A short pre-production checklist

  • Finished opening dimensions measured on site after wet trades.
  • Leaf size confirmed separately from opening size.
  • Handing and swing recorded for every opening in a room schedule.
  • Hardware package specified as one set, with load rating checked against leaf weight.
  • Core type and face finish approved against samples.
  • Concealed frame details resolved before wall closure.
  • Whole set produced together, numbered and batched.
  • Packaging, delivery sequence and storage defined in the programme.
  • Written sign-off obtained before cutting begins.