Open shelving looks simple on a drawing. A rectangle on a wall, a few lines for shelves, done. Then it reaches site: the shelf is too shallow for the linen actually stored in it, the finish does not match the vanity joinery beside it, and nobody agreed how it fixes to the tiled wall. Santerson Metal Frame Shelves is a made-to-order item in our Open Shelving range, so almost everything about the finished piece is decided by what you write in the procurement brief. This guide sets out the fields to fill in, what each one changes downstream, and how to keep the shelving consistent with the rest of the bathroom package.

What this product actually is

Metal Frame Shelves sits within our Open Shelving collection for residential bathroom projects. The catalogue entry describes it as a configurable metal-frame shelf in which finish, layout and dimensions are specified to suit each space. That wording matters when you write the brief: there is no single standard size or fixed finish list to copy from a datasheet. You state the requirement, we build to it.

Two consequences follow. First, the item is quoted per project configuration, so a brief that only says "metal frame shelves, 6 nos." cannot be priced accurately — you will get an allowance figure, not a firm price. Second, the same flexibility lets you carry one shelf detail through several bathrooms in a development, which is exactly why it is worth specifying deliberately rather than leaving to a site variation.

Where metal frame shelving earns its place

Open shelving in a bathroom does a different job from a closed cabinet. It holds what people reach for daily — folded linen, a tray of amenities, towels between changes — and it sets the tone of a wall that would otherwise be bare tiling or paint. A metal frame reads lighter than timber and sits naturally alongside the basin, shower set and floating vanity on the same floor.

In practice we see this type of shelving specified in three situations:

  • Guest and powder rooms where a full-height cabinet would crowd a small footprint, and an open shelf keeps the wall visually clear.
  • Principal bathrooms where the design wants display — stacked linen, a decorative object — next to everyday storage.
  • Built apartments and villas where the same shelf detail repeats across units or floors and has to be reproducible without one-off site joinery.

If your scheme needs enclosed storage for cleaning products or clutter, pair the open shelf with closed units instead of forcing it to do both jobs. Our Santerson Freestanding Open Shelves and wall mounted cabinets are ordered the same way, so one brief can cover the whole bathroom storage set.

The fields your brief must state

Use this as a checklist. Anything you leave blank comes back as a question during quotation, and every round of questions is programme time you do not get back.

FieldWhat to writeWhy it changes the outcome
Location and wall build-upRoom, wall material (tiled plasterboard, masonry, tile backer), and whether services run behind that wall.Determines the fixing method, and whether the substrate needs reinforcement before tiling.
Overall width and heightFinished external dimensions, plus clearance from basin, mirror and door swing.Sets the made-to-measure frame size. Clashing with a vanity or mirror is the most common site problem.
DepthClear depth needed for what is actually stored: linen fold, amenities tray, towel stack.Shelf depth drives bracket spacing and how the piece reads against adjacent joinery.
Number of shelves and spacingHow many tiers, and the vertical gap between them.Defines layout. Unequal spacing — tall bottles on one tier, stacked linen on another — has to be shown on the drawing.
Frame finishThe finish family, matched to tapware or shower fittings where an exact tone matters.Keeps metal tones consistent across basins, showers and hardware instead of near-misses on site.
Shelf faceGlass, timber-look or another surface, with thickness if your detail fixes it.Affects how heavy the shelf looks, the cleaning regime, and how it coordinates with glass shelving elsewhere in the project.
Intended loadingWhat sits on it: linen only, glassware and amenities, or heavier items.Confirming intended loading per project is what lets bracket count and fixing detail be set correctly.
Quantity and repetitionTotal pieces, and how many identical configurations across rooms or units.Grouping identical configurations simplifies production sequencing and reduces variation risk between phases.
Delivery point and phaseSite address or consolidation point, and which phase each batch belongs to.Lets batches be released against the programme rather than stored on site.

Do not assume a standard size. The catalogue listing does not publish fixed dimensions, material grades or load ratings for this item. Those are confirmed for each configuration, and that confirmation belongs to the quotation step rather than to a later variation.

