A swim spa quote that only lists a model number and a price is not a quote you can compare. Before you sign for an Outdoor Swim Spa WS-PC05ST-S, the document in front of you should already answer what is included, what is optional, and what your site team has to prepare. The checklist below follows the order most procurement teams actually work in: scope first, then commercial terms, then delivery and after-sales.

1. Confirm the exact model and its published specification

Model suffixes in a swim spa range change dimensions and sometimes equipment. The catalogue entry for WS-PC05ST-S lists 5000 × 2400 × 1470 mm, while the longer variant WS-PC05ST-L is listed at 5490 × 2400 × 1470 mm with the same equipment set. If your site plan or foundation drawing was drawn from a different sheet, that 490 mm difference becomes a rework on site.

Ask for the specification table to be attached to the quote and check that the model code on the drawing, in the packing list and in the quotation header all match. The published figures for WS-PC05ST-S read: control system 1 set, swim training system 1 set, filter pump 1 pc, jet total 6 pcs, LED lights 4 pcs, total power 6.55 kW. Note that the water pump is not listed on this record, so treat any pump shown in a rendering as unconfirmed until it appears in your document.

Line itemWhat must appear on the quoteWhy it matters
Model codeWS-PC05ST-S exactly, with shell colour and cabinet finishSuffix variants share a family name but differ in length
Overall dimensionsLength × width × height in mm, plus access/step footprintDrives foundation size, crane route and door widths
Standard equipmentJets, LED lights, control system, filtration, swim training unitDefines the baseline you are paying for
Items not listedAn explicit "not included" line (e.g. water pump)Prevents two suppliers quoting different products
Total powerkW figure and the electrical duty it coversYour electrician sizes the supply from this number

2. Separate standard equipment from optional accessories

Options in this range typically cover control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs its own priced line with the part named, not a single "accessories package". A heat pump quoted without its heating capacity and noise level is hard to compare against a local equivalent; a step set quoted without dimensions may not suit your deck height.

Write both columns into the document: what ships in the crate, and what arrives separately or is excluded. If you are ordering to a bespoke specification, request that the option list be re-confirmed on the production drawing before manufacture starts.

3. Fix the electrical and site-preparation responsibilities

The 6.55 kW total power figure is a starting point, not an electrical design. Ask the supplier to state supply voltage and phase, circuit protection requirements, whether a dedicated isolator is required, and which side of the boundary each party handles. Ozone and swim training equipment affect duty as well, so ask that the quote names them explicitly rather than implying them from a photo.

  • Voltage, phase and frequency assumed in the quoted power figure
  • Cable size and isolator: supplier scope or local contractor scope
  • Foundation or plinth loading, drainage and access for service
  • Who commissions the unit on site, and what evidence is handed over

4. Read the commercial terms as carefully as the specification

A comparable quote states its Incoterms and named place, currency, deposit and balance trigger, validity period, and what happens to tooling or mould costs if you change a finish after approval. For a delivered project, confirm whether freight, insurance, customs clearance and duties are inside the price or billed later, because a low unit price with landed costs added afterwards is not a saving.

As part of a wider package, ask that swim spa lines sit in the same schedule as the rest of your building and construction materials, with separate line values. That way partial shipment and staged payment stay possible.

5. Delivery, installation and after-sales lines

Ask for packing method and container plan, the shipping route and window, tracking arrangements, and who handles import paperwork. Logistics and door-to-door delivery for this range covers freight forwarding by sea, air and rail, customs documentation, packaging and container loading, shipment tracking and delivery to site; the exact terms, duties and transit arrangement for your port are confirmed case by case in writing.

On the after-sales side, request the warranty scope in plain words: which components are covered, for how long, what counts as misuse, and how spares are supplied. Installation support, inspection with a snag list, and spare-parts supply should each appear as their own line so you can tell what is included and what is charged.

6. A quick comparison sheet before you decide

Put two or three quotes side by side using the same rows: model code, dimensions, standard equipment, options with prices, electrical duty, freight and duties, warranty, spares, installation support. Where a supplier cannot fill a row, that gap is a question to close, not a detail to assume.

If your project needs a different footprint or shape rather than a catalogue model, the same discipline applies. See our customizable shape outdoor spa for how bespoke hydrotherapy pools are specified.

Send us your draft specification and we will return a line-by-line quotation. SANTERSON is a China-based furniture and building materials supplier working on villa, hospitality and office projects, covering design consultation, custom and OEM production, door-to-door delivery, installation and after-sales support. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com.

Figures quoted above are the catalogue values published for this model; confirm them against your signed specification and drawing before ordering.