A quotation for the Outdoor Swim Spa WS-S06B can look complete on the first read and still leave the buyer unable to compare it against another supplier. This guide walks through the five places where proposals for this model most often differ, and what to ask the manufacturer to put in writing before you sign.
What the WS-S06B actually is
The WS-S06B sits in the configurable outdoor swim and hydrotherapy range that SANTERSON manufactures alongside its furniture and building materials. It is a self-contained acrylic-shell spa intended for gardens, terraces and villa or resort outdoor areas, supplied as part of a wider project package rather than as an off-the-shelf retail item.
Two facts about this product family change how you should read any proposal. First, the equipment fitted to a given model depends on the configuration chosen for your project. Second, optional items such as heat pumps, UV sterilization, sand filtration, insulation and steps are quoted separately, so two proposals carrying the same model code can describe different machines.
Check 1: Match the model code to the dimensions on the drawing
The catalogue entry for the WS-S06B lists a footprint of 5800 × 2200 mm and a depth of 1250 mm. Compare those numbers with the site plan or landscape drawing your designer issued, including clearance for access, plant equipment and any cover or enclosure.
The same S06 series carries closely related variants with different depths and features, so a single letter in the code changes the machine:
| Model | Catalogue dimensions (mm) | Features shown on the product page |
|---|---|---|
| Outdoor Swim Spa WS-S06B | 5800 × 2200 × 1250 | Water jets, LED lighting, Ozone, Waterfall |
| Outdoor Swim Spa WS-S06B-T | 5800 × 2200 × 1420 | Water jets, Temperature setting, LED lighting, Ozone, Swim training system |
| Outdoor Swim Spa WS-S06C | 5880 × 2380 × 1400 | Water jets, Temperature setting, LED lighting, Ozone |
Ask the manufacturer to confirm in writing which variant the price covers. The variants that list a swim training system are the ones carrying "-T" in the code, and they are quoted differently from the plain WS-S06B.
Check 2: Read the pump and jet schedule line by line
For the WS-S06B, the specification area of the product page records three water pumps, one filter pump, a total of 48 jets, three LED lights plus 26 small LED lights, one control system, and a total power figure of 13.35 kW. That schedule is what you should be comparing between suppliers, not a headline phrase such as "full hydrotherapy package".
A useful cross-check is the sibling model. The WS-S06B-T lists one water pump, 40 jets and a total power of 8.75 kW, against the WS-S06B's three water pumps, 48 jets and 13.35 kW. Same length, same width, a different equipment set — which is why two proposals for "an S06" can differ by several kilowatts while looking equally complete.
Check 3: Confirm what is optional and priced separately
Catalogue-listed options for this range include control systems, UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps. Decide before you request quotations which of these your project needs, then send the same option list to every supplier so the totals are comparable.
- Heat pump and insulation — determine whether the spa will be used year-round or seasonally, and ask for the heating arrangement quoted for your climate.
- Filtration — confirm whether a filter pump alone is included or whether sand filtration has been added to the price.
- Sterilization — ozone appears on the standard feature list; UV sterilization is an option, so check which one your quotation covers.
- Steps and access — confirm whether steps are supplied, and who provides the surrounding deck or platform.
Check 4: Electrical and site preparation scope
A total power figure of 13.35 kW on a proposal is not an installation instruction. Before you accept it, ask the manufacturer for:
- The supply requirement for the quoted configuration: phase, voltage and dedicated circuit sizing.
- Location and rating of the control system, and whether isolators or residual-current protection must be provided locally.
- Cable routing and termination points, so your electrician can price the same work as every other bidder.
- Drainage, base or slab requirements, and the access route for delivery to the terrace or garden position.
Electrical connection, foundation work and any local permits normally sit with the buyer's local contractors. Put that split of responsibility in writing early; it is the most common source of a stalled swim spa installation.
Where proposals for this model usually differ
Very few buyers order a swim spa on its own. In a villa or hospitality fit-out it usually travels with outdoor furniture, paving, lighting and cabinetry from the same supplier. That is where a single coordinated supplier earns its place: one production schedule, one consolidated container plan and one point of contact for the whole outdoor package.
SANTERSON's turnkey solutions cover consultation, design and planning, production, logistics, installation and after-sales as one workflow, with freight forwarding and door-to-door delivery by sea, air and rail, customs paperwork and container loading handled centrally. When you assess a proposal, ask how the spa is sequenced against the other items: whether it ships in the same container as the terrace furniture, and what inspection is carried out on the shell before it leaves the factory.
If your project needs a different footprint, the range also includes customizable shape outdoor spas in square, round, oval and curved layouts with an acrylic shell and structural reinforcement, which is worth requesting when a standard rectangular model will not sit on the planned terrace.
Check 5: After-sales terms for a machine you cannot easily return
A swim spa crosses an ocean, so spares and support matter more than they would for a domestic purchase. Ask specifically for:
- The warranty period and what it covers: shell, jets, pumps, control system and lighting are usually warranted separately.
- Which wearing parts ship with the unit, and how replacements are sent afterwards.
- Commissioning support at handover — remote guidance or an on-site visit — and who is responsible for first filling and water balancing.
- A written as-built pack: equipment list, wiring diagram and spare-parts schedule for the delivered configuration.
The supplier's installation and after-sales support covers on-site installation, inspection and snags, warranty coverage and spare parts. Ask how each of those applies to a spa delivered to your site, and get the response in writing.
A short scoring sheet before you sign
- Model code on the quotation matches the model code on the drawing and in the specification table.
- Pump count, jet total, lighting count and total power are itemised, not summarised.
- Options such as heat pump, UV, sand filtration, insulation and steps are priced line by line.
- Electrical supply requirement is stated for the quoted configuration.
- Site preparation, foundation and local electrical work are assigned to a named party.
- Shipping route, packaging and container plan are described for the whole outdoor package.
- Warranty terms and spare-parts supply are written down, not promised verbally.
A proposal that clears all seven lines is comparable with its competitors. A proposal that clears three or fewer is not a cheaper machine — it is an incomplete one.
What to verify about the manufacturer itself
Product detail is only half of a proposal. The other half is whether the company behind it can carry an outdoor package through production, freight and handover. Before you commit, check that the supplier names its manufacturing base and factory operations, shows completed outdoor or villa projects with locations you can see on its own case pages, and states who handles freight, customs paperwork, installation and warranty for your region. A manufacturer that documents these stages will answer each of them with a named process; a trading intermediary will answer with generalities.
Send your drawings, get a configuration-specific quotation
Share the terrace dimensions, intended use and the other outdoor items in your project, and the SANTERSON team will confirm which S06-series configuration fits and quote the equipment list line by line. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com.
Product dimensions, jet counts, pump counts and power figures in this article are those published on the SANTERSON product pages for the models named. Installed configuration and included equipment vary by order and must be confirmed on the quotation for your project.