Coordinating the shelf with the rest of the bathroom package

The costly mistakes on a fit-out are coordination errors, not product errors. A shelf shares its wall with three other trades: tiling, joinery and electrical.

Set-out against the tile grid

Fixings should land in a predictable place relative to the tile grid, not by accident in a joint. Send shelf widths and heights early enough that the tiling set-out drawing can allow for them, and agree whether brackets sit on a cut tile or inside a full tile.

Finish alignment with joinery and tapware

Metal frame shelving is always read next to the vanity, mirror, basin mixer and shower fittings. Specify the finish against those items rather than in isolation, and ask for a sample for approval before production release wherever the design depends on an exact tone match.

Lighting and concealed services

If the design calls for shelf or wall lighting, decide early whether cabling is concealed in the wall or surface-fed, and keep the fixing zone clear of backboxes. Where a project wants integrated lighting across a whole storage wall rather than one shelf, our Modular Shelving Systems are the better starting point: Santerson Metal Frame Modular Systems covers larger metal-frame configurations on the same made-to-measure basis.

Sample brief wording you can adapt

A short, complete entry usually reads something like this:

Santerson Metal Frame Shelves — 6 nos., one identical configuration. Guest bathrooms and principal bathrooms, Levels 2 to 4. Overall width and height per drawing reference [xx]; shelf depth and tier spacing per the interior design set-out; two shelves at unequal heights for a linen stack and for tall bottles. Frame finish to match approved tapware sample [ref]; shelf face to be confirmed by sample submission before release. Intended loading: folded linen and amenities only. Wall build-up: tiled plasterboard, no services behind the fixing zone. Delivered in two batches against the site programme; installation by others unless otherwise agreed.

That paragraph carries every field the quotation team needs, plus the coordination notes that protect the programme on site. Swap the bracketed references for your own drawing and sample numbers.

How the order moves through production

Santerson works from brief to handover rather than shipping stock lines, so a shelving order travels the same path as the cabinetry, ceramics and lighting on your project. The stages are:

  • Consultation and specification — your brief is reviewed, gaps are closed, configuration options are settled.
  • Quotation and detail confirmation — dimensions, finish and layout are signed off before production release.
  • Production and quality control — items are made to the approved configuration, with custom and OEM work handled in our own facility.
  • Packaging and shipping — freight arranged by sea, air or rail with the paperwork import needs, batched against your programme.
  • Delivery and installation support — door-to-door delivery to the agreed point, with site guidance and inspection of installed work.

For how shelving sits inside a whole-project package, see our Turnkey Solutions and Custom & OEM Service pages. Ordering shelving alongside vanities, storage units and sanitaryware in one package usually means fewer coordination documents to track and a single set of approvals to manage.

Questions that decide the specification

Is there a standard size I can specify?

No. The item is made to measure, so width, height and depth come from your set-out drawing. State the finished dimensions you need and we build to them.

Can the finish match a tapware brand I have already chosen?

Name the finish, and where an exact tone match matters supply the reference or request a sample before release. Finish approval forms part of detail confirmation.

Who installs it?

Installation can be arranged with site guidance, or carried out by your trades once the fixing method has been agreed against the wall build-up. Settle this at quotation stage so the fixing detail reaches the correct drawing.

Can I order shelving and vanities as one package?

Yes, and it is usually the better route. One brief covers double vanities, storage units and open shelving, which keeps finishes and dimensions coordinated across a single approval cycle.

What if my project has several bathroom types?

Give each type its own configuration line with a drawing reference. Group identical configurations so production and delivery batches follow your phase sequence.

Send us the brief

If you have set-out drawings for a bathroom package, send them with quantities and finish references. We will confirm the configuration, flag anything that clashes with tiling or joinery, and return an itemised quotation rather than an allowance figure. The product page is the starting point; the conversation after it is where the specification gets locked down.

Project enquiries go to PHILLIP on +86-13928214007, or through our contact page.